Sol_140A0126Q0017_Amd_0001.pdf
PDF 244 KB Posted
- Attached to
- Firefighting Skid Units for Standing Rock Agency
- Solicitation number
- 140A0126Q0017
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a BIA (Bureau of Indian Affairs) procurement, Amendment Number 0001, effective 01/09/2026. The amendment replaces the original solicitation specifications with updated requirements for two fire/water response skid units: a 200 Gallon Skid Unit and a UTV Skid Unit.
The 200 Gallon Skid Unit specifications include an all-aluminum construction with stainless steel piping, a 13 HP engine with electric start, a two-stage high-pressure pump capable of self-priming to 19', and a 200-gallon poly water tank with an integrated 5-gallon foam cell. The UTV Skid Unit features similar construction with a 6.5 HP gas-driven pump, a 70-gallon poly water tank, and a manual hose reel with 100' of 3/4" booster hose. Both units have multiple gated discharge and suction ports, pressure gauges, low oil protection, and specific dimension requirements. The solicitation close date remains unchanged from the original document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Updated_Specs_0001.docx | DOCX document | |
| Sol_140A0126Q0017.pdf | ||
| Attachment_1__SPECS.pdf | ||
| Attachment_2__Pricing_Template_Skids.pdf | ||
| Attachment_3__IEE_Representation_Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Teihahnietuh McCargo
See continuation page
BIA GPRO 00001
115 4TH AVENUE SE
Contracting Office Aberdeen SD 57401-4382
A01
140A0126Q0017
01/09/2026
01/09/2026
1 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140A0126Q0017/0001
The purpose of this solicitation amendment is to replace the specifications attached to the original Solicitation. Please see "Updated
Specs" for the correct requirements.
Solicitation close date remains unchanged.
200 Gallon Skid Unit Required Specifications
• All aluminum construction with bright aluminum diamond plate and aluminum tubing sub-frame
• All stainless steel piping and 1/4 turn brass valves
• Two Stage High Pressure Pump: Twin impeller with water pressure gauge
• 13 HP Engine w/ electric start
• Pump able to self-prime to 19′
• Low oil protection system
• 1 gated 1-1/2″ discharge
• 1 gated 1″ pump to tank refill
• 1 gated 1″ to booster reel
• 1 gated 1-1/2″ auxiliary suction
• 1 gated 1-1/2″ tank to pump – all NST threads
• Pump that flows: 120 GPM @ 60 PSI, 100 GPM @ 85 PSI, 23 GPM @ 225 PSI
• 200 gallon poly water tank with integrated 5 gallon foam cell and baffles –
• Foam System
• Electric hose reel with 50′ of 1″ booster hose with wildland adjustable fog nozzle
• Integrated water tank sight gauge
• Adapter to refill water backpacks in the field without starting pump
• Reinforced skid plate bottom for fork lifts
• Water drafting kit that includes hand primer installed on skid; 20’ of 1.5” suction hose; Foot Valve / Strainer
• Dimensions 48”W x 94”L x 45”H with pump on pump platform
As for the UTV amendment, here are the specs:
UTV Skid Unit required Specifications
• All aluminum construction
• All stainless steel piping & brass valves
• Two Stage High-Pressure Pump: Twin impeller with water pressure gauge
• Gas-driven pump 6.5 HP engine with electric start and able to self-prime to 19′
• Hand Primer
• Nitrile rubber seal & casing “O” rings
• Low oil protection
• Flows 65 GPM @ 48 PSI; 50 GPM @ 81 PSI; 20 GPM @ 120 PSI
• 1 gated 1-1/2″ discharge
• 1 gated 1″ discharge
• 1 gated 1″ pump to tank refill
• 1 gated 1″ to booster reel
• 1 gated 1-1/2″ auxiliary suction
• 1 gated 1-1/2″ tank to pump
• 70 gallon poly water tank
• Hose Reel manual crank with 100′ of 3/4″ Booster Hose
• Around the pump 1-1/2″ line with shut off for water pack refill
• Water tank sight gauge
• Dimensions: 48”W x 34”L x 38”H or 48"W x 55"L x 38"H
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .