Sol_140E0125R0003_Amd_0001.pdf
PDF 89 KB Posted
- Attached to
- TEST AND EVALUATION OF THE BSEE BURNER
- Solicitation number
- 140E0125R0003
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for Solicitation 140E0125R0003 issued by the Bureau of Safety and Environmental Enforcement (BSEE) on 04/07/2025. The amendment provides responses to three vendor-submitted questions related to a Test and Evaluation of the BSEE Burner contract opportunity.
Key details include: (1) The government will not provide ancillary equipment with the BSEE Burner prototype, which is designed with standard fittings for readily available equipment; (2) There is no preferred format or template for the cost proposal; and (3) A two-part cost submittal is acceptable, consisting of a PDF file summarizing cost elements and a CSV/XLS spreadsheet with detailed cost elements. The government will provide the BSEE Burner prototype (frame, shroud, flow blurring atomizer) and will collaborate with the contractor to acquire or build additional flow blurring atomizers through a patent license.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140E0125R0003_Amd_0002.pdf | ||
| Sol_140E0125R0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140E0125R0003 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
E10
Sterling VA 20166-9216 45600 Woodland Road, VAE-AMD BSEE-Sterling ACQ Ops Branch
04/07/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/07/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide responses to vendor submitted questions as follows:
Question 1: In regards to L.9.2 (i), Shipment of Equipment to Contractor Facility: The
Contractor shall price out the cost of shipping the BSEE Burner from Ohmsett to the
Contractor's facility, for the purposes of evaluation and modification [of] the system.
Will the government be providing any other ancillary equipment to ship - hoses, valves, oil bladders, etc. - in addition to the prototype BSEE burner and its frame, nozzle, and cowling/stack?
Response: The government will not be providing ancillary equipment, as the system is
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
William Rilee
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140E0125R0003/0001 designed with standard fittings for readily available equipment. The government will provide the BSEE Burner prototype (frame, shroud, flow blurring atomizer) and will work with the contractor to acquire or build additional flow blurring atomizers as needed through the patent license.
Question 2: In regards to L.9.2, Business/Cost
Proposal. Does the government have a preferred format or spreadsheet template for the cost volume of this proposal?
Response: No.
Question 3: In regards to L.9.2, Business/Cost
Proposal. In the absence of a provided template, is a two-part cost submittal - (a) a PDF file summarizing the cost elements, comments, B3/B4 tables, and signed forms, and (b) a
CSV/XLS/spreadsheet file of detailed cost elements for all criteria as stated in L.9.2 -considered sufficient for the cost proposal?
Response: Yes.
End of questions and responses.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .