Fuel Tank Transportation and Installation
Solicitation number
140F0120Q0237
Issued by

View the file

Other files

File Type Posted
Sol_140F0120Q0237_Amd_0001.pdf PDF
A04 0040501414 SOW.pdf PDF
B03 0040501414 Wage Rates.pdf PDF
Sol_140F0120Q0237.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Fish & Wildlife Service Carson National Fish Hatchery

SCOPE OF WORK

FUEL TANK REPLACEMENT

DESCRIPTION OF THE WORK

The work to be performed under this contract consists of replacing the 500 gallon diesel and 1000 gallon gasoline (1500 G total) dual tank with two 500 gallon tanks from the Ruby Lake National Wildlife Refuge;

installing new pumps on the tanks; and hauling off and properly disposing of the old 1500 gallon dual tank.

GENERAL

The Contractor shall furnish all planning, design, labor materials and equipment to perform the tasks detailed in this scope of work. The work shall include, but is not limited to the items below.

SCOPE

The 1500 fuel tank and pumps will be replaced by two 500 gallon tanks acquired from Ruby Lake National Wildlife Refuge in Ruby Valley NV. The 500 gallon tanks will be installed with new fuel pumps.

Work includes the following:

• Transport the two 500 gallon tanks from Ruby Lake NWR to Carson NFH. Each tank is 6’8” long, 4’7”wide, and 3’9”high and weighs 5,400 lbs (see attached).

• Remove and dispose of old 1500 gallon dual tank. This process may involve removing a section of the six foot chain link fence for access.

• Install the two 500 gallon tanks on to the pad and hook up electric and new fuel pumps.

• Replace section of fence, if any, that was removed.

PLACE/DELIVERY AND PERIOD OF PERFORMANCE

Work will be performed at the U.S. Fish & Wildlife Service, Carson National Fish Hatchery, 14041 Wind River Hwy, Carson WA 98610.

Invoice will be uploaded to IPP.gov

INSPECTION AND ACCEPTANCE

Inspection and Acceptance will be determined by the Technical Coordinator/Hatchery Manager or his designee.

GOVERNMENT FURNISHED EQUIPMENT OR INFORMATION

The Contractor will furnish all labor, equipment, materials, supplies, parts, tools, and service as specified in the description of Contract Scope above.

AVAILABILITY

This work can be made during weekday duty hours, Monday – Friday, 7:30 a.m. – 4:00 p.m. or at other times with approval of the Complex Manager or Hatchery Manager.

TECHNICAL COORDINATOR

Larry Zeigenfuss, Hatchery Manager, Carson NFH. Phone: 509-427-5905, Fax: 509-427-4238, Email:

larry_zeigenfuss@fws.gov mailto:larry_zeigenfuss@fws.gov

File details come from the government source that posted it. Updated .