Sol_140F0121R0089_Amd_0002.pdf
PDF 191 KB Posted
- Attached to
- MT-MEDICINE LAKE NWR-REHAB OBSERV TOWER
- Solicitation number
- 140F0121R0089
About this file
This amendment to a solicitation provides clarification on several points for a contract to rehabilitate an observation tower at Medicine Lake National Wildlife Refuge in Montana. The period of performance will be controlled by two notices to proceed, with construction starting in April 2022. The response due date is extended to September 3, 2021. Clarification is provided on past performance examples requested and on submitting bid bonds electronically. The scope of work involves rehabilitating the one hundred foot tall tower constructed in 1936 to current building codes, including replacing wood treads, landings, and guardrails, and repairing concrete piers to better serve public safety.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140F0121R0089 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
F06
Lakewood CO 80228-1807
134 UNION BOULEVARD
LAKE PLAZA NORTH
FWS, DIVISION OF CONTRACTING AND GE
F01
PORTLAND OR 97232-4181
911 NE 11TH AVENUE
EASTSIDE FEDERAL COMPLEX
FWS, DIVISION OF CONTRACTING AND GE
21-03308/19/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/23/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See page 2
Legacy Doc #: FWS
Period of Performance: 09/15/2021 to 03/14/2022
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Timothy Officer
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation Amendment
Document 140F0121R0089-0002
Document Title Rehabilitate Observation Tower, Medicine Lake NWR MT
A. The purpose of this amendment is to clarify the period of performance, clarify the past performance requirements and extend the proposal due date.
B. The following contractor questions and Government responses are provided for contractor use:
1. Contractor Question: The period of performance runs through most of the winter and as cited is not feasible to complete the work during the winter weather experienced in Montana. How does the Government intend to resolve this?
Government Response: The Government intends to issue two (2) Notice to Proceeds (NTP) which control the period of performance. The first NTP would allow the contractor to process material submittals, place orders for materials, equipment, invoice for certain stored materials and accomplish other administrative actions. The construction NTP would be delayed until/about April 2022 and begin the 180-calendar day period of performance. The period of performance dates cited in the solicitation document are system generated and are not controlling, the NTP controls the dates for the 180-calendar day period of performance. Certain elements of work may be coordinated with the Government and accomplished during the first NTP period. Invoicing for stored materials would be for higher valued items such as the steel and lumber. The stored materials being invoiced for would need to be available for a joint contractor and Government inventory, prior to invoicing. The Government has a 10 ft. x 20 ft. storage shed available for stored materials on-site.
2. Contractor Question: Please explain the requirements for the Past Performance cited in the Factor 2 Technical Proposal, Sub-factor 3: Organizational Capabilities and Past Performance.
Government Response: Past Performance requirements are cited in Federal Acquisition Regulation (FAR) Part 15. Specifically, 15.305 (2) Proposal Evaluation, as cited in the solicitation excerpt. For this solicitation we’ve asked for 3 to 5 recent and relevant examples of “similar building or tower type projects, which were completed by your firm within the previous five years”. We recognize this fire tower project is somewhat unique to the Department of Interior agencies, the Federal and State Forestry Services. Therefore, we chose the wording “similar building or tower type projects”. As cited in the FAR reference, 15.305 (2) past performance evaluation will:
“…(iii) The evaluation should take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition.
(iv) In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance…” Your Technical Proposal for this subfactor should explain the relevance of your past example projects, to this project. Firms that have no relevant past performance will be rated Neutral, the offeror will not be evaluated favorably or unfavorably on past performance.
Solicitation Amendment
Document 140F0121R0089-0002
Document Title Rehabilitate Observation Tower, Medicine Lake NWR MT
3. Contractor Question: Are we to provide the bid bond electronically too?
Government Response: Yes, provide a scanned copy with your proposal and mail the paper copy to the Lakewood location, cited on the SF 1442, Contracting, 134 Union Blvd, Lake Plaza North, Lakewood CO 80228.
C. The response due date and time is extended to Friday, 3 Sep 2021, 1900 hours local time. Please provide acknowledgement of this amendment. Offerors are reminded to review and fulfill the Technical Proposal requirements of the solicitation and to have an Active System of Award Management (SAM) Entity Registration.
D. All other terms and conditions remain unchanged.