Revised_SCOPE_of_WORK_Dorm_Toilets_07_27_2023_0001.pdf
PDF 137 KB Posted
- Solicitation number
- 140A2323Q0539
About this file
This Scope of Work document outlines requirements for a toilet replacement project at the Wingate Elementary and Middle School dormitory. The project requires the removal and disposal of 75 existing toilets and 3 urinals, and their replacement with 75 Glacier Bay High Efficiency Toilets and 3 urinals. An additional 8 Glacier Bay High Efficiency Toilets are to be provided for future use if needed. The contractor must also install new wax rings, water line connections, and apply caulking sealant around all toilet and urinal bases. The related federal contract opportunity is solicitation number 140A2323Q0539 for Toilet Replacement Residential at Fort Wingate from the Department of Interior Bureau of Indian Affairs Bureau of Indian Education. The Scope of Work provides details on the products and services required to complete the dormitory toilet replacement project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| image2_0002.png | PNG image | |
| IMG_7601_0002.jpg | JPG image | |
| IMG_7605_0002.jpg | JPG image | |
| image_0002.png | PNG image | |
| Wingate_Elementray_School_Commodes_Urinals_8_3_2023_0001_0002.pdf | ||
| image1_0002.png | PNG image | |
| IMG_7600_0002.jpg | JPG image | |
| Sol_140A2323Q0539_Amd_0002.pdf | ||
| IMG_7604_0002.jpg | JPG image | |
| IMG_7603_0002.jpg | JPG image | |
| IMG_7606_0002.jpg | JPG image | |
| Sol_140A2323Q0539_Amd_0001.pdf | ||
| Sol_140A2323Q0539.pdf | ||
| Specification_of_Tiolet.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF INDIAN EDUCATION
Wingate Elementary and Middle School P.O. Box 1
Ft. Wingate, New Mexico 87316 Telephone: 505-488-6300 Fax: 505-488-6312
SCOPE OF WORK: Toilet Replacement Dormitory {updated 07.27.2023}
To provide and install toilets and urinals in the dormitory at Wingate Elementary and Middle School
This project will also require the removal and disposal of the current toilets.
Additionally, the Scope of Work will include repair of installed toilets for 30 days after the final installation
The Scope of Work includes removal and disposal of (3) Urinals, (75) existing toilets AND 8 additional toilets (not installed at this time but available if a replacement is needed). The complete installation of (3) Urinals and Glacier Bay High Efficiency Toilets (75) (including wax rings and water lines). Installation and removal of urinals in recreation restrooms. Sealant and caulking or all installed items
• Provide and install 75 Glacier Bay High Efficiency Toilets and dispose of current 75 toilets
• Provide 8 additional Glacier Bay High Efficiency Toilets for future use as needed
• Provide, install and dispose of current urinals (3) in recreation restrooms
• Install new toilets with wax rings
• Install new water line connections for all toilets/urinals
• Apply caulking sealant around toilet and urinal bases
| United States Department of the Interior |
| Wingate Elementary and Middle School |
| P.O. Box 1 |
| Ft. Wingate, New Mexico 87316 |
| Telephone: 505-488-6300 Fax: 505-488-6312 |
File details come from the government source that posted it. Updated .