This document is a Federal Supply Schedule (FSS) Sole Source Justification for a follow-on procurement by the Department of Interior, Interior Business Center, Acquisition Services Directorate, Division 2, on behalf of the Department of Commerce, Bureau of Economic Analysis (BEA).

The acquisition seeks an Incident Disaster Recovery Site (IDRS) to support BEA's Continuity of Operations Plan during its transition from on-premises infrastructure to cloud-native architecture. The required services include remote disk-based data replication, transfer to Linear Tape-Open (LTO) tape for long-term archival storage, secure high-bandwidth communication for Wide Area Network and Internet access, and accommodation for up to 25 staff members for up to 42 days during major incidents. BEA requires at least one IDRS site within sixty miles of Suitland Federal Center, Maryland (Site B) with cubicles, private offices, and meeting space, and one backup site outside the sixty-mile radius (Site C). The intended awardee is Recovery Point Systems (UEI: 0070208256) using FSS contract 47QSMS24D0010 under Special Item Number 54151S (Information Technology Professional Services). The estimated total value is $905,815.90 for a one-year base period (12/1/2026–11/30/2027 at $170,614.57) plus four one-year options ($175,733.00; $181,004.99; $186,435.14; and $192,028.20 respectively). The sole source justification is based on GSAR 538.7104-3(b)(1)(iii) as a logical follow-on to the previously competitive order 140F0422F0028, citing operational continuity needs, technical complexity of migration, and risk mitigation during BEA's cloud migration completion (expected within 18-36 months), after which the requirement will sunset. The contracting officer determined the anticipated pricing represents fair and reasonable value based on established GSA price lists with additional discounts requested.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

INTERIOR BUSINESS CENTER

Washington, DC 20240

FEDERAL SUPPLY SCHEDULE (FSS)

SOLE SOURCE JUSTIFICATION

AUTHORITY: Revolutionary FAR Overhaul (RFO) 8.401(b), General Services

Acquisition Regulation (GSAR) 538.7104-J(b) and 40 U.S.C 501(b)(1)(A)

SOL No. 140D0426Q0909

This acquisition is conducted under the authority of the Federal Supply Schedule (FSS) program.

1. Identification of the agency and contracting activity, and specific identification of the document as a "FSS Sole Source Justification."

This document is a FSS Sole Source Justification for the Department of the Interior (DOI), Interior Business Center (IBC), Acquisition Services Directorate (AQD), Division 2 on behalf of the Department of Commerce (DOC) Bureau of Economic Analysis

(BEA).

2. Nature and/or description of the action being approved.

This is a follow-on requirement to an existing order. The current order, 140F0422F0028, was competitive.

The intended awardee is Recovery Point Systems using its FSS contract number 47QSMS24D0010 under Special Item Number (SIN) 54151S - Information Technology Professional Services.

Address: 75 W Watkins Mills Rd, Gaithersburg, MD 20878

UEI: 0070208256

3. A description of the supplies or services required to meet the agency's needs (including the estimated value).

BEA is seeking an Incident Disaster Recovery Site (IDRS) to facilitate implementation of BEA Continuity of Operations Plan (COOP). The recovery solution will accept remote disk-based data replication of backup data and transfer that data to Linear Tape-Open (LTO tape) for vaulted, long-term archival storage, and comprehensive recovery capabilities. The recovery environment will encompass secure, high-bandwidth communication capabilities for Wide Area Network (WAN) and Internet access and accommodate the bureau's retention periods for cycling tape usage.

To ensure that the IDRS's resources will be accessible to a portion of BEA's staff, during extended emergency circumstances, the Contractor must have at least one IDRS site located within sixty miles of BEA's current location at Suitland Federal Center (SFC) 4600 Silver Hill Road, Suitland, MD (designated Site B) and one site outside of the sixty-mile limit (designated Site C). Site B will also have the need to accommodate up to 25 staff members for up to 42 days during major incidents. A combination of cubicles, private offices and a meeting space is needed.

The estimated value is $905,815.90.

The period of performance is a one-year base and four one-year options.

Base Year

12/1/2026- 11/30/2027

Option Period 1 12/1/2027- 11/30/2028

Option Period 2 12/1/2028- 11/30/2029

Option Period 3 12/1/2029- 11/30/2030

Option Period 4 12/1/2030- 11/30/2031

$170,614.57 $175,733.00 $181,004.99 $186,435.14 $192,028.20

4. The authority and supporting rationale (see GSAR 538.7104-3(b)(1)): GSAR 538.7104-3(b)(1)(iii) - The order should be issued on a sole source basis in the interest of economy and efficiency because it is a logical follow-on to an FSS order already issued on a competitive basis.

The BEA requires continued Disaster Recovery Services from Recovery Point Systems to ensure the uninterrupted protection and continuity of mission-critical economic data and Information Technology (IT) systems during the ongoing transition from the current on premises environment to a cloud-native architecture. This continuity is essential for maintaining compliance with federal continuity mandates and safeguarding sensitive statistical assets until the migration is fully completed.

Technical Rationale for Sole Source

• Legacy Disaster Recovery Capabilities: BEA's current disaster recovery model relies on real-time replication of on-premises backup data to physical tape media, secure offsite storage, and resilient infrastructure certified to Uptime Institute Tier Ill/IV standards. These capabilities are currently provided by Recovery Point Systems, whose facilities and operational expertise have been integral to BEA's continuity posture.

• Cloud Migration Status: BEA has successfully migrated approximately two-thirds of its IT infrastructure to Microsoft Azure, leveraging geo-redundant, cloud-native backup and failover capabilities. The remaining one-third-including critical systems and legacy workloads-will be transitioned within the next 18-36 months, contingent on resource availability. During this period, tape-based backup handling and secure physical storage remain necessary to ensure data integrity and compliance.

• Contract Alignment: The current order, 140F0422F0028 with Recovery Point Systems has been strategically modified to remove obsolete physical disaster recovery and hot-site failover services, aligning expenditures with current operational needs and delivering significant cost savings (39% reduction, approximately $271,380 annually). Tape-based backup and storage will remain in scope until all workloads are fully migrated to Azure.

Risk of Transitioning to Another Vendor

• Operational Disruption: Transitioning to a new vendor during the migration period would introduce substantial risk, including loss of access to secure storage facilities, potential gaps in backup continuity, and delays in restoring services during emergencies. The unique requirements for federal data retention, security certifications, and rapid recovery cannot be easily replicated or transferred without jeopardizing BEA's compliance and mission readiness.

• Technical Complexity: The migration involves highly integrated and interdependent subsystems, legacy retention-bound systems, and specialized tape-handling protocols. A new vendor would require extensive onboarding, facility certification, and operational ramp-up, leading to increased costs, resource strain, and possible non-compliance with federal directives. The transition to a new vendor will redirect BEA technical resources from the primary goal of completing the infrastructure migration to Azure to an extensive onboarding period likely resulting in a delay in completing the migration.

• Continuity Mandates: Federal mandates (Presidential Decision Directive 67, HSPD-7) require uninterrupted continuity of operations. Any disruption in disaster recovery services could compromise the integrity of BEA's economic statistics and critical data releases.

Temporary Nature of the Requirement

• Cloud Migration Timeline: BEA's modernization strategy is on track to complete the migration of all remaining systems to Azure within three years. Once migration is finalized, a cloud-native backup and automated failover will fully replace legacy disaster recovery functions, eliminating the need for this contract.

• Contract Sunset: The justification for sole-source procurement is strictly transitional. As soon as all workloads are decommissioned or migrated, the contract will be terminated, and BEA will rely exclusively on its resilient cloud architecture.

Conclusion Awarding this logical follow on to Recovery Point Systems is in the interest of economy and efficiency to ensure uninterrupted disaster recovery services during BEA's continued cloud migration. This order, being a base year plus four one-year options, will provided continuity during the continued migration to the new solution and will ensure coverage in the event of any unforeseen delay while the current operating environment sunsets.

5. A determination by the ordering activity contracting officer that the order represents a fair and reasonable price consistent with GSAR 538.7102-2(d)(2) and 538.7104-2(a)(3).

SOL No. 140D0426O0909

Digitally signed by SAMANTHA DAVIS Date: 2026.09.28 13:17:30 -04'00'

The contracting officer (CO) determines that the anticipated price(s) will be fair and reasonable because the quote is anticipated to use the established price list (GSAR 538.7102-2(d)(2)).Additional discounts will also be requested as part of the solicitation.

6. A description of the market research conducted among schedule holders and the results or a statement of the reason market research was not conducted.

On 6/29/2026, the CO submitted a Market Research as a Service (MRAS) to GSA for this requirement. The MRAS confirmed that there are multiple GSA sources.

In reviewing the available ordering instruments the CO determined SIN 54151S was the best fit because the SIN caters to the obsolete nature of the requirement, i.e. the current on premises environment which requires physical disk backups. The other ordering instruments were for more modern disaster recovery solutions, i.e. cloud based backup solutions.

The MRAS listed several small businesses however a review of the acquisition history showed that only two small businesses submitted offers when this requirement was competed in 2021.

7. Any other facts supporting the justification.

The Request for Quotation (RFQ) will not be posted to e-Buy. The RFQ meets the exception to posting toe-Buy because it utilizes a justification that is executed and approved in accordance with GSAR 538.7104-3(b).

8. A statement of the actions, if any, the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies and services is made.

N/A. As described in item 4 this requirement is expected to sunset when the current migration effort is completed.

9. The ordering activity contracting officer's certification that the justification is accurate and complete to the best of the contracting officer's knowledge and belief.

I certify this justification is accurate and complete to the best of my knowledge and belief.

Samantha Davis Contracting Officer

SOL No. 140D0426O0909

10. Evidence that any supporting data that is the responsibility of technical or requirements personnel (e.g., verifying the Government's minimum needs or requirements or other rationale for limited sources) and which form a basis for the justification have been certified as complete and accurate by the technical or requirements personnel.

I certify the technical data which forms a basis for this justification is complete and accurate and meet the Government's minimum needs.

Precious Forbes Program Manager/COR

11. For justifications under GSAR 538.7104-3(b)(1) (iii), a written determination by the approving official identifying the circumstance that applies.

12. Reviews and Approvals:

Approve

Sharon Roberts Head of the Contracting Activity

FEDERAL SUPPLY SCHEDULE (FSS) SOLE SOURCE JUSTIFICATION
1. Identification of the agency and contracting activity, and specific identification of the document as a "FSS Sole Source Justification."
2. Nature and/or description of the action being approved.
3. A description of the supplies or services required to meet the agency's needs (including the estimated value).
Temporary Nature of the Requirement
Conclusion
5. A determination by the ordering activity contracting officer that the order represents a fair and reasonable price consistent with GSAR 538.7102-2(d)(2) and 538.7104-2(a)(3).
6. A description of the market research conducted among schedule holders and the results or a statement of the reason market research was not conducted.
7. Any other facts supporting the justification.
8. A statement of the actions, if any, the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies and services is made.
9. The ordering activity contracting officer's certification that the justification is accurate and complete to the best of the contracting officer's knowledge and belief.
10. Evidence that any supporting data that is the responsibility of technical or requirements personnel (e.g., verifying the Government's minimum needs or requirements or other rationale for limited sources) and which form a basis for the justificatio...