This is a Request for Quotation (RFQ) issued by the Department of Interior for classroom renovation services at the Ohmsett facility.
The Government seeks quotations for complete classroom modernization including procurement and installation of collaborative training tables, modular seating, six retractable ceiling-mounted power reels, perimeter charging stations, and electrical infrastructure. The classroom must accommodate 50 people comfortably with the ability for a single person to reconfigure the room layout in under 15 minutes. Installation must preserve existing flooring with zero to minimal impact, utilize low-profile ceiling reels to maintain line-of-sight to presentation areas, and position all equipment to avoid obstructing views. The project consists of five key milestones: preinstallation site verification and Government approval of proposed furniture configuration; procurement of materials; electrical and wall mounting installation; ceiling reel and furniture installation; and final punch list inspection with functional testing. All milestone completion dates are to be quoted by the vendor. Questions must be submitted by December 1, 2026 at 9:00 AM EST to william.rilee@ios.doi.gov. Quotations must be received electronically no later than December 7, 2026 at 11:00 AM EST. The solicitation incorporates FAR Part 12 provisions by reference, including representations regarding tax matters, delinquent liability, inverted domestic corporations, System for Award Management registration, and Buy American Certificate requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B09_-_Blue_White_Floor_Plan_excerpt_0001.pdf | ||
| B09_-_Q_A_Attachment_0001.pdf | ||
| Sol_140EE127Q0003_Amd_0001.pdf | ||
| B08_-_RFQ.pdf | ||
| B08_-_Video_2.mov | MOV file | |
| B08_-_R24_Floor_Plan-Ansi_C.pdf | ||
| B08_-_Video_1.mov | MOV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 140EE127Q0003/0001 – Ohmsett Classroom Replacement Page 4 of 15
Government and positioned to avoid obstructing views of presentation areas. Reels shall be low-profile to ensure they minimize line-of-sight interruptions for students and instructors looking toward primary presentation zones.
Part B: Facility & Material Constraints
Flooring Preservation: No flooring or tilework will be replaced. All installation methodologies, furniture selections (caster types), and electrical routing must have a zero to minimal impact footprint on the existing floor surfaces.
3. Timeline & Key Milestones
Milestone Description Estimated Completion
1. Preinstallation Site Verification and Government Approval
Verify field dimensions and existing conditions; submit the proposed furniture configuration and installation locations for Government approval before ordering materials or beginning installation. This will focus on the final furniture footprint, precise perimeter outlet placement, and ceiling reel mapping to ensure line-of-sight compliance.
To be quoted by vendor
2. Procurement Source collaborative training tables, seating, power reels, and electrical hardware.
To be quoted by vendor
3. Electrical & Wall Mounting
Install perimeter charging stations and drop ceiling conduit paths.
To be quoted by vendor
4. Ceiling Reel & Furniture Install
Mount the 6 retractable reels; assemble and stage modular classroom. and break area furniture.
To be quoted by vendor
5. Final Punch List & Sign-off
Government inspection, functional testing of installed receptacles and charging ports, correction of identified deficiencies, removal of installation debris, and final Government acceptance.
To be quoted by vendor
4. Deliverables & Acceptance Criteria
Capacity & Flexibility: Classroom comfortably seats 50 people using the new collaborative tables, with the ability for a single person to reconfigure the room setup in under 15 minutes.
RFQ 140EE127Q0003/0001 – Ohmsett Classroom Replacement Page 13 of 15
Questions regarding this RFQ shall be submitted via email to the Contracting Officer at william._rilee@ios.doi.gov no later than the December 1, 2026 at 9AM EST. The Government reserves the right not to respond to questions received after the established cutoff date.
4.3 SUBMISSION SCHEDULE
Quotations shall be submitted electronically via email to the Contract Specialist identified in this solicitation. Quotations must be received no later than the date and time specified in SAM.gov (December 7@11AM EST).
4.4 FAR 52.252-1 – SOLICITATION PROVISIONS INCORPORATED BY
REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The Quoter is cautioned that the listed provisions may include blocks that must be completed by the Quoter and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the Quoter may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address: https://www.acquisition.gov/far/.
The FAR Part 12 provisions are in accordance with the Revolutionary FAR Overhaul (RFO) Class Deviation for Part 12 and can be found: FAR Overhaul - Part 12 | Acquisition.GOV
Provision Title Date
52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-- Representation
JAN 2017
52.204-7 System for Award Management NOV 2025
52.209-2 Prohibition on Contracting with Inverted Domestic Corporations- Representation
NOV 2025
52.209-5 Certification Regarding Responsibility Matters NOV 2025
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law
NOV 2025
52.209-12 Certification Regarding Tax Matters OCT 2025
52.212-1 Instructions to Quoters-Commercial Items NOV 2025
(DEV)
52.225-2 Buy American Certificate NOV 2020
52.240-90 Security Prohibitions and Exclusions – Representations and Certifications
MAR 2026
(DEV)
File details come from the government source that posted it. Updated .