Attachment_-_19-FS-003_004_BIDSCH.docx
DOCX document 13 KB Posted
- Attached to
- REPLACE LINERS AND GATES PONDS 14A &14B
- Solicitation number
- 140F0319B0007
About this file
Bid Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage_Determination.pdf | ||
| A04_-_19-FS-003_004_Specs.pdf | ||
| 8-Bid_Bond_Form_SF_24.pdf | ||
| Preconst_Safety_Checklist.pdf | ||
| Sol_140F0319B0007.pdf | ||
| 19-FS-003_004_DWGS.pdf | ||
| B08_4-CPARS_Notice.pdf | ||
| 140F0319B0007_Clauses_Sol.docx | DOCX document | |
| 9-Notice_to_Offerors.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID FORM
Furnish all labor, tools, equipment, materials, superintendence, and transportation necessary to construct the project described in Block 10 of Page A1, Solicitation, Offer, and Award, Standard Form 1442 in accordance with the Technical Specifications, Drawings, and terms and conditions contained herein as follows:
Item No. Supplies/Services Quantity Unit (LS) Total Amount
BASE BID
00010 SCHEDULE I
| Re-Line Pond 14A and | ||
| Replace Pond 14A Control Gate 1 | LS | $______________ |
00020 SCHEDULE II
Re-Line Pond 14B and Replace Pond 14B Control Gate 1 LS $_______________
Total Schedules I and II $______________
LS = LUMP SUM
Bidders must bid on all items. Incomplete bids will be considered non-responsive.
BOND REQUIREMENTS: In accordance with FAR 52.228-01 and 52.2228-02, the bond requirements for bids are 20% of the bid price but shall not exceed $3 million. 100% performance and payment bond is required.
File details come from the government source that posted it.