Attach-1-REVISED SOW_0001.pdf

PDF 123 KB Posted

Attached to
SEVILLETA DEM0 PROPANE TANK INSTALL CONCRETE PAD W
Solicitation number
140F0221Q0008
Issued by

View the file

Other files

File Type Posted
Sol_140F0221Q0008_Amd_0001.pdf PDF
Attach-1-SOW.pdf PDF
Attach-3-SCA Wage Rates.pdf PDF
Attach-2-Past Perfoemance and Clauses .pdf PDF
Sol_140F0221Q0008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

Remove/Dispose of (1) Below Ground Fuel Storage Tank, Install Concrete Pad and Bollards

PART 1 – GENERAL

1.01 Scope of Work: Contractor shall provide all labor, equipment, materials and services to remove and dispose of one (1) existing belowground 1,000 gallon liquified petroleum gas (LPG) tank; and install one (1) new 1,000 gallon above ground LPG tank (tank provided) to include concrete pad and painted steel bollards, at Sevilleta National Wildlife Refuge (NWR) Visitor Center in San Acacia, New Mexico. Period of performance for requested work is April 15 - June 1, 2021.

1.02 Site Planning:

A. Tank location:

Existing tank is just south of the Sevilleta NWR Visitor Center. Provided tank will be installed in the same location but aboveground. Contractor to ensure that the new tank is at least 25’ from any structure or electrical source in accordance with NFPA 58.

B. All work will minimize impacts to the site physically and visually.

1.03 SUBMITTALS: None.

PART 2 - PRODUCTS

2.02 Tank Accessories:

A. Tank must be mounted and secured to a new 8” thick concrete slab, 4” above grade and reinforced with #4 bars 12” O.C. each way to withstand the load of the tank.

B. Contractor to install 36” x 4” steel bollards, filled with grout and top crowned, bollards to be painted (color as selected by Refuge). Bollards shall be spaced 48” apart and 60” from tank and set in concrete spot footings IAW all local, state and federal codes.

PART 3 - EXECUTION

3.01 Contractor shall provide all services and equipment to remove existing LPG tank, accessories, connections, piping, pumps and hoses. All disposal, removal and transport of materials shall be in accordance with all local, state and federal regulations. Contractor shall be responsible for removal and disposal of any remaining/ residual fuel in the tank.

3.02 Contractor install furnished tank, pad, and bollards. Coordinate work and site visits as required with Station Manager.

3.03 Work shall be in accordance with latest edition of federal, state and local environmental, mdabovich Cross-Out safety, and fire regulations; National Fire Protection Association Code and/or standards;

federal, state and local electric and plumbing codes. Electrical work (if applicable) shall be performed under the direct supervision of a licensed electrician.

3.04 A suitable concrete pad must be installed for the tank to be placed upon to include steel bollards.

3.05 The tank must be suitably anchored to withstand uplifting by high winds in accordance with the tank manufactures recommendation and Federal, State and local codes.

3.08 Clean site of all materials and debris. Ensure that all surface materials and trails, are raked and returned to their pre-work condition.

NOTE; For all technical questions or site visit please contact Kathy Granillo (505) 350-1007 email kathy_granillo@fws.gov or Rob Rayner email robert_rayner@fws.gov