This statement of work outlines water and wastewater utility services for Chemawa Indian School in Salem, Oregon. The contractor shall provide an estimated 360,000 gallons of water per year and related wastewater services to the school's facilities. The contractor must follow all security protocols at the Bureau of Indian Education site, including checking in and out daily at the main office. Equipment used to supply and measure water and wastewater services remains the property of the contractor, who is responsible for operation, maintenance, removal, and site restoration. Coordinating federal opportunity 140A2324Q0097, the Department of the Interior Bureau of Indian Affairs Bureau of Indian Education is soliciting offers for water and sewage services at Chemawa Indian School.

View the file

Other files

File Type Posted
Sol_140A2324Q0097.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

Chemawa Indian School

2.0 SCOPE OF WORK WATER AND WASTE WATER UTILITY

2.1 The contractor shall provide water and waste water services to the government facilities at:

Chemawa Indian School 3700 Chemawa Road NE Salem OR 937305-1199

2.2 The contractor shall provide water and waste water services as follows:

Water and Waste Water

Estimated Annual Water Use: 360,000 Gallons per year

2.3 CONTRACTOR’S EQUIPMENT

The Contractor, at its expense shall furnish and install at all facilities required to supply water and waste water utility service and measure such services at the delivery points specified. The equipment remains the property of the Contractor. The Contractor shall at all times during the life of this contract, operate and maintain such equipment at its expense, and shall assume all taxes and other charges in connection therewith. Said equipment shall be removed and the Government premises restored as near as practicable to their original condition, ordinary wear excepted, by the Contractor, at its expense, within a reasonable time after discontinuance of services under this contract. The Government shall assume any damage to the equipment (meters, etc.) by the Government.

2.4 SECURITY REQUIREMENTS

The contractor must follow the security process at the BIE facility. The COR will provide the necessary facility pass requirements, security clearance requirements, etc. The contractor is required to check in and out at the main office daily when entering and leaving the facility. BIE reserves the right to inspect all boxes, packages etc. coming into and exiting from any BIE facility.

2.5 ACCESS TO PREMISES

The Contractor shall have access to the premises served at all reasonable times during the continuance of this contract and at its termination for the purpose of reading, meters, making installations, repairs, and removals of the Contractor’s equipment, and for any other proper purposes hereunder; provided, however, that proper Governmental authority may limit or restrict such right of access in any manner considered by such authority to be necessary to advisable.