Pre-Bid_Meeting_Agenda_0001.pdf
PDF 136 KB Posted
- Attached to
- Lateral 73-36 Check One Replacement
- Solicitation number
- 140A1624R0002
About this file
This document contains a pre-bid meeting agenda and details for a federal contract opportunity for lateral check replacement on the Colorado River Irrigation Project. The pre-bid meeting will include introductions by Bureau of Indian Affairs and DOWL representatives, an overview of administrative procedures, a project overview presentation, and a question and answer session. Attendees will then drive to the project site south of Parker, Arizona for a controlled, on-site field review of the existing check location and infrastructure, proposed bypass location, and area for the new check from 10:30 am to 12:00 pm local time on March 21, 2024. The related federal contract opportunity is solicitation number 140A1624R0002 for the Lateral 73-36 Check One Replacement project through the Department of the Interior Bureau of Indian Affairs Central Office.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Colorado River Irrigation Project Lateral 73-36 Check One Replacement
Bureau of Indian Affairs Colorado River Agency Conference Room
12124 1st Ave, Parker, AZ
March 21, 2024 – all times are local time
8:30 a.m. to 10:00 a.m. Project overview by BIA/DOWL at BIA CRA Conference Room (Parker, AZ)
• Introductions
• Administrative Procedures (by the BIA Contracting Officer)
• Project Overview (By DOWL)
• General Q&A
10:00 a.m. to 10:30 a.m. Drive to the Project Site (south of Parker, AZ)
10:30 a.m. to 12:00 p.m. On-site Field Review (Controlled Access)
• Meet at Lat. 73-36 Check 1
• Review access routes
• Review existing Check 1 location and nearby infrastructure
• Review the bypass location, adjacent areas, and new check location
| March 21, 2024 – all times are local time |
| 8:30 a.m. to 10:00 a.m. Project overview by BIA/DOWL at BIA CRA Conference Room (Parker, AZ) |
| 10:00 a.m. to 10:30 a.m. Drive to the Project Site (south of Parker, AZ) |
| 10:30 a.m. to 12:00 p.m. On-site Field Review (Controlled Access) |
File details come from the government source that posted it. Updated .