14-Bid Package.pdf

PDF 3 MB Posted

Attached to
Petrolia Borough and Karns City Borough Manhole Project
Solicitation number
US.263023
Issued by
Butler County, Pennsylvania

About this file

This bid package is for the Bear Creek Watershed Authority CDBG Manhole Rehabilitation Project, a federally-assisted construction contract administered by the County of Butler as the CDBG Grantee in partnership with the municipalities of Petrolia Borough and Karns City Borough, Pennsylvania. The project involves manhole rehabilitation work at specified locations within these boroughs. Sealed bids must be submitted electronically via PennBid no later than 9:00 a.m. on January 7, 2027, with bid opening and results to follow on the same date at the Butler County Government Center. The contract will be awarded to the lowest responsible bidder complying with all bidding conditions. No specific contract term or renewal options are detailed in the bid package; the work scope is defined by the technical specifications and drawings referenced within the contract documents.

Bidders must provide a bid guarantee (bid bond, certified check, bank draft, or negotiable U.S. Government Bonds) equal to not less than ten percent of the bid amount. The successful bidder shall furnish performance, payment, and twelve-month maintenance bonds each equal to 100 percent of the total contract price. All work is subject to prevailing wage requirements under the Davis-Bacon Act, with minimum wage rates and labor standards provisions specified in the contract. The project is federally funded through the Pennsylvania Community Development Block Grant (CDBG) Program administered by the Department of Community and Economic Development. Bidders must comply with extensive federal requirements including Executive Order 11246 (equal employment opportunity with goals of five percent minority and three percent female workforce participation), Title VI of the Civil Rights Act, Section 3 employment and business utilization provisions, MBE/WBE solicitation and participation commitments, noncollusion affidavits, and various certifications regarding non-segregated facilities, equal employment opportunity, and non-discrimination. All bidders are required to submit specific federal forms, qualifications statements, and compliance documentation with their bids; failure to submit required certifications may result in bid rejection as non-responsive.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Latrobe Corporate Office 1004 Ligonier Street, PO Box 853

Latrobe, PA 15650 Phone: 724-539-8562

Fax: 724-539-3697 www.gibson-thomas.com

ESTABLISHED 1916

Fayette ■ Harrisburg ■ Indiana ■ Lawrence ■ Pittsburgh ■ Washington

Bear Creek Watershed Authority

CDBG – Manhole Rehabilitation Project Contract 1/2026

November 2026

INDEX

Invitation For Bids

Notice To Bidders (page 3)

Instructions To Bidders (page 4)

Statement Of Bidder’s Qualifications (page 10)

Bonds and Insurance Forms (contractor’s)

General Specifications – General Conditions Part I (page 13)

General Conditions Part II – Federal Requirements (page 31)

Special Conditions For Site Preparation – Part III (page 54)

*Bid Specifications Supplied by the Engineer (page 100 or later)

FEDERAL FORMS:

Certification Of Non Segregated Facilities (page 61) Noncollusion Affidavit Of Prime Bidder (page 62) Noncollusion Affidavit Of Subcontractor (page 63) Certification Of Bidder Regarding EEO (page 64) Certification Of Subcontractor Regarding EEO (page 65-66) DCED-OCD-001 MBE/WBE Solicitation and Commitment Statement (page 68) Minority Business Utilization Certification (page 70) MBE/WBE Requirements For Bid Submittal (page 75) MBE/WBE Contractor Unavailability Certificate (page 78) MBE/WBE Disclosure Affidavit (page 79) Non-Discrimination Clause (page 80-81)

Manpower Utilization Training Table (page 82) Section 3 Work Force Needs Table (page 83-84)

Prime Contractor MBE/WBE Utilization Report (page 85) Subcontractor MBE/WBE Utilization Report (page 86)

Public Works Employment Verification Form (page 87) Section 3 Clause (page 89) Section 3 Contract Solicitation and Commitment Statement (page 90) Prime Contractor Section 3 Utilization Report (page 91) Subcontractor Section 3 Utilization Report (page 92) BABA (Build America, Buy America)

General Wage Decision

NOTICE TO BIDDERS

The following certification must be submitted with your bid.

Failure to submit these forms can be construed as lack of bidder responsibility and constitute an invalid bid.

*A bid bond is required to be submitted with your bid*

Forms:

1. MBE/WBE Contact Solicitation and Commitment Statement

2. SECTION 3 Contact Solicitation and Commitment Statement

• Section 3 Workforce Needs Table (if bid is over $200,000)

• Manpower Utilization Training Table (if bid is over $200,000)

3. Certification of Non-Segregated Facilities

4. Non-Collusion Affidavit of Prime Bidder

• Non-Collusion Affidavit of Subcontractor

5. Certification of Bidder regarding Equal Employment Opportunity

• Certification of Subcontractor regarding Equal Employment Opportunity

6. Non-Discrimination Clause, Prime Bidder

• Non-Discrimination Clause, Subcontractor

7. Statement of Bidder’s Qualifications

8. Minority Business Utilization Certification

9. Public Works Employment Verification Form

• Public Works Employment Verification Form, Subcontractor

10. MBE/WBE Contractor Unavailability Certificate, if applicable

11. MBE/WBE Disclosure Affidavit, if applicable

12. BABA (Build American, Buy America) Certification

13. Byrd Anti-Lobbying

INSTRUCTIONS TO BIDDERS

1. Bids or Proposals

The Bid Form is included with the Bidding Documents for Reference. Bidders shall complete the electronic bid form within PennBid (“Prepare Your Submission” tab), inclusive of all pricing items and required supporting documents as identified.

2. Interpretations of Addenda

No oral interpretation will be made to any Bidder as to the meaning of the Contract Documents.

Every interpretation made to a Bidder will be in the form of an Addendum to Bidders shall be bound by such Addenda, whether or not reviewed by the Bidders. All such Addenda shall become part of the Contract and all Bidders shall be bound by such Addenda, whether or not reviewed by the Bidders.

3. Inspection of Site

Each Bidder should visit the site of the proposed work and fully acquaint himself with the existing conditions there relating to construction and installation and should fully inform himself as to the facilities involved, the difficulties and restrictions attending the performance of the Contract. The Bidder should thoroughly examine and familiarize himself with the Drawings, Technical Specifications, and all other Contract Documents. The Contractor by the execution of the Contract shall in no way be relieved of any obligation under it due to his failure to receive or examine any form or legal instrument or to visit the site and acquaint himself with the conditions there existing and the County of Butler and/or Owner will be justified in rejecting any claim based on facts regarding which he should have been on notice as a result thereof.

4. Alternative Bids

No alternative bids will be considered unless alternative bids are specifically requested.

5. Bids

A. Bids shall be submitted online via the PennBid Program (https://pennbid.bonfirehub.com) by the date and time indicated in the Invitation for Bids along with the Bid security and the other documents required to be submitted as identified herein, and subject to all requirements of the Contract Documents, including the Drawings, and these INSTRUCTIONS TO BIDDERS. All bids must be regular in every respect and no interlineations, excisions or special conditions shall be made or included in the Bid Form by the Bidder.

B. The County of Butler and/or Owner may consider any irregular Bid on which there is an alteration of or departure from the Bid Form hereto attached and at its option may reject the same.

C. If the Contract is awarded, it will be awarded by the County of Butler and/or Owner to a responsible Bidder on the basis of the lowest Bid and the Selected Alternative Bid items, if any. The Contract will require the completion of the work according to the Contract Documents.

D. Each Bidder shall include in his bid the following information:

Principals

Names Home addresses, including City, State and Zip Code

Firm

Employer Identification Number

Address City, State and Zip Code https://pennbid.bonfirehub.com/

6. Bid Guarantee

A. The Bid must be accompanied by a Bid Guarantee which shall not be less than ten percent (10%) of the amount of the Bid. At the option of the Bidder, the guarantee may be a certified check, bank draft, negotiable U. S. Government Bonds (at par value), or a standard Bid Bond form. The Bid Bond shall be secured by a guarantee or a surety company listed in the latest issue of U. S. Treasury Circular 570. The amount of such Bid Bond shall be within the maximum amount specified for such Company in said Circular 570. No Bid will be considered unless it is accompanied by the required guarantee. Certified Check or Bank Draft must be payable to the County of Butler and/or Owner. Cash deposits will not be accepted. The Bid Guarantee shall insure the execution of the Agreement and the furnishing of the Surety Bond or Bonds by the successful Bidder, all as required by the Contract Documents.

B. A Bid may be withdrawn or modified at any time within PennBid prior to the due date and time identified in the Invitation for Bids.

C. Certified Checks or Bank Drafts, or the amount thereof, Bid Bonds, and negotiable U. S.

Government Bonds of unsuccessful Bidders will be returned as soon as practical after the opening of the Bids.

7. Collusive Agreements

A. Each Bidder submitting a Bid to the County of Butler and/or Owner for any portion of the work contemplated by the documents on which bidding is based shall execute and attach thereto, an affidavit substantially in the form herein provided, to the effect that he has not colluded with any other person, firm, or corporation in regard to any Bid submitted.

B. Before executing any subcontract the successful Bidder shall submit the name of any proposed subcontractor for prior approval and an affidavit substantially in the form provided in Section 103 – Subcontracts.

8. Statement of Bidder’s Qualifications

Each Bidder shall submit on the form furnished for that purpose (a copy of which is included in the Contract Documents), a statement of the Bidder’s qualifications, his experience record in construction, the type of improvements embraced in the Site Preparation, and his organization and equipment available for the work contemplated; and, when specifically requested by the County of Butler and/or Owner, a detailed financial statement. The County of Butler and/or Owner shall have the right to take such steps as it deems necessary to determine the ability of the Bidder to perform his obligations, under the Contract and the Bidder shall furnish the County of Butler and/or Owner all such information and data for this purpose as it may request. The right is reserved to reject any Bid where an investigation of the available evidence or information does not satisfy the County of Butler and/or Owner that the Bidder is qualified to carry out properly the terms of the Contract.

9. Unit Prices (If Applicable)

The unit price for each of the several items in the proposal of each Bidder shall include its prorata share of overhead so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price bid represents the Total Bid. Any Bid not conforming to these requirements may be rejected as informal. The special attention of all Bidders is called to this provision, for should conditions make it necessary to revise the quantities, no limit will be fixed for such increased or decreased quantities no extra compensation allowed, provided the net monetary value of all such additive and subtractive changes in quantities of such items of work (i.e., difference in cost) shall not increase or decrease the original Contract price by more than twenty-five percent (25%), except for work not covered in the Drawings and Technical Specifications as provided for in Section 109 – Changes in the Work.

10. Modifications of Bids

Bid may be withdrawn or modified at any time within PennBid prior to the due date and time identified in the Invitation for Bids.

11. Opening of Bids

After bid opening, the time of which is listed in the Invitation to Bid, a public notice will be issued via PennBid containing any available bid results. It should be noted that bid results are subject to further review and should not be construed as issuance of an award.

12. Withdrawal of Bids

Bids may be withdrawn or modified at any time within PennBid prior to the due date and time identified in the Invitation for Bids. The Bid guarantee of any Bidder withdrawing his Bid in accordance with the foregoing conditions will be returned promptly.

13. Award of Contract – Rejection of Bids

A. The Contract will be awarded to the responsible Bidder submitting the lowest Bid complying with the conditions of the Invitation for Bids. The Bidder to whom the award is made will be notified at the earliest possible date. The County of Butler and/or Owner however, reserves the right to reject any and all Bids and to waive any informality in Bids received whenever such rejection or waiver is in its interest.

B. The County of Butler and/or Owner reserves the right to consider as unqualified to do the work of general construction any Bidder who does not habitually perform with his own forces the major portions of the work involved in construction of the improvements embraced in this Contract.

14. Execution of Agreements – Performance, Payment and Maintenance Bonds

A. Subsequent to the award and within ten (10) days after the prescribed forms are presented for signature, the successful bidder shall execute and deliver to the County of Butler and/or Owner an Agreement in the form included in the Contract Documents in such number of copies as the County of Butler and/or Owner may require.

B. Having satisfied all conditions of award as set forth elsewhere in these documents, the successful Bidder shall, within the period specified in paragraph “A” above, furnish a surety bond in a penal sum not less than the amount of the Contract as awarded, as security for the faithful performance of the Contract, and for the payment of all persons, firms or corporations to whom the Contractor may become legally indebted for labor, materials, tools, equipment, or services of any nature including utility and transportation services, employed; or used by him in performing the work. When the successful Bidder provides the performance and payment bonds specified above, the Bidder shall also furnish a maintenance bond guaranteeing against defective work or materials for a period of 12 months in amount equal to 100% percent of the total price bid. The effective date of the maintenance bond is the date of final acceptable of the work. All bonds shall be in the form as that included in the Contract Documents and shall bear the same date as, or a date subsequent to that of the Agreement. (see pages 93-99) The current power of attorney for the person who signs for any surety company shall be attached to such bonds.

Bonds shall be signed by a guarantee or surety company listed in the latest issue of the U.

S. Treasury Circular 570 and the penal sum shall be within the maximum specified for such company in said Circular 570.

C. The failure of the successful Bidder to execute such Agreement and to supply the required bond or bonds within ten (10) days after the prescribed forms are presented for signature, or within such extended period as the County of Butler and/or Owner may grant, based upon reasons determined sufficient by the County of Butler and/or Owner may either award the Contract to the next lowest responsible Bidder or readvertise for Bids, and may charge against the Bidder the difference between the amount of the Bid and the amount for which a contract for the work is subsequently executed, irrespective of whether the amount thus done exceeds the amount of the Bid Bond. If a more favorable Bid is received by readvertising, the defaulting Bidder shall have no claim against the County of Butler and/or Owner for a refund.

15. Wages and Salaries

A. Attention of Bidders is particularly called to the requirement concerning the payment of not less than the prevailing wage and salary rates specified in the Contract Documents and the conditions of employment with respect to certain categories and classification of employees.

B. The rates of pay set forth under General Conditions, are the minimum to be paid during the life of the Contract. It is therefore, the responsibility of Bidders to inform themselves as to local labor conditions, such as the length of work day and work week, overtime compensation, health and welfare contributions, labor supply and prospective changes or adjustments of rates.

16. Equal Employment Opportunity

Attention of Bidders is particularly called to the requirement for ensuring that employees and applicants for employment are not discriminated against because of their race, sex, color, national origin, or religion. Each Bidder must submit a completed Certification of Bidder Regarding Equal Employment Opportunity.

17. Employment of Lower Income Residents and Business Utilization

Attention of Bidders is particularly called to special requirements regarding employment of lower income residents of, and utilization of businesses in the locality where the work is to be done.

18. Compliance With Federal, State and Local Laws

Attention of Bidders is particularly called to the necessity of complying with all Federal, State and Local laws and regulations including but not limited to the following: Act 247 – 1972; Act 287 – 1974 ; Federal Occupational Safety and Health Act of 1970.

STATEMENT OF BIDDER’S QUALIFICATIONS

All questions must be answered and the date given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires.

1. Name of Bidder

2. Permanent main office address and employer identification number

3. When Organized

4. If a corporation, where incorporated

5. How many years have you been engaged in the contracting business under your present firm or trade name?

6. Contracts on hand: (Schedule these, showing amount of each contract and the appropriate anticipated dates of completion).

7. General character of work performed by your company.

8. Have you ever failed to complete any work awarded to you? If so, where and why?

9. Have you ever defaulted on a contract? If so, where and why?

10. List the more important projects recently completed by your company, stating the approximate cost for each and the month and year completed.

11. List your major equipment available for this contract

12. Experience in construction work similar in importance to this project

13. Background and experience of the principal members of your organization, including the officers.

14. Credit available: $

15. Give bank reference

16. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the

17. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the in verification of the recitals comprising this statement of Bidder’s Qualifications.

18. The undersigned certifies for itself, it has no unsatisfied tax liabilities or other commonwealth obligations.

Dated at this day of , 20 .

By

Title

State of _____________________________)

County of____________________________)

__________________________________ being duly sworn deposes and says that he is

___________________________ of _________________________________ and that the answers to the foregoing questions and all statements therein contained are true and correct.

Subscribed and sworn to before me this

__________ day of _____________, 20_____.

Notary Public

GENERAL SPECIFICATIONS

GENERAL CONDITIONS

PART I

101. DEFINITIONS

Whenever used in any of the Contract Documents, the following meanings shall be given to the terms herein defined:

A. The term “Contract” means the contract executed by the County of Butler, as administering agency and CDBG Grantee; ______________________, as the Owner, and the Contractor, of which these GENERAL CONDITIONS, PARTS I, II, and III, form a part.

B. The term “Administering Agency” means the County of Butler, which is authorized to undertake this contract as CDBG Grantee.

C. The term “Contractor” means the person, firm or corporation entering into the Contract with the County of Butler and the Owner to construct and install the improvements embraced in this Contract.

D. The term “Project Area” means _____________________________________

____________________________________which are the specified Contract limits of the improvements contemplated to be constructed in whole or in part under this Contract.

E. The term “Engineer” means ____________________________________ in charge, serving the County of Butler and/or Owner with Engineering Services, his successor, or any person or persons, employed by said County of Butler and/or Owner for the purpose of directing or having in charge the work of Site Preparation embraced in this Contract, the said Architect acting directly or indirectly through any assistant having immediate charge of a portion thereof limited by the particular duties entrusted to him.

F. The term “Owner” means municipality within whose property the Project Area is situated.

G. The term “Contract Documents” means and shall include the following: Executed Agreement, Addenda (if any), Invitation for Bids, Instructions to Bidders, Signed Copy of Bid, General Conditions, Parts I, II and III, Special Conditions, Technical Specifications, and Drawings (as listed in the Schedule of Drawings).

H. The term “Drawings” means the drawings listed in the Schedule of Drawings.

I. The term “Technical Specifications” means that part of the Contract Documents which describes, outlines and stipulates the quality of the materials to be furnished; the quality of workmanship required; and the methods to be used in carrying out the construction work to be performed under this Contract.

J. The term “Addendum” or Addenda” means any changes, revisions or clarifications of the

Contract Documents which have been duly issued by the County of Butler and/or Owner to prospective Bidders prior to the time of receiving bids.

102. SUPERINTENDENCE BY CONTRACTOR

At the site of the work the Contractor shall provide a superintendent or foreman who shall have full authority to act for the Contractor, except where the Contractor is an individual and gives his personal superintendence to the work. It is understood that such representative shall be acceptable to the Owner. The Contractor shall also provide an adequate staff for the proper coordination and expediting of his work.

103. SUBCONTRACTS

A. The Contractor shall not award any work to any Subcontractor until each has completed and submitted a non-Collusion Affidavit and a Certification by Proposed Subcontractor Regarding Equal Employment Opportunity to the Contractor. It shall also be the responsibility of the Contractor to employ only subcontractors who have certified their eligibility in written contracts containing Federal Labor Standards Provisions.

Subcontractors must submit to County of Butler, and/or Owner a Section 3 Certificate of Compliance, an Affirmative Action Plan and a Section 3 Business Utilization Table.

B. Should any Subcontractor be found ineligible after award of a Contract, its Contract shall be terminated.

C. The Contractor shall be as fully responsible to the County of Butler and/or Owner for the acts and omissions of his subcontractors, and of persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed by him.

D. The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to require compliance by each Subcontractor with the applicable provisions of the Contract for the improvements embraced in the Site Preparation.

E. Nothing contained in the Contract shall create any contractual relation between any

Subcontractor and the County of Butler and/or Owner.

104. SEPARATE CONTRACTS

The County of Butler and/or Owner may award, or may have awarded other contracts for additional work, and the Contractor shall coordinate his operations with those of other

Contractors. The Contractor shall not commit or permit any act which will interfere with the performance of work by any other Contractor as scheduled.

105. FITTING AND COORDINATION OF THE WORK

The Contractor shall be responsible for the proper fitting of all work and for the coordination of the operations of all trades, subcontractors or materialmen engaged upon this Contract. He shall be prepared to guarantee to each of his subcontractors the locations and measurements which they may require for the fitting of their work to all surrounding work.

106. MUTUAL RESPONSIBILITY OF CONTRACTS

If, through acts of neglect on the part of the Contractor, any other Contractor or any Subcontractor shall suffer loss or damage on the work, the Contractor shall settle with such other Contractor or Subcontractor by agreement or arbitration, if such other Contractor or Subcontractor will so settle. If such other Contractor or Subcontractor shall assert any claim against the County of Butler and/or Owner on account of any damage alleged to have been so sustained, the County of Butler and/or Owner will notify this Contractor, who shall defend at his own expense any suit based upon such claim, and, if any judgment or claims against the County of Butler and/or Owner shall be allowed, the Contractor shall pay or satisfy such judgment or claim and pay all costs and expenses in connection therewith.

107. CONSTRUCTION SCHEDULE

A. Immediately after execution and delivery of the Contract, the Contractor shall submit to the County of Butler and/or Owner an estimated construction progress schedule, showing the proposed dates of commencement and completion of each of the various sections of work required under the Contract, the anticipated amount of each monthly payment to become due to the Contractor and the accumulated percent of progress each month.

B. The Contractor shall submit to the County of Butler and/or Owner a breakdown of his estimated cost of all Site Preparation work, so arranged and itemized as to meet the approval of the County of Butler and/or Owner. This breakdown shall be submitted promptly after execution of the agreement and before any payment is made to the Contractor for the work performed under the Contract. After approval by the County of Butler and/or Owner the unit prices established in the breakdown shall be used in estimating the amount of partial payments to be made to the Contractor. (Note: This paragraph B is to be used only with a lump sum Contract.)

108. PAYMENTS TO CONTRACTOR

A. Partial Payments

The Contractor shall prepare his requisition for partial payment at the last day of the month and submit it, with the required number of copies, to the Architect for his approval. The amount of the payment due the Contractor shall be determined by adding to the total value of work completed to date, the value of materials properly stored on the site and deducting (1) 10 percent of the total amount, to be retained until final payment and (2) the amount of all previous payments. If the Contract is for a lump sum, the total value of work completed to date shall be based upon the estimated quantities of work completed to date on each item and the unit prices established in the Cost Breakdown and adjusted in accordance with the value of work completed to date on approved change orders. Payment to Contractor to be made no more than 45 days from receipt by County of requisition for payment approved by Architect.

1. The County of Butler and/or Owner, before paying the final estimate, may require the Contractor to furnish releases or receipts from all Subcontractors having performed any work and all persons having supplied materials, equipment (installed on the Project) and services to the Contractor, if the County of Butler and/or Owner deems the same necessary in order to protect its interest. The County of Butler and/or Owner deems the same necessary in order to protect its interest. The County of Butler and/or Owner, however, may if it deems such action advisable, make payment in part or in full to the Contractor without requiring the furnishing of such releases or receipts and any payments so made shall in no way impair the obligations of any surety or sureties furnished under this Contract.

2. Withholding of any amount due the County of Butler and/or Owner under the

Section entitled “Liquidated Damages” under SPECIAL CONDITIONS, shall be deducted from the final payment due the Contractor.

B. Withholding Payments

The County of Butler and/or Owner may from any payment otherwise due the contractor so much as may be necessary to protect the County of Butler and/or Owner and if it so elects may also withhold any amounts due from the Contractor to any Subcontractors or material dealers, for work performed or material furnished by them. The foregoing provisions shall be construed solely for the benefit of the County of Butler and/or Owner and the benefit of the County of Butler and/or Owner to determine or adjust any claims or disputes between the Contractor and his Subcontractors or material dealers, or to withhold any monies for their protection unless the County of Butler and/or Owner elects to do so. The failure or refusal of the County of Butler and/or Owner to withhold any monies from the Contractor shall in no way impair the obligations of any surety or sureties under any bond or bonds furnished under this Contract.

C. Payments Subject to Submission of Certification

Each payment to the Contractor by the County of Butler and/or Owner shall be made subject to submission by the Contractor of all written certifications required of him and his Subcontractors by the Section entitled “Contractor’s Certification” under GENERAL

CONDITIONS.

109. CHANGES IN THE WORK

A. The County of Butler and/or Owner may make changes in the scope of the work required to be performed by the Contractor under the Contract or making additions thereto, or by omitting work therefrom, without invalidating the Contract, and without relieving or releasing the Contractor from any of his obligations under the Contract or any guarantee given by him pursuant to the Contract provisions, and without affecting the validity of the guarantee bonds, and without relieving or releasing the surety or sureties of said bonds.

All such work shall be executed under the terms of the original Contract unless it is expressly provided otherwise.

B. Except for the purpose of affording protection against any emergency endangering life or property, the Contractor shall make no change in the materials used or in the specified manner of constructing and/or installing the improvements or supply additional labor, services or materials beyond that actually required for the execution of the Contract, unless in pursuance of a written order from the County of Butler and/or Owner authorizing the Contractor to proceed with the change. No claim for an adjustment of the Contract Price, will be valid unless so ordered.

C. If applicable, unit prices are contained in the Agreement (established as a result of either a unit price bid or a Supplemental Schedule of Unit Prices) the County of Butler and/or Owner may order the Contractor to proceed with desired changes in the work, the value of such changes to be determined by the measured quantities involved and the applicable unit prices specified in the Contract; provided that in case of a unit price Contract the net value of all changes does not increase or decrease the original total amount shown in Agreement by more than 25 percent in accordance with the Section entitled “Unit Prices” under INSTRUCTIONS TO BIDDERS.

D. If applicable, unit prices are not contained in the Agreement or if the total net change increases or decreases the total Contract Price more than 25 percent the County of Butler and/or Owner shall, before ordering the Contractor to proceed with desired changes, request an itemized proposal from him covering the work involved in the change after which the procedure shall be as follows:

1. If the proposal is acceptable, the County of Butler and/or Owner will prepare the change order in accordance therewith for acceptance by the Contractor, and;

2. If the proposal is not acceptable and prompt agreement between the two parties cannot be reached, the County of Butler and/or Owner may order the Contractor to proceed with the work on a cost-plus-limited basis. A cost-plus-limited basis is defined as the net cost of the Contractor’s labor, materials and insurance plus 15 percent of said net cost to cover overhead and profit, the total cost not to exceed a specified limit.

E. Each change order shall include in its final form:

1. A detailed description of the change in the work.

2. The Contractor’s proposal (if any) or a conformed copy thereof.

3. A definite statement as to the resulting change in the contract price and/or time.

4. The statement that all work involved in the change shall be performed in accordance with contract requirements except as modified by the change order.

110. CLAIMS FOR EXTRA COST

A. If the Contractor claims that any instructions by drawings or otherwise involve extra cost or extension of time, he shall, within ten days after the receipt of such instructions, and in any event before proceeding to execute the work, submit his protest thereto in writing to the County of Butler and/or Owner stating such claim will be considered unless so made.

B. Claims for additional compensation for extra work, due to alleged errors in ground elevations, contour lines, or bench marks, will not be recognized unless accompanied by certified survey data, made prior to the time the original ground was disturbed, clearly showing that errors exist which resulted, or would result, in handling more material, or performing more work, then would be reasonable estimated from the Drawings and map issued.

C. Any discrepancies which may be discovered between actual conditions and those represented by the Drawings and maps shall at once be reported to the County of Butler and/or Owner and work shall not proceed except at the Contractor’s risk, until written instructions have been received by him from the County of Butler and/or Owner.

D. If, on the basis of the available evidence, the County of Butler and/or Owner determines that an adjustment of the Contract Price and/or time is justifiable, the procedure shall be as provided in the section entitled “Changes in the Work” under GENERAL

CONDITIONS PART I.

111. TERMINATION, DELAYS AND LIQUIDATED DAMAGES

A. Termination of Contract

If the Contractor refuses or fails to prosecute the work with such diligence as will insure its completion within the time specified in these Contract Documents, or as modified as provided in these Contract Documents, the County of Butler and/or Owner, by written notice to the Contractor, may terminate the Contractor’s right to proceed with the work.

Upon such termination, the County of Butler and/or Owner may take over the work and prosecute the same to completion, by Contract or otherwise, and the Contractor and his sureties shall be liable to the County of Butler and/or Owner for liquidated damages for any delay in the completion of the work as provided below. If the Contractor’s right to proceed is so terminated, the County of Butler and/or Owner may take possession of and utilize in completing the work such material, tools, equipment, and plant as may be on the site of the work and necessary therefore.

B. Liquidated Damages for Delays

If the work is not completed within the time stipulated in Part 3 ¶¶ 2 - Time for Completion including any extensions of time for excusable delays as herein provided, the Contractor shall pay to the County of Butler and/or Owner as fixed, agreed, and liquidated damages (it being impossible to determine the actual damages occasioned by the delay) for each calendar day of delay, until the work is completed, the amount as set forth in Part 3 ¶¶2– Liquidated Damages and the Contractor and his sureties shall be liable to the County of Butler and/or Owner for the amount thereof.

C. Excusable Delays

The right of the Contractor to proceed shall not be terminated nor shall the Contractor be charged with liquidated damages for any delays in the completion of the work due:

1. To any acts of the Government, including controls or restrictions upon or requisitioning of materials, equipment, tools, or labor by reason of war, National Defense, or any other national emergency;

2. To any acts of the County of Butler and/or Owner;

3. To causes not reasonably foreseeable by the parties to the Contract at the time of the execution of the Contract which are beyond the control and without the fault or negligence of the Contractor, including, but not restricted to, acts of God or the public enemy, acts of another Contractor in the performance of some other contracts with the County of Butler and/or Owner, fires, floods, epidemics, quarantine, restrictions, strikes, freight embargoes, and weather of unusual severity such as hurricanes, tornadoes, cyclones and other extreme weather conditions; and

4. To any delay of any Subcontractor occasioned by any of the causes specified in subparagraphs 1, 2 and 3 of this paragraph C.

Provided, however, that the Contractor promptly notify the County of Butler and/or Owner within ten days in writing of the cause of the delay. Upon receipt of such notification the County of Butler and/or Owner shall ascertain the facts and the cause and extent of delay. If, upon the basis of the facts and the terms of this Contract, the delay is properly excusable, the County of Butler and/or Owner shall extend the time for completing the work for a period of time commensurate with the period of excusable delay.

112. ASSIGNMENT OR NOVATION

The Contractor shall not assign or transfer, whether by an assignment or novation, any of its rights, duties, benefits, obligations, liabilities, or responsibilities under this Contract without the written consent of the County of Butler and/or Owner; provided, however, that assignments to banks, trust companies, or other financial institutions may be made without the consent of the County of Butler and/or Owner. No assignment or novation of this Contract shall be valid unless the assignment or novation expressly provides that the assignment of any of the Contractor’s rights or benefits under the Contract is subject to a prior lien for labor performed, services rendered, and materials, tools, and equipment supplied for the performance of the work under this Contract in favor of all persons, firms, or corporations rendering such labor or services or supplying such materials, tools, or equipment.

113. DISPUTES

A. All disputes arising under this Contract or its interpretation except those disputes covered by Federal Labor Standards Provisions, GENERAL CONDITIONS, PART II, whether involving law or fact or both, or extra work, and all claims for alleged breach of contract shall within ten days of commencement of the dispute be presented by the Contractor to the County of Butler and/or Owner for decision. All papers pertaining to claims shall be filed in quadruplicate. Such notice need not detail the amount of the claim but shall state the facts surrounding in the claim in sufficient detail to identify the claim, together with its character and scope. In the meantime the Contractor shall proceed with the work as directed. Any claim not presented within the time limit specified this paragraph shall be deemed to have been waived, except that if the claim is of a continuing character and notice of the claim is not given within ten days of its commencement, the claim will be considered only for a period commencing ten days prior to the receipt by the County of Butler and/or Owner of notice thereof.

B. If the Claim is not resolved by negotiation, the Court of Common Pleas of Butler County shall be the exclusive venue and jurisdiction for any litigation claims under this contract.

Contractor to pay Owner’s costs and expenses, to include cost of suit, attorney’s fees, and expert fees, in the vent of a dispute or claim, and in the event the Owner is the prevailing party, or

C. The Contractor shall submit in detail his claim and his proof thereof. Each decision by governing body of the County of Butler and/or Owner will be in writing and will be mailed to the Contractor by registered mail, return receipt requested.

D. If the Contractor does not agree with any decision of the County of Butler and/or Owner, he shall in no case allow the dispute to delay the work but shall notify the County of Butler and/or Owner promptly that he is proceeding with the work under protest and he may then except the matter in question from the final release.

114. TECHNICAL SPECIFICATIONS AND DRAWINGS

Anything mentioned in the Technical Specifications and not shown in the Drawings or shown on the Drawings and not mentioned in the Technical Specifications, shall be of like effect as if shown on or mentioned in both. In case of difference between Drawings and Technical Specification, the Technical Specifications shall govern. In case of any discrepancy in Drawings, or Technical Specifications, the matter shall be immediately submitted to the County of Butler and/or Owner, without whose decision, said discrepancy shall not be adjusted by the Contractor, save only at his own risk and expense.

115. SHOP DRAWINGS

A. All required shop drawings, machinery details, layout drawings, etc., shall be submitted to the Owner in two copies for approval sufficiently in advance of requirements to afford ample time for checking, including time for correcting, resubmitting and re-checking if necessary. The Contractor may proceed, only at his own risk, with manufacture or installation of any equipment or work covered by said shop drawings, etc., until they are approved and no claim, by the Contractor, for extension of the Contract time will be granted by reason of his failure in this respect.

B. Any drawings submitted without the Contractor’s stamp of approval will not be considered and will be returned to him for proper resubmission. If any drawings show variations from the requirements of the Contract because of standard shop practice or other reasons, the Contractor shall make specific mention of such variation in his letter of transmittal in order that, if acceptable, suitable action may be taken for proper adjustment of Contract price and/or time otherwise the Contractor will not be relieved of the responsibility for executing the work in accordance with the Contract even though the drawings have been approved.

C. If a shop drawing is in accord with the Contract or involved only a minor adjustment in the interest of the County of Butler and/or Owner not involving a change in Contract price or time, the Owner may approve the drawing. The approval shall be general, shall not relieve the Contractor, from his responsibility for adherence to the Contract or for any error in the drawing and shall contain in substance the following:

“The modification shown on the attached drawing is approved in the interest of the County of Butler and/or Owner to effect an improvement for the Project and is ordered with the understanding that it does not involve any change in the Contract Price or time; that it is subject generally to all Contract Stipulation and covenants; and that it is without prejudice to any and all rights of the County of Butler and/or Owner under the Contract and surety bond or bonds.”

116. REQUESTS FOR SUPPLEMENTARY INFORMATION

It shall be the responsibility of the Contractor to make timely requests of the County of Butler and/or Owner for any additional information not already in his possession which should be furnished by the County of Butler and/or Owner under the terms of this Contract, and which he will require in the planning and execution of the work. Such requests may be submitted from time to time as the need is approached, but each shall be filed in ample time to permit appropriate action to be taken by all parties involved so as to avoid delay. Each request shall be in writing, and list the various items and the latest date by which each will be required by the Contract award and shall be as complete as possible at that time. The Contractor shall, if requested, furnish promptly any assistance and information the Owner may require in responding to these requests of the Contractor. The Contractor shall be fully responsible for any delay in his work or to others arising from his failure to comply fully with the provisions of this Section.

117. MATERIALS AND WORKMANSHIP

A. Unless otherwise specifically provided for in the Technical Specifications, all workmanship, equipment, materials and articles incorporated in the work shall be new and the grade of the respective kinds for the purpose. Where equipment, materials, articles or workmanship are referred in the Technical Specifications as “equal to” any particular standard, the Owner shall decide the question of equality.

B. The Contractor shall furnish to the County of Butler and/or Owner for approval the manufacturer’s detailed specifications for all machinery, mechanical and other special equipment, which he contemplates installing together with full information as to type, performance characteristics, and all other pertinent information as required, and shall likewise submit for approval as required full information concerning all other materials or articles which he proposes to incorporate in the work. (See Section “Samples, Certificates and Tests” under GENERAL CONDITIONS, PART I).

C. Machinery, mechanical and other equipment, materials or articles installed or used without such prior approval shall be at the risk of subsequent rejection.

D. Materials specified by reference to the number or symbol of specific standard, such as an A.S.T.M. Standard, a Federal Specification or other similar standard, shall comply with requirements in the latest revision thereof and any amendment or supplement thereto in effect on the date of the Invitation for Bids, except as limited to type, class or grade, or modified in such reference. The standards referred to, except as modified in the Technical Specifications shall have full force and effect as though printed therein.

E. The County of Butler and/or Owner may require the Contractor to dismiss from the work such employee or employees as the County of Butler and/or Owner may deem incompetent, or careless, or insubordinate.

118. SAMPLE, CERTIFICATES AND TESTS (If Applicable)

A. The Contractor shall submit all material or equipment samples, certificates, affidavits, etc., as called for in the Contract Documents or required by the Owner, promptly after award of the Contract and acceptance of the Contractor's bond. No such material or equipment shall be manufactured or delivered to the site, except at the Contractor’s own risk, until the required sampled or certificates have been approved in writing by the Owner. Any delay in the work caused by late or improper submission of samples or certificates of approval shall not be considered just cause for an extension of the Contract time.

Each sample submitted by the Contractor shall carry a label giving the name of the Contractor, the project for which it is intended, and the name of the producer. The accompanying certificate or letter from the Contractor shall state that the sample complies with Contract requirements, the name and brand of the product, its place of origin, the name and address of the producer and all specifications or other detailed information which will assist the Owner in passing upon the acceptability of the sample promptly. It shall also include the statement that all materials or equipment furnished for use in the project will comply with the samples and/or certified statements.

B. Approval of any materials shall be general only and shall not constitute a waiver of the

County of Butler and/or Owner right to demand full compliance with, Contract requirements. After actual deliveries, the Architect will have such check tests made as he deems necessary in each instance and may reject materials and equipment and accessories for cause, even though such materials and articles have been given general approval. If materials, equipment or accessories which fail to meet check tests have been incorporated in the work, the Owner will have the right to cause their removal and replacement by proper materials or to demand and secure such reparation by the Contractor as is equitable.

C. Except as otherwise specifically stated in the Contract, the costs of sampling and testing will be divided as follows:

1. The Contractor shall furnish without extra cost, including packing and delivery charges, all samples required for testing purposes, except those samples taken on the project by the Owner.

2. The Contractor shall assume all costs of re-testing materials which fail to meet contract requirements.

3. The Contractor shall assume all costs of testing materials offered in substitution for those found deficient.

4. The County of Butler and/or Owner will pay all other expenses.

119. PERMITS AND CODES

A. The Contractor shall give all notices required by and comply with all applicable law, ordinances, and codes of the Local Government. All construction work and/or utility installations shall comply with all applicable ordinances, and codes including all written waivers. Before installing any work, the Contractor shall examine the Drawings and Technical Specifications for compliance with applicable ordinances and codes and shall immediately report any discrepancy to the County of Butler and/or Owner. Where the requirements of the Drawings and Technical Specifications fail to comply with such applicable ordinances or codes, the County of Butler and or Owner will adjust the Contract by change Order to conform to such ordinances or codes (unless waivers in writing covering the difference have been granted by the governing body or department) and make appropriate adjustment in the Contract Price or stipulated unit prices.

Should the Contractor fail to observe the foregoing provisions and proceed with the construction and/or install any utility at variance with any applicable ordinance or code, including any written waiver (notwithstanding the fact that such installation is in compliance with the Drawings and Technical Specifications), the Contractor shall remove such work without cost to the County of Butler and/or Owner, but a Change Order will be issued to cover only the excess cost the Contractor would have been entitled to receive if the change had been made before the Contractor commenced work on the items involved.

B. The Contractor shall, at his own expense, secure and pay to the appropriate department of the Local Government the fees or charges for all permits for street pavement, sidewalks, sheds, removal of abandoned water taps, sealing of house connection drains, pavements cuts, buildings, electrical, plumbing, water, gas and sewer permits required by the local regulatory body or any of its agencies.

C. The Contractor shall comply with applicable local laws and ordinances governing the disposal of surplus excavation, materials debris and rubbish on or off the Project Area and commit no trespass on any public or private property in any operation due to or connected with the improvements embraced in this Contract.

120. CARE OF WORK

A. The Contractor shall be responsible for all damages to person or property that occur as a result of his default or negligence in connection with the prosecution of the work and shall be responsible for the proper care and protection of all materials delivered and work performed until completion and final acceptance, whether or not the same has been covered in whole or in part by payments made by the County of Butler and/or Owner.

B. The Contractor shall provide sufficient competent…