B08_SOL_Attachment_1_-_Performance_Work_Statement.docx
DOCX document 56 KB Posted
- Attached to
- DOI-NPS Snow Removal Services
- Solicitation number
- 140D0427Q0888
About this file
This is a Performance Work Statement (PWS) for supplemental highway snow plowing and de-icing services on National Park Service (NPS) National Capital Region (NCR) parkways. The contract is a non-personal services, Time-and-Materials (T&M) engagement providing snow removal on five designated parkways: Suitland Parkway, Baltimore-Washington Parkway, George Washington Memorial Parkway, Clara Barton Parkway, and Rock Creek and Potomac Parkway. Services are ordered by individual service calls as needed, with the base period running from contract award through May 1, 2027, followed by four one-year option periods through May 1, 2031, and an optional six-month extension. The contractor must furnish all personnel, equipment, supplies, tools, transportation, PPE, and supervision, while the government provides salt for de-icing at designated staging and storage sites.
The contract requires the contractor to provide twelve plow trucks (four each of Type 1 Tandem Axle, Type 2 Five-Ton, and Type 3 Class 5 trucks) capable of clearing traveled lanes, shoulders, and ramps, plus four brine trucks (two Type 4 for mainline pre-treatment and two Type 5 for ramps/interchanges). Plow trucks are paid at fully burdened hourly rates by equipment type and operator, while brine application is paid per gallon applied. Plowing services activate when the National Weather Service issues a Winter Storm Warning with forecasts of at least six inches of precipitation or precipitation lasting at least 24 hours; brine pre-treatment may activate at lower accumulation thresholds. The contractor must mobilize equipment to staging sites within two hours of service call notification and maintain continuous operations until released by the Contracting Officer Representative (COR). The contractor is required to submit a Quality Control Plan within 14 days of award, designate a primary and alternate Point of Contact available during regular business hours and continuously during activations, provide employee identification badges, maintain current driver's licenses for all operators, implement traffic control measures, comply with environmental regulations, and document all activities on signed Service Tickets. Performance will be monitored against specific metrics including 95 percent mobilization response compliance, continuous operations until release, safety compliance, equipment readiness, environmental protection, real-time communications, coordination with NPS operations, and property protection, with corrective action requests issued for nonconformances at four escalating severity levels.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_SOL_Attachment_4_-_Wage_Determination_Log.xlsx | XLSX spreadsheet | |
| B08_SOL_Attachment_6_-_MATOC_Snow_Road_Conditions.pdf | ||
| B08_SOL_Attachment_2_-_Price_Schedule.xlsx | XLSX spreadsheet | |
| Sol_140D0427Q0888.pdf | ||
| B08_SOL_Solicitation_11-20-2026_Full.pdf | ||
| B08_SOL_Attachment_5_-_Highway_Segment_Maps.pdf | ||
| B08_SOL_Attachment_7_-_Service_Ticket_Template.docx | DOCX document | |
| B08_SOL_Attachment_3_-_Deliverables.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Version 0.9; (20 NOV 2026)
NATIONAL CAPITAL REGION HIGHWAY SNOW PLOWING SERVICES
PART 1
GENERAL INFORMATION
1. General: This is a non-personal services, Time-and-Materials (T&M) contract to provide supplemental snow and ice removal services as defined in the Performance Work Statement (PWS) on designated National Park Service (NPS), National Capital Region (NCR) highways: Suitland Parkway, Baltimore-Washington Parkway (B-W Parkway), George Washington Memorial Parkway (GW Parkway), Clara Barton Parkway, and Rock Creek and Potomac Parkway. Services will be ordered by service call as needed. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, labor, equipment, supplies, transportation, tools, materials, personal protective equipment (PPE), supervision, and other items and non-personal services necessary to perform snow plowing and de-icing services as defined in the PWS except for those items specified as government furnished property and services. The Government will furnish salt for de-icing. The contractor shall perform to the standards in this contract.
1.2 Background: The NPS, NCR, requires supplemental snow removal services on the traveled lanes of traffic and ramps of the parkways identified in paragraph 1. Services include assisting NPS personnel and equipment in curb-to-curb snow removal (plowing) and de-icing (as needed) of all traveled lanes of traffic, shoulders, and ramps. These services are required to meet road conditions as set forth by the Metropolitan Area Transportation Operations Coordination (MATOC) Severe Weather Coordination Working Group (SWCWG), Attachment B.
1.3 Objectives: The objective of this contract is for the contractor to perform snow plowing and de-icing services in a manner that will maintain safe, passable, curb-to-curb roadway conditions for visitors, staff, and emergency services during winter events, in coordination with ongoing NPS operations. Only equipment types priced within the contract may be ordered.
1.4 Scope: The contractor shall perform highway snow plowing and de-icing services on the parkways, ramps, and interchanges of the designated park road segments listed in the table below and in accordance with Attachment A for maps with location specifics and access. Plowing services will be activated when National Weather Service (NWS) issues a Winter Storm Warning, and precipitation is at least 6 inches, or the precipitation is anticipated to last at least 24 hours. Brine pre-treatment may be activated at a lower forecasted accumulation (see paragraph 5.1.1). Plowing locations may differ depending on the storm and the Government plows and drivers working (see paragraph 5.1.4). The NPS may be conducting snow removal and de-icing operations simultaneously with the Contractor’s operations, and the NPS will decide on each storm where to direct contractor resources based on available NPS staffing and equipment. Generally plowing and de-icing operations will be limited to the Parkway locations listed above (paragraph 1) and in the table below, however in limited circumstances the contractor may be directed to perform work on other primary and secondary roads within the district. This shall not change pricing. All services are required to meet the full performance level of specified work, beginning at the contract start date. The Contractor shall perform work to the standards in the contract as well as all federal, state and local regulations. Note that any drawings or maps provided to the Contractor, either before or after the contract is awarded, are for reference purposes only and may not be to scale. Any distance, or other measurement provided, may be an approximation. It is the sole responsibility of the Contractor to determine or verify the actual site conditions and measurements. The designated segments and their staging and salt storage sites are listed below.
| Segment Name |
| Route Description |
| Staging and Salt Storage |
| Baltimore-Washington Parkway, North |
| Hwy 193 to Hwy 175 |
| 6565 Greenbelt Road, Greenbelt, MD 20770 |
| Baltimore-Washington Parkway, South |
| DC Line to Hwy 193 |
| 6565 Greenbelt Road, Greenbelt, MD 20770 |
| Suitland Parkway |
| DC Line to Pennsylvania Ave |
| 4300 Silver Hill Rd, Suitland, MD 20746 |
| George Washington Memorial Parkway, North |
| Airport Access Rd. to I-495N |
| 2700 George Washington Memorial Parkway, Arlington, VA 22202-4026 |
| George Washington Memorial Parkway, South |
| Airport Access Rd. to Mount Vernon Estate |
| 2700 George Washington Memorial Parkway, Arlington, VA 22202-4026 |
| Clara Barton Parkway |
| Chain Bridge to MacArthur Blvd. |
| 2700 George Washington Memorial Parkway, Arlington, VA 22202-4026 |
| Rock Creek and Potomac Parkway |
| Shoreham Dr to Independence Ave |
| 5000 Glover Rd NW, Washington, DC 20015 |
1.4.1 Pricing Basis: This is a Time-and-Materials contract. Each period of performance has one (1) Contract Line Item Number (CLIN) for Snow Services, priced as one (1) Job, with a sub-line under that CLIN for each service type (Types 1 through 5). All service calls (events) during the period are performed and invoiced under that CLIN. Each CLIN has a ceiling price, and the Contractor exceeds the ceiling price at its own risk. Plow trucks (Types 1, 2, and 3, paragraphs 5.2.1 through 5.2.3) shall be paid at a fully burdened hourly rate for each equipment type, including the operator and all other costs of performance. Brine application (Types 4 and 5, paragraphs 5.2.4 and 5.2.5) shall be paid at a fully burdened price per gallon of brine applied, including the equipment and operator; no hourly rate is paid for brine trucks. Only the hours worked from mobilization (arrival at the staging site) until the Contractor is released from the site may be included on the Service Ticket and invoice. Payment will be based on the equipment hours and gallons of brine documented on Service Tickets signed by the COR or Park POC.
1.4.2 Park Points of Contact: The primary Park Points of Contact (Park POCs) for each segment are:
| Segments |
| Name |
| Cell |
| B-W Parkway and Suitland Parkway |
| Jerome Bussey |
| 771-233-3980 |
| Jerome_bussey@nps.gov |
| GW Parkway and Clara Barton Parkway |
| Richard Gielski |
| 202-465-0904 |
| Richard_gielski@nps.gov |
| Rock Creek and Potomac Parkway |
| Michael Ransome |
| 202-409-9738 |
| Michael_Ransome@nps.gov |
1.5 Period of Performance: The base period is from the date of contract award through May 1, 2027. The four (4) option periods are: Option Period 1, May 2, 2027, through May 1, 2028; Option Period 2, May 2, 2028, through May 1, 2029; Option Period 3, May 2, 2029, through May 1, 2030; and Option Period 4, May 2, 2030, through May 1, 2031. The contract also includes an option to extend services of up to six (6) months under FAR 52.217-8, Option to Extend Services, to be exercised only if needed.
1.6 General Information
1.6.1 Quality Control: Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services to the Government (see FAR 52.212-4, Alternate I, paragraph (a), Inspection/Acceptance). The contractor shall implement a Quality Control (QC) Plan, submitted to the COR within 14 days of contract award, and provide event logs, equipment readiness, and communications in accordance with the Performance Requirements Summary (PRS), Technical Exhibit 1. The contractor shall maintain an inspection system commensurate with commercial practices to ensure the Contractor only tenders for acceptance those services that conform to the requirements of this contract.
1.6.2 Quality Assurance: The Contracting Officer Representative (COR) will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP) described in paragraphs 1.6.2.3 through 1.6.2.8 and the PRS at Technical Exhibit 1. The QASP defines how the COR will monitor Contractor performance for compliance with this PWS, each service call, and the PRS.
1.6.2.1 Non-conforming Services: Corrective Action Requests (CARs) (formerly Nonconformance Reports) are used for managing contractual nonconformances. Nonconformance occurs when a contractor fails to meet contract terms, conditions and/or specifications. The COR will notify the contractor each time an unacceptable observation has been recorded and ask the contractor to correct the problem or re-accomplish the service. Resolution of nonconformance discovered at the subcontractor level shall be addressed with the prime contractor. CARs are issued, overseen and closed IAW FAR 46.407, Nonconforming supplies or services. CARs shall include root cause, corrective steps, and follow-up.
1.6.2.1.1 Level I: A Level I CAR describes a deficiency on a product or service and is not a systemic breakdown of a process or system. It includes those nonconformances that are minor in nature and can be promptly corrected by the contractor, present no need for root cause analysis, no determination if other contract requirements are affected, present no need for further preventive action, and do not materially reduce the usability of the services or deliverables. While the Government must document the nonconformance and the contractor must correct the nonconformance, further actions and Government follow-up are not required, and no written response from the contractor is needed. Level I CARs are considered closed immediately upon issuance.
1.6.2.1.2 Level II: A Level II CAR describes deficiencies in a contractor’s processes or systems but are not significant deficiencies. Level II CARs shall require the contractor to correct the nonconformance, perform root cause, and develop and provide a Corrective Action Plan (CAP) acceptable to the government. Some examples of systems affected may be quality inspection/management systems, or issues such as:
1.6.2.1.2.1 Multiple deficiencies on products or services indicating a systemic issue throughout the process, or,
1.6.2.1.2.2 An escalation of repetitive Level I CARs for the same or similar nonconformance demonstrating the contractor is failing to institute effective corrective action and/or failing to implement effective quality and/or internal control(s).
1.6.2.1.3 Level III: A Level III CAR describes deficiencies in a contractor’s system that is affecting a contract or program’s ability to meet cost, schedule or performance requirements, or are:
1.6.2.1.3.1 A failure to respond to Level II CARs, or to remedy a recurring nonconformance.
1.6.2.1.3.2 The contractor shall be required to provide a CAP that is acceptable to the government.
NOTE: If not resolved satisfactorily, a Level III CAR may result in the initiation of available contractual remedies, such as reductions of payments, cost disallowances, or revocation of government assumption of risk of loss, etc.
1.6.2.1.4 Level IV: A Level IV CAR documents a critical nonconformance of such serious nature that is issued to the contractor’s business segment or corporate management for their attention to both the nonconforming condition and the company’s corrective action, or when a Level III CAR has been ineffective. A Level IV CAR will result in a mandatory review of available contractual remedies, such as cost disallowance, reduction or suspension of payments, revocation of government assumption of risk of loss, or suspension of all service acceptance activities. Contractual remedies will be implemented IAW applicable FAR clauses. Action to suspend service acceptance will be accomplished via a Level IV CAR. The contractor shall be required to provide a CAP that is acceptable to the government.
Overarching CAR Process Flow. The following outlines the normal process flow for the corrective action process.
NOTE: Steps in subparagraphs (f)-(j) below do not apply to Level I CARs as they are considered closed immediately upon issuance.
a. Identify a contract nonconformance.
b. Create a CAR.
c. Review the CAR.
d. Coordinate and approve the CAR.
e. Issue the CAR to the contractor.
f. Receive and review the contractor’s CAP.
g. Accept/reject the contractor’s CAP.
h. Oversee contractor corrective action using a risk-based approach.
i. Receive notification from the contractor that corrective action is accomplished.
j. Verify corrective action was accomplished satisfactorily.
k. Close the CAR.
1.6.2.2 The contractor will be notified of Government inspection results within 5 business days. The Contractor shall acknowledge receipt of the inspection results via email or letter within 2 business days. The contractor may be notified of inspection results verbally or via email. Verbal notifications of defective work will be confirmed in writing. When Government inspectors are unable to contact the contractor to notify the contractor of inspection results, acceptance or rejection of work will be made on the basis of the initial inspection.
1.6.2.3 Roles and Responsibilities:
1.6.2.3.1 Contracting Officer (CO): Authority for contractual decisions.
1.6.2.3.2 COR: Oversees surveillance; documents performance; recommends acceptance; coordinates with NPS operations.
1.6.2.3.3 Contractor: Implements a QC Plan and provides event logs, equipment readiness, and communications in accordance with the PRS.
1.6.2.4 Surveillance Methods:
1.6.2.4.1 100% inspection: Activation/response times; completion notices; service call compliance.
1.6.2.4.2 Random sampling: Plow quality checks (lane coverage, ramp/shoulder clearing) during events.
1.6.2.4.3 Periodic inspection: Operator driver’s licenses, PPE, equipment identification; traffic control setups.
1.6.2.4.4 Customer feedback: NPS operations staff inputs on coordination, safety, and restoration to MATOC Level 1.
1.6.2.5 Performance Indicators and Metrics:
1.6.2.5.1 Mobilization Response: Each piece of equipment arrives at the staging site within 2 hours of the service call (AQL 95% of operators or greater). Evidence: call logs, GPS/arrival timestamp, COR sign-in.
1.6.2.5.2 Start of Work: Plowing initiated at the direction of the COR or onsite designee. Evidence: COR direction and event logs.
1.6.2.5.3 Continuous Operations/Restoration: Maintain operations until released by COR; meet priority-based restoration windows. Evidence: segment condition checks, time-stamped observations.
1.6.2.5.4 Safety and Qualifications: Driver’s license verification, PPE, equipment restrictions, traffic control adequacy. Evidence: inspection checklists, photos.
1.6.2.5.5 Environmental Care: Directed application; protection of drainage/vegetation; no reportable releases. Evidence: material logs, site inspections.
1.6.2.5.6 Coordination and Communications: Real-time contact maintained; completion notices logged. Evidence: communications transcripts, email/SMS records.
1.6.2.5.7 Service Call Compliance: Scope and timing adherence documented. Evidence: Service Tickets, COR verification notes.
1.6.2.6 Data Collection and Documentation:
1.6.2.6.1 Event Log: Mobilization time; on-site times; start/stop plowing; material applications; transitions to MATOC Level 1 by segment.
1.6.2.6.2 Inspection Checklists: Safety (PPE/driver’s licenses/traffic control), equipment identification/readiness, environmental controls.
1.6.2.6.3 Corrective Action Requests (CARs): For nonconformances; include root cause, corrective steps, and follow-up.
1.6.2.7 Acceptance Criteria: Services meet PRS standards (AQL thresholds) and PWS requirements; deficiencies are corrected within agreed timelines; acceptance is recommended by the COR.
1.6.2.8 Schedule and Frequency:
1.6.2.8.1 Event-Based Surveillance: Conduct inspections during each activation; perform post-event review within 48 hours of the COR completion notice.
1.6.2.8.2 Monthly Summary (seasonal): Aggregate performance versus Acceptable Quality Levels (AQLs) and trends.
1.6.3 Performance Evaluation Meetings: The Contractor Point of Contact (POC) shall meet with the COR prior to start of the contract. However, meetings may be held whenever deficiencies are noted by the COR. A mutual effort shall be made to resolve all problems identified.
1.6.4 Federal Government Holidays: Services under this contract are event driven. When a service call is placed, work shall be performed on any day, including weekends and the following holidays or holidays observed in lieu thereof. The holidays below apply to the calculation of business days under this contract.
| New Year’s Day | 1st day of January | ||
| Martin Luther King Jr.'s Birthday | 3rd Monday of January | ||
| Presidents Day | 3rd Monday of February | ||
| Memorial Day | Last Monday of May | ||
| Juneteenth | 19th day of June | ||
| Independence Day | 4th day of July | ||
| Labor Day | 1st Monday of September | ||
| Columbus Day | 2nd Monday of October | ||
| Veterans Day | 11th day of November | ||
| Thanksgiving Day | 4th Thursday of November | ||
| Christmas Day | 25th day of December |
1.6.5 Lost and Found Property: It is the responsibility of the Contractor to ensure that all items of possible personal or monetary value found by the Contractor’s employees are turned in to the Contracting Officer Representative (COR) or Park POC.
1.6.6 Damages Caused by the Contractor: The Contractor shall be held accountable and liable to the Government for any damage to Government roadways, structures, equipment, or grounds caused by the Contractor or his employees. The Contractor shall instruct his employees to immediately inform the COR of any damages to property resulting from the performance of their duties. See paragraph 5.8.
1.6.7 Circumstances to Be Reported: The Contractor or the Contractor’s employees shall report any circumstances of needed repair of the roadway or unusual activity in an area which may affect the performance of the work, present unhealthy or hazardous conditions, or create any delays or interference with the work caused by the employees of the Government. Such report shall be made immediately upon discovery by the Contractor to the COR or Park POC.
1.6.8 Hazardous Materials: The Contractor shall provide an inventory listing of all hazardous materials used onsite. Safety Data Sheets (SDS) will be maintained and readily available for any chemicals or hazardous materials used onsite, including brine. It is the Contractor’s responsibility to properly train his personnel on the existence and safe use and storage of chemicals and hazardous materials.
1.6.9 Loss of Contractor Property: The Contractor shall be responsible for retaining supplies and equipment in a safe and secure manner. The Government will not be held liable for any loss of supplies or equipment owned by the Contractor; nor the loss of any personal property belonging to employees of the Contractor.
1.6.10 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office. The CO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the CO or COR will appraise the contractor of how the government views the contractor's performance and the contractor will notify the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.6.11 Contracting Officer Representative (COR): The COR will be identified by separate letter and in the Supplemental Information of the contract. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.12 Key Personnel: The following personnel are considered key personnel by the government: designated Point of Contact (POC) and an alternate POC. The Contractor shall provide a designated POC who shall be responsible for the competent performance of the work required under the specifications of this contract NLT 5 business days after contract award and as changes occur. The name and contact information of the POC and an alternate, who shall act for the contractor when the POC is absent, shall be designated in writing to the COR. The POC or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The POC or alternate shall be available between 7:30 a.m. to 4:00 p.m. Monday thru Friday except Federal holidays. During each activation, the POC or alternate shall be available on a continuous basis and maintain real-time contact with the COR or designee until released by the COR. The POC(s) and alternates shall be able to read, write, speak, and understand English.
1.6.12.1 The POC shall meet with COR to discuss immediate problems areas. The POC shall respond by phone or email to the COR within two (2) hours after notification of deficiencies and correct the deficiency(s) immediately upon notification from the Government POC. The Contractor shall provide the telephone number and email of the POC to the COR.
1.6.13 Identification of Contractor Employees and Vehicles: The Contractor (to include subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name, and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include subcontractors) employee shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. Contractor vehicles shall display clear identification visible to NPS staff while on site.
1.6.13.1 A listing of issued identification cards shall be furnished to the COR prior to the listed employees performing work under this contract and updated as needed to reflect Contractor and Subcontractor personnel changes.
1.6.13.2 All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.14 Supervision of Contractor Employees: The Government will not exercise any supervision or control over Contractor or subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or Subcontractor employees.
1.7 Activity Regulations for Contractor Access and Use of Premises:
1.7.1 Preserve all Government assets. Immediately report all security concerns to the COR.
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms:
2.1 Definitions: As used throughout this performance work statement, the following terms shall have the meaning set forth below:
2.1.1 Business Day. A Federal workday, Monday through Friday, excluding Federal holidays.
2.1.2 Contract Administrator. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.
2.1.3 Contractor. A supplier or vendor awarded a contract to provide specific supplies or services to the government. The term used in this contract refers to the prime.
2.1.4 Contracting Officer (CO). A person with the authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government. Note: The CO is the only individual who can legally bind the Government.
2.1.5 Contracting Officer's Representative (COR). An employee of the U.S. Government appointed by the CO to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. Note: This individual does NOT have authority to change the terms and conditions of the contract.
2.1.6 Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement (PWS).
2.1.7 Deliverable. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.1.8 Park Point of Contact (Park POC). An NPS employee identified in paragraph 1.4.2, or otherwise designated by the COR, who coordinates Contractor operations on assigned segments with concurrent NPS operations and provides operational direction during an event. A Park POC does not have the authority to change the terms and conditions of the contract or discuss contractor performance issues. The only individuals with the authority to discuss contractor performance issues are warranted Contracting Officers (CO) and Contracting Officer Representatives (COR) specifically delegated this authority by a warranted CO via an appointment letter.
2.1.9 Government-Furnished Property (GFP), Government-Furnished Equipment (GFE), or Government-Furnished Facility (GFF). Property or area in the possession of, or directly acquired by, the Government and subsequently made available to the Contractor.
2.1.10 Key Personnel. Contractor personnel that are the main point of contact.
2.1.11 Physical Security. Actions that prevent the loss or damage of Government property.
2.1.12 Quality Assurance. The government procedures to verify that services being performed by the Contractor are acceptable in accordance with established standards and requirements of this contract.
2.1.13 Quality Assurance Specialist. An official Government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Acts as technical advisor to the Contracting Officer in these areas.
2.1.14 Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.15 Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.16 Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privities of contract with the subcontractor.
2.1.17 Workday. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.18 Work Week. Monday through Friday, except for Federal holidays unless specified otherwise.
2.1.19 Activation. A winter weather event for which the COR places a service call, through release of the Contractor from the site.
2.1.20 Brine. Contractor-furnished liquid deicing solution used for pre-treatment and paid at the fully burdened price per gallon applied.
2.1.21 MATOC Level 1. The roadway condition level defined in the MATOC SWCWG Transportation System Status Levels, Attachment B.
2.1.22 Segment. A designated portion of a parkway identified in paragraph 1.4, including its traveled lanes, shoulders, and ramps.
2.1.23 Service Call. A request by the COR, by e-mail, for the Contractor to mobilize and perform snow plowing and de-icing services under this contract.
2.1.24 Staging and Salt Storage Site. A Government location identified in paragraph 1.4 where Contractor equipment is staged, and Government-furnished salt is loaded.
2.2. Acronyms:
| ACOR | Alternate Contracting Officer's Representative | |
| AQL | Acceptable Quality Level | |
| B-W | Baltimore-Washington (Parkway) | |
| CA | Corrective Action | |
| CAP | Corrective Action Plan | |
| CAR | Corrective Action Request | |
| CDL | Commercial Driver’s License | |
| CFR | Code of Federal Regulations | |
| CLIN | Contract Line Item Number | |
| COR | Contracting Officer Representative | |
| CPARS | Contractor Performance Assessment Reporting System | |
| CO | Contracting Officer | |
| FAR | Federal Acquisition Regulation | |
| GFE | Government Furnished Equipment | |
| GFF | Government Furnished Facilities | |
| GFP | Government Furnished Property | |
| GW | George Washington Memorial (Parkway) | |
| IAW | In accordance with | |
| MATOC | Metropolitan Area Transportation Operations Coordination | |
| NCR | National Capital Region | |
| NLT | No later than | |
| NPS | National Park Service | |
| NWS | National Weather Service | |
| OSHA | Occupational Safety and Health Act/Agency | |
| POC | Point of Contact | |
| PPE | Personal Protective Equipment | |
| PRS | Performance Requirements Summary | |
| PWS | Performance Work Statement | |
| QA | Quality Assurance | |
| QASP | Quality Assurance Surveillance Plan | |
| QC | Quality Control | |
| QCP | Quality Control Plan | |
| SDS | Safety Data Sheet | |
| SWCWG | Severe Weather Coordination Working Group | |
| TE | Technical Exhibit | |
| T&M | Time-and-Materials |
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. Government Furnished Property, Equipment, and Services: The Government will provide the following:
3.1 Salt: The NPS provides salt for de-icing at the designated staging and salt storage sites and loads it into Contractor equipment at the staging areas.
3.2 Staging and Salt Storage Sites: The Contractor will report to one or more of the staging and salt storage sites identified in paragraph 1.4.
3.3 Reference Documents: Maps of segments (Attachment A); staging and salt locations (paragraph 1.4); MATOC pavement condition criteria (Attachment B); COR and contact list (Attachment C); and Safety Plan template (Attachment D).
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Items: The Contractor shall furnish all personnel, materials, supplies, equipment, tools, labor, supervision, transportation, PPE, and services needed to meet the requirements of this PWS, except Government-furnished salt. The Contractor shall provide brine solution for its own application, paid at the fully burdened price per gallon applied (paragraph 1.4.1).
PART 5
SPECIFIC TASKS
5. Specific Tasks:
5.1 General: Snow plowing and de-icing will be ordered by service call for each activation. The determination of when to order services rests solely with the Government. Only equipment types priced within the contract may be ordered. The Contractor will be notified in writing, after contract award, who the COR and Park POCs are and shall not accept any orders from any unauthorized individuals. Plow trucks are paid hourly and brine application is paid per gallon (paragraph 1.4.1). Only the hours worked from mobilization (arrival at the staging site) until the Contractor is released from the site may be included on the Service Ticket and invoice. Contractor must get a signed service ticket from the COR or Park POC to submit with invoice with date and time services were provided.
5.1.1 Activation and Mobilization: Following the issuance by the National Weather Service (NWS) of a Winter Storm Warning that includes the forecast of at least 6 inches or precipitation lasting at least 24 hours for the designated parkway locations, the Contractor shall have snow clearing services available on a continuous basis for the designated parkway locations until such forecasted weather event has ended. The COR will call the Contractor, at most 24 hours before the forecasted storm, to inform them of the intent to mobilize contract crews. The COR will provide this notification as soon as possible within that 24-hour window. This call will include an estimated service call timeframe. The COR will then place the official service call by e-mail. Within 2 hours after the e-mail service call from the COR, the Contractor shall mobilize personnel and equipment to the designated salt storage locations in preparation for road snow plowing and de-icing operations and confirm with the COR or Park POC when mobilization is complete. E-mail service calls for brine pre-treatment will be placed 24 hours or more before the storm, may be triggered by a lower forecasted accumulation, and will follow the same procedures above.
5.1.2 Service Calls: The COR will place each service call with the Contractor by e-mail. Service calls are performed at the hourly and per gallon rates in the contract price schedule, under the CLIN for the current period of performance, and no separate written order will be issued for each service call. Service calls are limited to the equipment types priced and the ceiling price and funding on the contract. Each service call shall be documented on a Snow Service Ticket (Attachment E) in accordance with paragraph 5.10.
5.1.3 Start of Work: The Contractor shall begin de-icing and/or plowing when directed by the COR or onsite designee (designated Park POC), in coordination with NPS snow removal operations.
5.1.4 Continuous Operations and Monitoring: Plowing services will differ depending on the storm and the Government plows and drivers working. It is the expectation that Contractor plows will continually plow until the storm is over, as indicated by the Park POC. Plowing may include participating in a plow train or being directed to keep certain ramps or interchanges, or pull offs plowed. Following cessation of snowfall, the Contractor shall continue operations until released by the COR. Restoration priorities and any applicable completion time objectives will be provided by the COR at the time of the service call.
5.1.5 Coordination and Communications: The NPS may be conducting snow removal and de-icing operations simultaneously with the Contractor’s operations. The Contractor shall coordinate all snow removal and de-icing activities with NPS personnel conducting concurrent operations and avoid conflicts in lanes, shoulders, and ramps. The Contractor shall perform work in a manner that avoids conflicts with Government equipment, personnel, traffic control measures, and roadway operations. The Contractor shall promptly comply with operational direction provided by the CO, COR, or designated Park POC, and shall maintain real-time contact with the COR or designee during events.
5.2 Equipment Types and Mobilization Expectation: The Government anticipates that all twelve (12) plow trucks, four (4) each of Types 1, 2, and 3, will be needed for each mobilization. The Government will assign the trucks among the segments for each storm. For example, in one storm eight (8) trucks may be assigned to the GW Parkway and four (4) to the B-W Parkway, while in another storm all twelve (12) may be assigned to the Suitland, Clara Barton, and Rock Creek and Potomac Parkways. If fewer than twelve (12) trucks are needed for a storm, the COR will state the number in the service call. If fewer than twelve (12) trucks are awarded, the CO will modify this section of the PWS. The brine trucks (Types 4 and 5) are in addition to the twelve (12) plow trucks and are ordered separately for pre-treatment (see paragraph 5.1.1). The equipment types are described below.
NOTE: Tailgate spreaders that require operators to raise the bed are prohibited from use on parkways due to bridge height restrictions.
5.2.1 Type 1 Tandem Axle Plow Truck (Mainline Parkway): The Contractor shall provide four (4) Tandem Axle (10-Wheeler) municipal trucks with approximately 10 tons of de-icing capacity and a 10’x36” plow.
5.2.2 Type 2 Five-Ton Plow Truck (Mainline Parkway, Ramps and Interchanges): The Contractor shall provide four (4) Five-Ton plow trucks with plow and spreader and a 10’x36” plow.
5.2.3 Type 3 Class 5 Dump Truck (Ramps and Interchanges): The Contractor shall provide four (4) Class 5 (i.e. F550) dump trucks with a 10’x36” plow and a minimum 1.3-ton V-box drop-in spreader.
5.2.4 Type 4 Brine Truck (Mainline Pre-Treatment): The Contractor shall provide two (2) 5-ton brine trucks capable of holding at least 750 gallons. Brine application will be paid at the fully burdened per gallon rate (paragraph 1.4.1).
5.2.5 Type 5 Brine Truck (Ramps and Interchanges Pre-Treatment): The Contractor shall provide two (2) F550 brine trucks or equivalent capable of holding at least 500 gallons. Brine application will be paid at the fully burdened per gallon rate (paragraph 1.4.1).
5.3 Equipment General Standards and Restrictions: The Contractor shall provide properly sized, well-maintained equipment to clear snow and de-ice as required, capable of:
5.3.1 Clearing traveled lanes, shoulders, and ramps under varying snow and ice conditions.
5.3.2 Operating safely in low visibility and night conditions.
5.3.3 Contractor vehicles shall display clear identification visible to NPS staff.
5.4 Pre-Storm Site Review: Prior to each storm, the Contractor shall review assigned areas to identify:
5.4.1 Bridge/underpass height restrictions and abutment offsets. Tailgate salt spreaders that require raising the bed shall not be used on these highways due to bridge height and safety constraints.
5.4.2 Roadway geometry that requires adjusted plow patterns.
5.4.3 Hazards that could damage equipment or infrastructure.
5.5 De-icing and Materials:
5.5.1 The NPS provides salt at designated storage sites and loads it into Contractor equipment at staging areas.
5.5.2 The Contractor shall provide brine solution for its own application, paid at the fully burdened price per gallon applied (paragraph 1.4.1). Gallons applied shall be verified by tank readings taken before and after application and recorded on the Service Ticket.
5.5.3 When directed by the COR, de-icing materials shall be applied in accordance with Government instructions regarding application rates, locations, timing, and environmental protection requirements.
5.5.4 Use of sand, treated/untreated salt, or mixes must comply with local/state regulations and Government direction.
5.6 Operator Qualifications: All Contractor personnel operating motor vehicles used in performance of this contract shall have a valid state driver’s license rated for the type of equipment operated (e.g., a commercial driver’s license (CDL) where required) and shall operate all motor vehicles and machinery in accordance with the policies and procedures established by the Federal and State Departments of Transportation and the NPS. Contractor vehicles shall have an identification tag clearly visible while on site.
5.7 Safety and Personal Protective Equipment (PPE):
5.7.1 The Contractor shall implement traffic control suitable for active roadways during operations.
5.7.2 The Contractor shall take care not to damage existing infrastructure and to ensure safe roadway operating conditions during the performance of work.
5.7.3 The Contractor shall use appropriate PPE and follow a site-specific Safety Plan (see Attachment D).
5.8 Protection of Government Property and the Environment: The Contractor shall conduct operations in a manner that prevents damage to roadway infrastructure, including but not limited to curbs, shoulders, guardrails, signs, bridges, drainage structures, delineators, medians, other roadway appurtenances, vegetation and waterways. Any observed or suspected damage shall be reported immediately to the COR. Damage resulting from Contractor negligence shall require corrective action at the Contractor’s expense. The Contractor shall comply with applicable federal, state, and local environmental regulations.
5.9 Event Documentation: The Contractor shall maintain event documentation for each activation, including mobilization time, arrival time, plowing start and stop times, equipment utilized, material applications, roadway condition observations, communications with Government personnel, and completion notification. Event logs shall be provided to the COR within 24 hours of request.
5.10 Service Tickets: The contractor shall have a service ticket signed and dated by the COR or Park POC upon completion of each service call for each piece of equipment. Only the hours worked from mobilization (arrival at the staging site) until the Contractor is released from the site may be included on the Service Ticket, recorded for each truck and operator. Brine tank readings before and after application shall be recorded on the Service Ticket. A legible copy of the service ticket will be provided to the person signing the ticket. The Contractor shall enter into the appropriate invoicing system, or email to the COR, a consolidated Service Ticket that includes all pieces of equipment used for each service call within 2 business days. The contractor shall keep a legible copy of all Service Tickets for their records.
5.11 Invoices: Invoices shall be submitted in accordance with the terms and conditions of the Contract documents and shall include only the plow truck hours worked from mobilization (arrival at the staging site) until release from the site, and the gallons of brine applied, as documented on the signed Service Tickets. Invoiced amounts shall not exceed the ceiling price of the CLIN for the period of performance.
PART 6
APPLICABLE PUBLICATIONS
6. Applicable Publications: The Contractor shall comply with the following:
6.1 MATOC Severe Weather Coordination Working Group (SWCWG), Transportation System Status Levels (Attachment B).
6.2 Policies and procedures established by the Federal and State Departments of Transportation for the operation of motor vehicles and machinery.
6.3 Local and state regulations governing the use of sand, salt, and deicing materials.
6.4 NPS policies and procedures as provided by the COR.
TECHNICAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY (PRS)
| # |
| Requirement |
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Surveillance Method |
| Frequency |
| Consequence of Non-Performance |
| 1 |
| Mobilization response |
| Each piece of equipment arrives at staging within 2 hours after notification |
| 95% of Operators meet 2 hours or less; remainder 2.5 hours or less |
| 100% inspection (COR) |
| Each event |
| Corrective action; potential negative past performance |
| 2 |
| Start of work as directed |
| Plowing begins when directed by COR or onsite designee. |
| 95% compliance across segments |
| Random sampling and COR verification |
| Each event |
| Re-training; escalation plan required |
| 3 |
| Continuous operations and restoration |
| Maintain operations until released by the COR. Meet any restoration objectives provided by the COR at the time of the service call. |
| 95% compliance |
| Field inspection and event review |
| Each event |
| Plan adjustment; Corrective Action Request on repeated misses |
| 4 |
| Safety and qualifications |
| Appropriately licensed operators; PPE; site restrictions (no tailgate spreaders that require raising the bed) |
| 100% operators compliant; 0 critical safety violations |
| Periodic inspection |
| Each shift |
| Stop-work for critical safety issues; removal of noncompliant staff |
| 5 |
| Equipment readiness |
| Proper equipment; visible identification; pre-storm site review |
| 95% equipment available and properly identified |
| Periodic inspection |
| Each event |
| Corrective action; contingency equipment plan |
| 6 |
| Environmental protection |
| Directed application; protect drainage/vegetation; housekeeping |
| 95% compliance; no reportable releases |
| Random sampling |
| Each event |
| Corrective action; environmental incident reporting |
| 7 |
| Communications |
| Real-time contact; completion notice before leaving site |
| 100% completion notices; 95% real-time updates as requested |
| 100% inspection |
| Each event |
| Corrective action; potential downgrade in CPARS |
| 8 |
| De-icing operations |
| Apply Government-furnished salt only when directed and in accordance with COR instructions |
| 100% compliance |
| Material application logs and COR verification |
| Each event |
| Corrective action and retraining |
| 9 |
| Coordination with NPS operations |
| Coordinate activities with Government crews and comply with operational direction from authorized personnel |
| 95% compliance |
| COR observations and operational reports |
| Each event |
| Corrective action plan |
| 10 |
| Protection of Government property |
| Conduct operations without avoidable damage to roadway infrastructure and immediately report any damage |
| 95% compliance; 100% reporting compliance |
| Field inspections and incident reports |
| Each event |
| Corrective action and potential cost recovery |
| 11 |
| Event documentation |
| Maintain and provide complete event logs documenting mobilization, operations, communications and completion notifications |
| 100% compliance |
| Review of submitted documentation |
| Each event |
| Corrective action request |
File details come from the government source that posted it. Updated .