14-RFP 10255 Facilities Management Cost Proposal Form.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
RFP#: 10255-Facilities Management System
Solicitation number
US.261480
Issued by
Philadelphia County, Philadelphia City, Pennsylvania

About this file

This is a Cost Proposal Form for RFP #10255 issued by the Community College of Philadelphia's Procurement Department for a Facilities Management System to be delivered as a Software-as-a-Service (SaaS) solution. The RFP solicits proposals for a comprehensive facilities management application encompassing work order management, preventive maintenance scheduling, integrated key and lock management, space management with AutoCAD integration, facility condition assessments, asset and equipment management, compliance inspections, mobile field access, reporting tools, and system integrations including Single Sign-On and HR/IT data imports. The RFP opened November 13, 2026, with queries due by December 11, 2026 at 12:00 p.m. EDT and the College's response to queries due by December 22, 2026 at 5:00 p.m. EDT. Proposals are due Wednesday, January 27, 2027 at 12:00 p.m. EDT, with finalist interviews scheduled for the week of February 4, 2027, and a bid award announcement on March 1, 2027. The contract term is three years with two optional renewal years (Years 4 and 5) for a maximum five-year contract period. Proposals should be submitted via the Bonfire Hub portal at https://pennbid.bonfirehub.com/.

The Cost Proposal Form provided contains blank pricing sections for all implementation, recurring licensing, and optional services, with no specific pricing amounts submitted. The form is structured to capture one-time implementation costs (system setup, data migration, AutoCAD drawing onboarding, SSO integration, training, and go-live support), annual recurring subscription fees for Years 1 through 5 (core system, key and lock management module, space management module, facility condition assessment module, mobile app licenses, cloud hosting, and premium technical support), and optional services (on-site assessments, ERP integration, BAS integration, Power BI access, and capital project management module). The College's current environment includes legacy data in Accruent FAMIS and spreadsheets requiring historical data migration, and the solution must accommodate integration with Ellucian Banner ERP and support for 800+ employees. No set-asides are indicated in this procurement document.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions & Cover

Community College of Philadelphia - Procurement Department
RFP#10255: Facilities Management System
Bidder Cost Proposal & Functional Response Matrix
Vendor Name:
Primary Contact Name:
Primary Contact Email/Phone:
Submission Date:
Cooperative Purchasing Contract (if applicable):e.g., Sourcewell / E&I / PA COSTARS
Cooperative Contract Number (if applicable):
RFP Response Codes Legend
CodeDefinitionDescription
INIncludedFully available in the current production release at the proposed base price.
AMAdditional Module / FeeFully available, but requires an extra license or module fee (must be line-itemed in Pricing Schedule).
CUCustomizationRequires custom code/development; state estimated cost and timeline in the explanation.
TPThird-PartyProvided via a partner/third-party software integration; state product name and partner details.
FRFuture ReleaseNot in current production release; state target release date (Note: Not counted as currently available).
NANot AvailableProposed system cannot fulfill this requirement.

Functional Response Matrix

RFP Ref #Section / ModuleRequirement / Function DescriptionResponse CodeExplanation / Module Name / Partner Details
3.1.1Work Order ManagementOnline request portal for campus users (unlimited requester submission)
3.1.2Work Order ManagementConfigurable request forms by type (e.g., repair request, key request)
3.1.3Work Order ManagementWork order creation & assignment (individual employees, work groups, outside contractors)
3.1.4Work Order ManagementUrgency and priority setting
3.1.5Work Order ManagementMulti-step approval workflows (supervisor or budget approval)
3.1.6Work Order ManagementEnd-to-end real-time status tracking for requesters and Facilities staff
3.1.7Work Order ManagementLabor hours, materials, equipment used, and cost logging
3.1.8Work Order ManagementContractor tracking (work orders & contractor costs separated from in-house work)
3.1.9Work Order ManagementFile, document, and photo attachments and notes on work orders
3.1.10Work Order ManagementMaintenance history retention by building, room, equipment, or location
3.1.11Work Order ManagementAutomated email notifications on status change to requesters, staff, and contractors
3.1.12Work Order ManagementStandard reporting (open/completed work orders, response times, backlog age)
3.2.1Preventive MaintenanceRecurring maintenance schedule setup
3.2.2Preventive MaintenanceAutomated work order generation when maintenance is due
3.2.3Preventive MaintenanceAssignment to staff, work groups, or outside contractors
3.2.4Preventive MaintenanceTriggering by calendar date, fixed time interval, or meter/run-hour readings
3.2.5Preventive MaintenanceIntegrated inspection checklists and maintenance instructions
3.2.6Preventive MaintenanceUpcoming, completed, and overdue maintenance tracking
3.2.7Preventive MaintenanceMaintenance history retention across buildings, equipment, and assets
3.2.8Preventive MaintenanceAutomated reminder alerts for upcoming or overdue maintenance
3.2.9Preventive MaintenancePM completion rate and activity reporting
3.3.1Key & Lock ManagementBuilt-in inventory of keys, locks, cores, and related hardware (native, non-3rd party)
3.3.2Key & Lock ManagementTracking key numbers, types, quantities, and physical locations
3.3.3Key & Lock ManagementModeling existing master key hierarchy, keyways, and Schlage lock hardware
3.3.4Key & Lock ManagementLinking keys directly to doors, locks, cores, and rooms they open
3.3.5Key & Lock ManagementIssuance, return, and transfer logging for employees, contractors, or departments
3.3.6Key & Lock ManagementTracking lost, stolen, unreturned, or replaced keys
3.3.7Key & Lock ManagementIdentification of master keys and restricted access keys
3.3.8Key & Lock ManagementRekeying / lock change history and automatic updates to door/core records
3.3.9Key & Lock ManagementRekeying & core change work order creation directly from key records
3.3.10Key & Lock ManagementKey holder electronic acknowledgment & accountability records
3.3.11Key & Lock ManagementCross-reference reporting: every key held by a person / every key opening a given door
3.3.12Key & Lock ManagementOffboarding audit reports (keys held by departing/transferred employees)
3.3.13Key & Lock ManagementRestricted access permissions for key cut codes and master key data
3.3.14Key & Lock ManagementLimited, read-only key lookup portal for Campus Security staff
3.4.1Space Management & AutoCADNative import and ingestion of DWG / DXF AutoCAD drawings
3.4.2Space Management & AutoCADTwo-way bidirectional sync between DWG drawings and room/space records
3.4.3Space Management & AutoCADAutomated delta/discrepancy reporting (drawings vs. room records)
3.4.4Space Management & AutoCADBrowser-based floor plan viewer (no AutoCAD license required)
3.4.5Space Management & AutoCADDepartmental color-coded floor plan shading (occupancy, vacancy, room type)
3.4.6Space Management & AutoCADOccupant assignment tracking (multiple employees per office/workspace, shared offices)
3.4.7Space Management & AutoCADNon-login occupant records (storing all 800+ employees regardless of system login)
3.4.8Space Management & AutoCADHistorical room assignment records with start and end dates
3.4.9Space Management & AutoCADAutomated bulk occupant updates via HR/IT CSV & spreadsheet imports
3.4.10Space Management & AutoCADDirect linking between occupant records and issued keys
3.4.11Space Management & AutoCADVacant space, department occupancy, and square footage reporting
3.4.12Space Management & AutoCADSupport for future space utilization and departmental cost allocation reporting
3.5.1Facility Condition AssessmentsBuilding and major component asset inventory
3.5.2Facility Condition AssessmentsAge, condition rating, and assessment documentation
3.5.3Facility Condition AssessmentsEstimated repair/replacement cost logging and deferred maintenance tracking
3.5.4Facility Condition AssessmentsAutomatic Facility Condition Index (FCI) calculation (by building and campus)
3.5.5Facility Condition AssessmentsProjected cost modeling for deferred repairs over multi-year horizons
3.5.6Facility Condition AssessmentsConversion of assessment findings into capital project requests
3.5.7Facility Condition AssessmentsImporting condition data from third-party assessment reports
3.5.8Facility Condition AssessmentsMulti-year capital renewal forecasting and long-term capital planning reports
3.5.9Facility Condition AssessmentsOptional: On-site physical facility condition assessment services
3.6.1Asset & Equipment ManagementComprehensive asset profile (mfr, model, serial #, install date, location)
3.6.2Asset & Equipment ManagementAutomated warranty expiration flagging on work orders
3.6.3Asset & Equipment ManagementAsset condition, expected useful life, and complete repair history tracking
3.6.4Asset & Equipment ManagementMobile barcode and QR code scanning for asset lookup
3.6.5Asset & Equipment ManagementDirect linking of assets to PM schedules and corrective work orders
3.6.6Asset & Equipment ManagementCapital construction closeout import (COBie and spreadsheet formats)
3.7.1Reports & Management ToolsAd-hoc custom report builder without vendor assistance or programming
3.7.2Reports & Management ToolsScheduled automated report emailing and export to PDF/Excel
3.7.3Reports & Management ToolsRole-based, configurable dashboards (director, manager, technician)
3.7.4Compliance InspectionsCode-required recurring compliance inspection scheduling (fire, elevator, etc.)
3.7.5Compliance InspectionsInspection attachment storage (certificates, permits, contractor test results)
3.7.6Compliance InspectionsDeficiency logging with direct work order creation and open deficiency tracking
3.7.7Ease of Use & Mobile AccessNative iOS and Android mobile app for field technicians
3.7.8Ease of Use & Mobile AccessFull offline mobile functionality with auto-sync upon network reconnection
3.10.1Integrations & SecuritySingle Sign-On (SSO) via SAML 2.0 / Microsoft Entra ID (Azure AD)
3.10.2Integrations & SecurityScheduled automated HR/IT CSV import for employee, department, and phone data
3.10.3Integrations & SecurityOpen Application Programming Interface (API) for data exchange
3.10.4Integrations & SecuritySOC 2 Type II Certification & completed HECVAT documentation provided
3.10.5Integrations & SecurityFull data export capability in non-proprietary formats at any time
3.10.6Integrations & SecurityOptional: Read-only reporting access for Power BI / BI tools
3.10.7Integrations & SecurityOptional: Building Automation System (BAS) alarm-to-work-order integration
3.10.8Integrations & SecurityOptional: Ellucian Banner ERP System Integration

Cost Proposal & 5-Year TCO

RFP#10255: Pricing Proposal & 5-Year Financial Schedule
Community College of Philadelphia - Facilities Management System Procurement
Section A: Initial Implementation, Setup & One-Time Costs
Item #Description / DeliverablePricing ModelTotal One-Time Fee ($)
A.1System Setup, Configuration & Workflow DesignFixed Price$0.00
A.2Historical Data Migration (from Accruent FAMIS & Spreadsheets)Fixed Price$0.00
A.3AutoCAD Drawing Onboarding & Initial Layer Standard PreparationPer Drawing / Fixed$0.00
A.4Single Sign-On (SSO) & HR/IT Scheduled Data Import SetupFixed Price$0.00
A.5Administrator, Supervisor & Staff Training (On-Site & Virtual)Lump Sum$0.00
A.6Initial Go-Live Support & Hypercare PeriodFixed Price$0.00
SUBTOTAL - ONE-TIME IMPLEMENTATION COSTS$0.00
Section B: Software Subscriptions & Recurring Annual Licensing (Years 1 to 5)
Item #Module / License ComponentYear 1 ($)Year 2 ($)Year 3 ($)Opt. Year 4 ($)Opt. Year 5 ($)
B.1Core System Subscription (Work Orders, PM, Assets)$0.00$0.00$0.00$0.00$0.00
B.2Key & Lock Management Module (if separate fee)$0.00$0.00$0.00$0.00$0.00
B.3Space Management & AutoCAD Connector Module$0.00$0.00$0.00$0.00$0.00
B.4Facility Condition Assessment (FCA) Module$0.00$0.00$0.00$0.00$0.00
B.5Mobile App License Fees (Technicians/Supervisors)$0.00$0.00$0.00$0.00$0.00
B.6Cloud Hosting, Infrastructure, Backups & Security Maintenance$0.00$0.00$0.00$0.00$0.00
B.7Tier 1 Premium Technical Support & Named Account Manager$0.00$0.00$0.00$0.00$0.00
SUBTOTAL - ANNUAL RECURRING SOFTWARE SUBSCRIPTIONS$0.00$0.00$0.00$0.00$0.00
Section C: Optional Services & Integrations
Item #Optional Service / Module DescriptionOne-Time Cost ($)Annual Recurring Cost ($)
C.1On-Site Physical Facility Condition Assessment Services$0.00$0.00
C.2Ellucian Banner ERP System Integration$0.00$0.00
C.3Building Automation System (BAS) Alarm Integration$0.00$0.00
C.4Direct Power BI Reporting Database Access$0.00$0.00
C.5Capital Project Management Module$0.00$0.00
Section D: 5-Year Total Cost of Ownership (TCO) Summary
Contract PeriodImplementation Fee (Sec A)Recurring Subscriptions (Sec B)Total Annual Cost ($)Notes / Escalation
Year 1 (Initial Term)$0.00$0.00$0.00Includes setup + Year 1 licensing
Year 2 (Initial Term)$0.00$0.00$0.00Year 2 recurring subscription
Year 3 (Initial Term)$0.00$0.00$0.00Year 3 recurring subscription
INITIAL 3-YEAR TOTAL$0.00$0.00$0.00Base Contract Term Total
Year 4 (Optional Renewal)$0.00$0.00$0.00Optional Renewal Year 4
Year 5 (Optional Renewal)$0.00$0.00$0.00Optional Renewal Year 5
MAXIMUM 5-YEAR TOTAL$0.00$0.00$0.005-Year Maximum Contract Value

File details come from the government source that posted it. Updated .