This is a Request for Quote (RFQ) and Amendment 002 for asphalt repair work at Carl Sandburg Home National Historic Site in Flat Rock, North Carolina. The solicitation is a total small business set-aside under NAICS Code 238990 (All Other Specialty Trade Contractors) with a $19 million business size standard, issued under Revolutionary FAR Overhaul Part 12 for commercial products and services.
The work requires furnishing all labor, materials, equipment, tools, supervision, and incidental services to complete asphalt repair at the main entrance drive (1800 Little River Road, Flat Rock, NC 28731). Scope includes approximately 1,300 square feet of deteriorated asphalt removal (anticipated 5-inch depth), removal of approximately 100 square feet of 4-inch concrete base, placement of up to 2 inches of compacted aggregate base material where needed, installation of a 3-inch asphalt concrete base course using 25mm nominal maximum aggregate per FHWA Federal Lands Highway FP-24 Division 400, installation of a 2-inch asphalt concrete surface course using 9.5mm nominal maximum aggregate, approximately 60 linear feet of saw-cutting, traffic control, and site cleanup. All work must comply with NCDOT requirements, applicable Federal Lands Highway standards, and Davis-Bacon Act wage determination NC20260087, Modification 1 (dated May 18, 2026). The contract is firm fixed price for 1 job, with completion required within 120 calendar days from Notice to Proceed. Quotes are due October 28, 2026, at 10:00 a.m. Eastern Daylight Time, submitted to Contracting Officer Mandy Ashmore and Contract Specialist Kelly Ozah via email. Award will be made on a lowest price technically acceptable (LPTA) basis to the responsible vendor whose conforming quote is most advantageous to the Government. A mandatory site visit is scheduled for October 21, 2026, at 10:00 a.m. at Carl Sandburg Home Hikers' Parking Lot (1925 Little River Road). Questions are due by October 23, 2026, at 2:00 p.m. EDT. No bid bonds, performance bonds, or payment bonds are required. Invoices must be submitted electronically through the Invoice Processing Platform (IPP), and a Release of Claims is required prior to final payment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140D0427Q0920_Amd_0003.pdf | ||
| Sol_140D0427Q0920_Amd_0001.pdf | ||
| Sol_140D0427Q0920.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Mandy Ashmore
See continuation page
Interior Business Center, AQD Division 2 /Branch 3 381 Elden St Suite 2000A Herndon VA 20170
D23
140D0427Q0920
10/26/2026
10/09/2026
1 31
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140D0427Q0920/0002
The purpose of Amendment 002 is to:
1. Revise the Wage Determination (WD) to reflect applicability of Davis-Bacon Act WD #
NC20260087, Modification 1, Dated May 18, 2026.
2. Revise the time zone for the questions and quotes deadline to reflect Eastern Daylight
Time (EDT).
3. Revise the Period of Performance (PoP) to reflect that work shall be completed within 120 days from Government's issuance of a Notice to
Proceed (NTP).
4. Provide Government responses to additional vendor questions received in response to the solicitation.
All changes highlighted in yellow.
Solicitation No.
Document Title Asphalt Repair at Carl Sandburg Historic Site Page 3 of 32
REF: 140D0427Q0920
(i) This is a Request for Quote (RFQ) for construction work located at the Carl Sandburg Home National Historic Site, Main Entrance, located at 1800 Little River Road, Flat Rock, NC 28731 (GPS Coordinates: 35.27406785621091, -82.44663211824084).
(ii) This requirement is a total small business set-aside under North American Industry Classification System (NAICS) Code 238990 – All Other Specialty Trade Contractors with a business size standard of $19 million. Federal Supply Code (FSC) Z2LB – Repair or Alteration of Highways, Roads, Streets, Bridges, and Railways. This solicitation is issued under Revolutionary FAR Overhaul (RFO) Part 12, Acquisition of Commercial Products and Commercial Services.
(iii) This is a combined synopsis/solicitation. This announcement constitutes the only solicitation;
quotes are being requested and a separate written solicitation will not be issued. The Government will award a firm fixed price contract from this solicitation to the responsible vendor whose quote, conforming to the solicitation, will be most advantageous to the Government, price and other factors considered. The Government intends to evaluate all timely quotes received from eligible vendors on a lowest price technically acceptable (LPTA) basis. The Government intends to evaluate quotations and award a contract without discussions with quoters. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
Document Title Asphalt Repair at Carl Sandburg Historic Site Page 4 of 32
Section B - Supplies or Services and Prices/Costs
The following is the associated Contract Line Item Number (CLIN):
CLIN Description TYPE Quantity Amount
0001 Asphalt Repair
FFP
(Firm Fixed Price)
1 x job $
Total $
Sub description: The contractor shall furnish all required elements, including design, labor, materials, equipment, tools, supervision, and any other items necessary to complete the construction work at Carl Sandburg Home National Historic Site, Main Entrance, located at 1800 Little River Road, Flat Rock, NC 28731 (GPS Coordinates: 35.27406785621091, -82.44663211824084). Work shall be in strict compliance with the Statement of Work, all specifications, drawings/diagrams, terms, conditions, clauses, and all other provisions contained herein.
The contract price includes all applicable Federal, State, and local taxes and duties. It is the Contractor's responsibility to include in its price quote any other costs that may be required if the contractor intends to recover such costs under the contract. The Government will not modify the contract after award to compensate the contractor for any other specific costs that may not have been included in the award price.
Asphalt Repair at Carl Sandburg Historic Site Page 5 of 32
Section C – Description / Specifications / Statement of Work
STATEMENT OF WORK (SOW)
NATIONAL PARK SERVICE
HISTORIC PRESERVATION TRAINING CENTER
1. BACKGROUND
This procurement supports the repair and replacement of deteriorated asphalt at the Historic Main Entrance Drive at Carl Sandburg Home National Historic Site, located at 1800 Little River Road, Flat Rock, North Carolina.
The existing asphalt at the main entrance has deteriorated and includes a sunken area that affects the roadway profile and drainage. The repair will restore the asphalt surface and provide a properly graded entrance that allows water to drain toward the existing roadway. The revised repair limits are intended to reduce the work footprint and maintain separation from the adjacent historic wall and columns.
2. STATEMENT OF WORK
Independently, and not as an agent of the Government, the Contractor shall furnish all labor, materials, equipment, transportation, traffic control, and incidental services necessary to complete the asphalt repair in accordance with this Statement of Work and applicable contract requirements.
2.1 Asphalt/Concrete Removal
2.1.1 Prior to demolition, the Contractor shall saw-cut approximately 60 linear feet of existing asphalt at the designated limits of removal.
2.1.2 Saw cuts shall be straight and clean to provide suitable edges for tying the new asphalt into the existing pavement.
2.1.3 The Contractor shall remove and properly dispose of approximately 1,300 square feet of deteriorated asphalt within the designated repair area. The Contractor shall also remove approximately 100 square feet of 4-inch non-reinforced concrete base. Existing asphalt removal is anticipated to be approximately 5 inches in depth.
2.1.4 The Contractor shall take reasonable measures to prevent damage to adjacent pavement, structures, drainage features, historic fabric, landscaping, and other Government property.
2.2 Surface and Base Preparation
2.2.1 The Contractor shall prepare the exposed surface to receive new asphalt.
2.2.2 Existing base material shall remain in place where stable and suitable, unless otherwise directed by the COR.
2.2.3 Where necessary to establish the required finished grade and drainage, the Contractor shall furnish, place, and compact approximately 2 inches of aggregate base material over the prepared existing base.
Asphalt Repair at Carl Sandburg Historic Site Page 6 of 32
2.2.4 If unstable or unsuitable conditions are encountered after removal of the existing asphalt, the Contractor shall notify the COR before performing additional excavation or base replacement. The Contractor shall not perform additional excavation or base replacement outside the stated quantities without direction from the Government.
2.2.5 The prepared surface and any added aggregate base shall be firm, clean, properly compacted, and suitable for placement of new asphalt.
2.3 Asphalt Installation
2.3.1 The Contractor shall install a minimum 3-inch compacted Asphalt Concrete Base Course using a 25 mm (1-inch) nominal maximum aggregate size asphalt concrete mix in accordance with FHWA Federal Lands Highway FP-24, Division 400.
2.3.2 The Contractor shall install a minimum 2-inch compacted Asphalt Concrete Surface Course (top course) using a 9.5 mm (3/8-inch) nominal maximum aggregate size asphalt concrete mix in accordance with FHWA Federal Lands Highway FP-24, Division 400.
2.3.3 Asphalt concrete materials and construction shall conform to the applicable requirements of FP-24 Sections 401 and 403. The Contractor shall apply tack coat between asphalt courses and at existing pavement interfaces as required and shall compact each course in accordance with FP-24.
2.3.4 The finished pavement shall be smooth, firmly compacted, properly tied into the existing pavement, and graded to provide positive drainage without ponding.
2.4 Grade, Drainage, and Historic Resource Protection
2.4.1 The Contractor shall grade the finished asphalt to correct the existing sunken condition and provide positive drainage toward the existing roadway and existing swale.
2.4.2 The completed repair shall not create a low point or depression that allows water to pond.
2.4.3 The finished surface shall provide a smooth transition to the existing roadway.
2.4.4 The Contractor shall perform the work within the revised limits identified by the Government and shall not extend the repair toward or disturb the adjacent historic wall and columns without prior direction from the COR.
2.5 Traffic Control and Site Cleanup
2.5.1 The Contractor shall provide appropriate traffic-control devices and measures necessary to safely perform the work and comply with applicable NCDOT requirements and the NCDOT right-of-way encroachment permit.
2.5.2 The Contractor shall maintain a safe and orderly work area during construction.
2.5.3 The Contractor shall coordinate temporary closure or restricted access to the entrance with the
COR.
Asphalt Repair at Carl Sandburg Historic Site Page 7 of 32
2.5.4 Upon completion, the Contractor shall remove construction debris, excess materials, equipment, and temporary traffic-control devices from the work area.
2.5.5 The Contractor shall repair, at no additional cost to the Government, damage to Government property caused by the Contractor's operations.
3. APPLICABLE STANDARDS AND NCDOT REQUIREMENTS
The work shall be performed in accordance with applicable Federal and National Park Service requirements and generally accepted commercial asphalt paving practices. As applicable to the work, the Contractor shall comply with:
3.1 Federal Lands Highway FP-24, including applicable requirements for asphalt concrete pavement and tack coat.
3.2 Applicable NCDOT roadway standards for asphalt pavement and temporary traffic control.
3.3 The NCDOT right-of-way encroachment permit and applicable conditions and requirements of the permit that pertain to the Contractor's work. The Government will obtain the required NCDOT right-of-way encroachment permit. The Contractor shall comply with applicable requirements and conditions of the permit and shall coordinate with the COR to facilitate required NCDOT inspections.
3.4 Applicable Federal, State, and local safety requirements.
3.5 The Government will provide the Contractor with the applicable NCDOT right-of-way encroachment permit and identified permit conditions affecting the work when available.
3.6 The Contractor shall provide access to the work area for NCDOT representatives conducting inspections required under the right-of-way encroachment permit. The Contractor shall coordinate the timing of such inspections with the COR when the inspections affect the Contractor's work.
3.7 The Contractor shall correct deficiencies identified through NCDOT inspection when such deficiencies are attributable to the Contractor's work, including the Contractor's means, methods, materials, or workmanship. Corrections required as a result of conditions outside the Contractor's control or changes directed by the Government shall be addressed by the Government as appropriate.
3.8 All work shall comply with applicable Federal laws, regulations, Federal Acquisition Regulation (FAR) requirements, Federal Lands Highway FP-24 requirements, NPS requirements, and applicable State and local requirements. Nothing in this Statement of Work is intended to waive, supersede, or modify any applicable Federal law, regulation, contract requirement, or permit condition.
3.9 If the Contractor identifies an apparent conflict between this Statement of Work and an applicable law, regulation, contract requirement, standard, or permit condition, the Contractor shall promptly notify the COR and shall not proceed based on its own interpretation of the conflict when doing so could affect compliance with an applicable requirement. The Contracting Officer will provide direction as appropriate.
4. TIME FOR COMPLETION
Asphalt Repair at Carl Sandburg Historic Site Page 8 of 32
4.1 The Contractor shall complete all work, including saw-cutting, asphalt removal, surface preparation, aggregate base placement where required, paving, compaction, traffic control, and cleanup, within 120 calendar days after receipt of the Government's Notice to Proceed.
4.2 The Contractor shall coordinate the work schedule with the COR prior to beginning work.
4.3 The Government will provide the Contractor with the applicable NCDOT permit information necessary for the Contractor to comply with applicable permit requirements.
5. SITE LOCATION
Carl Sandburg Home National Historic Site Main Entrance 1800 Little River Road Flat Rock, North Carolina GPS Coordinates: 35.27406785621091, -82.44663211824084
6. INSPECTION AND ACCEPTANCE
6.1 The Government reserves the right to inspect the work during construction and upon completion.
6.2 The Contractor shall coordinate with the COR to accommodate NCDOT inspections required under the applicable right-of-way encroachment permit.
6.3 NCDOT inspections are separate from Government inspection and acceptance of the work and do not relieve the Contractor of responsibility for complying with this Statement of Work, applicable NCDOT permit requirements, or applicable standards.
6.4 The completed asphalt shall be smooth, properly compacted, free of significant defects, and properly graded to provide drainage.
6.5 Work that does not meet the requirements of this Statement of Work may be rejected by the Government. The Contractor shall correct rejected work at no additional cost to the Government when the deficiency is attributable to the Contractor's work, including its materials, workmanship, means, or methods.
7. CONTRACTING OFFICER'S REPRESENTATIVE
Jeff Dennison Supervisory Exhibits Specialist Historic Preservation Training Center National Park Service Email: jeffrey_dennison@nps.gov Phone: (240) 315-6592
8. ESTIMATED QUANTITIES
8.1 New asphalt placement: approximately 1,400 square feet at 5 inches total compacted thickness, consisting of a 3-inch Asphalt Concrete Base Course and a 2-inch Asphalt Concrete Surface Course.
Asphalt Repair at Carl Sandburg Historic Site Page 9 of 32
8.2 Existing asphalt removal: approximately 1,300 square feet, with an anticipated removal depth of approximately 5 inches.
8.3 Existing 4-inch non-reinforced concrete base removal: approximately 100 square feet.
8.4 Aggregate base: approximately 2 inches compacted thickness where required to establish finished grade, subject to field conditions and Government direction.
8.5 Saw-cut existing asphalt at road and entrance gate prior to demolition: approximately 60 linear feet.
Final limits of work will be identified by the Government in the field. The Contractor shall coordinate the limits with the COR before beginning work. The revised work limits are intended to keep the repair away from the adjacent historic wall and columns.
Attachments:
- Attachment A: Photos of worksite location and schematics
- Attachment B: Photo of site visit location
Section D - Packaging and Marking
All required submittals shall be delivered to the Primary Contracting Officer’s Representative (COR) listed in Section G herein. All required submittals shall contain the following markings, if applicable:
1. Name and address of the contractor
2. Contract number
3. Description of item submitted
Asphalt Repair at Carl Sandburg Historic Site Page 10 of 32
Section E - Inspection and Acceptance
CLIN 0001
INSPECT AT: Destination
INSPECT BY: Government
ACCEPT AT: Destination
ACCEPT BY: Government
CLAUSES INCORPORATED BY REFERENCE
52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) 52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements (AUG 1996)
CLAUSES INCORPORATED BY FULL TEXT
Pursuant to FAR 52.246-12, Inspection of Construction (AUG 1996), all work described in Section C of this solicitation, and its attachments, to be delivered under this contract are subject to final inspection and acceptance by an authorized representative of the government. The authorized representative of the government is the Primary COR listed in Section G of this contract.
Asphalt Repair at Carl Sandburg Historic Site Page 11 of 32
Section F - Deliveries or Performance
Place of Delivery: The construction repair will be completed at the location specified in the Statement of Work located in Flat Rock, NC 28731.
Customer Point of Contact(s) for construction:
Primary COR: TBD
Delivery Date: All construction work, including cleanup, shall be completed 120 days after Notice to Proceed (NTP).
CLAUSES INCORPORATED BY REFERENCE
52.211-13 Time Extensions (SEPT 2000) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.242-14 Suspension of Work (APR 1984)
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract immediately after contract award, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 days after Notice to Proceed (NTP).
(End of Clause)
Asphalt Repair at Carl Sandburg Historic Site Page 12 of 32
Section G - Contract Administration Data
Contract Administration Data. The Contracting Officer is responsible for the administration of this contract and, alone, is authorized to take actions on behalf of the Government that result in changes in the terms of the contract.
Contracting Officer: Mandy Ashmore Email: Mandy_ashmore@ibc.doi.gov Phone: (202) 599-8571
Other Relevant Points of Contract:
Contract Specialist: Kelly Ozah Email: Kelly_ozah@ibc.doi.gov Phone: (804) 829-5627
Primary COR: TBD
CLAUSES INCORPORATED BY FULL TEXT
DIAR 1432.903 RESPONSIBILITIES
The CO may modify the timing of payment specified in paragraph (a)(1)(i) and (ii) of the clause FAR 52.232-26, Prompt Payment for Fixed-Price Architect-Engineer Contracts, and/or paragraph (a)(1)(i) and
(ii) of the clause at FAR 52.232-27, Prompt Payment for Construction Contracts, as appropriate, to provide for a period shorter than 30 days (but not less than 7 days) for making contract financing payments based on geographical site location, workload, contractor ability to submit a proper request for payment, or other factors. When considering a modification to these FAR standard(s), the CO should alert the finance and program officials involved in the payment process to ensure that such shorter contract payment terms to be specified in the solicitation and resulting contract will be met. A CO determination justifying a shorter payment period must be documented in writing and incorporated into the solicitation/contract file.
Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (FEB 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
Invoices must include, as a minimum, the following information:
1. Contractor Name, Address, Contact Information
2. Invoice Date and Invoice Number mailto:Mandy_ashmore@ibc.doi.gov mailto:Kelly_ozah@ibc.doi.gov https://www.ipp.gov/
Asphalt Repair at Carl Sandburg Historic Site Page 13 of 32
3. Contract Number
4. CLIN/Item number of deliverable
5. Description of Deliverable, Work, or Services Performed
6. Quantity and Firm Fixed Price of Deliverable
7. Date Deliverable was Provided to the Government for Inspection and Accepted
8. Period of Performance/Milestones Dates Applicable
The contractor is responsible for ensuring invoices submitted are accurate and complete.
Additional supporting documentation MAY BE REQUESTED at the discretion of the COR or CO.
The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone
(866) 973-3131.
A Release of Claims is required IAW 1452.204-70 Release of Claims, after completion of work and prior to final payment.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause) mailto:IPPCustomerSupport@fiscal.treasury.gov
Asphalt Repair at Carl Sandburg Historic Site Page 14 of 32
Section H – Special Contract Requirements
Compliance with OSHA-Govt owned Facilities/Equipment
"Compliance with Occupational Safety and Health Act -- Government-Owned
Performance of work hereunder shall comply with the provisions of the Occupational Health and Safety Act of 1970, as amended (OSHA). If, at any time during the performance of this contract, the Government- furnished facilities and/or equipment do not conform to OSHA standards, the contractor must so notify the Contracting Officer, in writing, including a recommendation of the corrective action needed.
Accident Reporting
Accident Reporting - If an accident occurs on Government-controlled facilities, a report must be provided to the Contracting Officer's Representative and the Contracting Officer within 48 hours. An accident is defined as an event which causes injury, illness, or loss or damage to Government-owned or private property. The contractor will cooperate with any ensuing Government accident investigation.
List of subcontractors (Construction)
For purposes of monitoring compliance with the insurance and payroll reporting requirements of this contract, the contractor shall furnish a listing of all subcontractors to the Contracting Officer within 5 business days after contract award.
Section I - Contract Clauses
The contractor must comply with the following FAR, DIAR, and local clauses that apply to this acquisition. This solicitation document and incorporated clauses are those in effect through FAC 2026-01, Effective 03/13/2026.
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisiton.gov/
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management (NOV 2024) 52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.212-4 Terms and Conditions—Commercial Products and Commercial Services (May 2026) 52.215-8 Order of Precedence--Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-14 Limitations on Subcontracting (OCT 2022) 52.219-28 Postaward Small Business Program Rerepresentation (JAN 2025) 52.222-6 Construction Wage Rate Requirements (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) https://www.acquisiton.gov/
Asphalt Repair at Carl Sandburg Historic Site Page 15 of 32
52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination-Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-90 Addressing DEI Discrimination by Federal Contractors (DEVIATION DATE) 52.225-9 Buy American-Construction Materials (OCT 2022) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024) 52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.229-3 Federal, State and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-16 Progress Payments (NOV 2021) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.246-21 Warranty of Construction (MAR 1994) – Alternate I (APR 1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984)
DIAR CLAUSES INCORPORATED BY REFRENCE
1452.201-70 Authorities and Delegations (SEP 2011) 1452.203-70 Restrictions and Endorsements (JUL 1996) 1452.204-70 Release of Claims (JUL 1996)
CLAUSES INCORPORATED BY FULL TEXT
52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)
Asphalt Repair at Carl Sandburg Historic Site Page 16 of 32
(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if– (A)The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material.
The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the
Asphalt Repair at Carl Sandburg Historic Site Page 17 of 32 construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together.
Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
"None"
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that- (i)The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(1)The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2)For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.
(3)The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components.
(1)The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of
Asphalt Repair at Carl Sandburg Historic Site Page 18 of 32 such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2)For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.
(3)The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction Material Description
Unit of Measure Quantity Price (dollars)*
Item1:
Asphalt Repair at Carl Sandburg Historic Site Page 19 of 32
Foreign construction material
Domestic construction
Item2:
Foreign construction
Domestic construction
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.]
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
DIAR CLAUSES INCORPORATED BY FULL TEXT
DAVIS BACON ACT (DBA) WAGE DETERMINATION (WD)
Construction Wage Determination
(i) Reference FAR 52.222-6 Construction Wage Determination General Decision Number NC20260087, Modification 1, Dated May 18, 2026 applies to this solicitation and/or purchase order and/or contract.
(ii) Wage Determination may be downloaded from the following websites: SAM.gov Wage Determinations Construction (DBA) https://sam.gov/search/?index=dbra&page=1&pageSize=25&sort=-modifiedDate&sfm%5BsimpleSearch%5D%5BkeywordRadio%5D=ALL&sfm%5BsimpleSearch%5D%5BkeywordEditorTextarea%5D=&sfm%5Bstatus%5D%5Bis_active%5D=true https://sam.gov/search/?index=dbra&page=1&pageSize=25&sort=-modifiedDate&sfm%5BsimpleSearch%5D%5BkeywordRadio%5D=ALL&sfm%5BsimpleSearch%5D%5BkeywordEditorTextarea%5D=&sfm%5Bstatus%5D%5Bis_active%5D=true
Asphalt Repair at Carl Sandburg Historic Site Page 20 of 32
Section J - List of Documents, Exhibits, and Other Attachments
None
Section K - Representations, Certifications, and Other Statements of Bidders
PROVISIONS INCORPORATED BY REFERENCE
52.236-28 Preparation of Proposals-Construction (OCT 1997)
Section L - Instructions, Conditions, and Notices to Bidders
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/
(End of Provision)
PROVISIONS INCORPORATED BY REFERENCE
52.201-1 Acquisition 360: Voluntary Survey (SEP 2023) 52.204-7 System for Award Management (NOV 2024) 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work (MAY 2014) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)
DIAR PROVISIONS INCORPORATED BY REFRENCE
1452.215-71 Use and Disclosure of Proposal Information – Department of the Interior (APR 1984)
PROVISIONS INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price (FFP) contract resulting from this solicitation.
52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS
(MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the https://www.acquisition.gov/
Asphalt Repair at Carl Sandburg Historic Site Page 21 of 32 clause of this solicitation entitled "Buy American-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and
(d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
DIAR 1452.233-2 – SERVICE OF PROTEST DEPARTMENT OF THE INTERIOR (JUL 1996)
(DEVIATION)
(a) Protests, as defined in section 31.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Mandy Ashmore, Contracting Officer Acquisition Services Directorate
Email: mandy_ashmore@ibc.doi.gov
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
Asphalt Repair at Carl Sandburg Historic Site Page 22 of 32
(c) A copy of the protest served on the Contracting Officer shall be simultaneously furnished by the protester to the Department of the Interior Assistant Solicitor, Acquisitions and Intellectual Property, 1849 C Street, NW, Room 6511, Washington, D.C. 20240.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) A contractor site visit is scheduled for October 21, 2026, at 10:00 a.m. Vendors attending the site-visit must send an email to mandy_ashmore@ibc.doi.gov and Kelly_ozah@ibc.doi.gov indicating their business, name of person(s), phone number and email address of the representative(s) attending the site-visit.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .