140A0722Q0014_AMDP0001_PG6_0001.pdf
PDF 33 KB Posted
- Attached to
- SOLID WASTE REMOVAL SERVICES AT BUREAU OF INDIAN A Federal contract opportunity
- Solicitation number
- 140A0722Q0014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140A0722Q0014_AMDP0002_PG23_0002.pdf | ||
| Sol_140A0722Q0014_Amd_0002.pdf | ||
| Sol_140A0722Q0014_Amd_0001.pdf | ||
| Sol_140A0722Q0014.pdf | ||
| 140A0722Q0014_PG3_40.pdf | ||
| ATTACHMENT_D_1__Trash_Bin_Locations_031122.pdf | ||
| ATTACHMENT_D_2__DOL_WAGE_DETERMINATION_062722_2015-5423_Rev19.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION # 140A0722Q0014 AMD P0001 BIA-SWRO-UTE MOUNTAIN UTE AGENCY
SERVICE: SOLID WASTE REMOVAL SERVICES PG 6 OF 40
B.6. Hours of Operations
(a) Normal Hours of Operation
The Contractor must perform the services required under this contract during the following hours:
8 a.m. to 5:00 p.m. The Contractor is responsible for notifying the COR if he/she will be late or is ill and unable to work for other reasons. Working time for this contract will need to be negotiated.
Once the schedule is established, any deviations to the schedule must be approved in advance by the COR. If it is required of the BIA to supply an attendant to stay after the normal hours of operation, the Contractor must cover the additional cost of the BIA attendant.
(b) Holidays
Holidays are in accordance with the U.S. Government Office of Personnel Management website:
http://www.opm.gov/Operating_Status_Schedules/fedhol/2022.asp. Future calendar years can be found at the same website.
(c) Emergency or Special Event Services
Workdays may be interrupted by unannounced closures of the government facilities or Tribal
Reservation for early release, dismissal, unforeseen weather, electric power outages, and fire or tradition activities.
B.7. Contractor-Furnished Items and Services
The Contractor must provide all personnel, travel, vehicles, technology, equipment, tools, repairs, supplies, materials, supervision, insurance, permits, and training necessary to perform Solid Waste
Removal services to complete required tasks and provide the deliverables under this project. The contractor must furnish everything needed to perform this project according to all its terms and conditions.
B.8. Specific Contractor Tasks
(a) Provide a solid waste removal schedule (2 days per week) to be approved by BIA UMU COR.
This schedule will not change without notification and approval by BIA.
(b) Provide all labor, trucks, and trash bins.
(1) Detention Facility, 107 Spruce Street, Towaoc, CO recommended trash bins
(i) 1 ea. - 8 cubic yard bin
(ii) 1 ea. - 8 cubic yard recycle bin
(2) 102 Chief Green Street, Towaoc, CO recommended trash bins - 1 each 6 cubic yard bin
(3) All trash containers shall have properly operating lids on them to avoid waste from blowing out and animals scavenging and littering areas around trash containers.
(4) Damaged trash bins will not be accepted for use at designated sites, attachment D.1. BIA will advise Contractor if one exists.
(5) Contractor will obey all traffic signs on BIA UMU grounds.
(6) Hazardous waste is not included.
File details come from the government source that posted it. Updated .