Statement of Work (SOW) AWNING.docx
DOCX document 49 KB Posted
- Solicitation number
- 13943RFQ250000016
About this file
This Statement of Work (SOW) details the replacement of awning fabric for the USCGC FREDERICK HATCH (WPC 1143), a United States Coast Guard cutter located in Honolulu, Hawaii. The contract will be a sole-source award to Pipe Dreams Marine, LLC, with a performance period not exceeding October 3, 2025. The primary work location will be the Marisco Shipyard in Kapolei, HI, with the contractor required to replace the awning fabric according to Technical Publication 8206 for 154' WPC Class Cutters.
Key requirements include providing qualified personnel, maintaining a project manager available between 0600-2200 EST, complying with DHS facility and security regulations, and submitting daily progress reports. The contractor must attend a post-award conference within one business day of the award, provide a draft and final project plan, and be prepared to potentially obtain Secret clearance for personnel. While no classified information is currently required, the government reserves the right to require Secret clearances in the future. Interested parties can submit a capability statement by August 4, 2025, to the designated Coast Guard contact.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR #:
STATEMENT OF WORK
STATEMENT OF WORK (SOW)
FOR
AWNING FABRIC REPLACEMENT, CGC FREDERICK HATCH WPC 1143.
<Contracting Officer enter final date solicitation is released>
1.0 GENERAL
1.1 BACKGROUND
Complete awning fabric replacement onboard CGC FREDERICK HATCH WPC 1143 in Honolulu, HI as per TECHNICAL PUBLICATION 8206 AWNING REMOVAL AND MAINTENANCE GUIDE 154’ WPC CLASS CUTTERS.
1.2 SCOPE
Complete awning fabric replacement onboard CGC FREDERICK HATCH WPC 1143 in Honolulu, HI as per TECHNICAL PUBLICATION 8206 AWNING REMOVAL AND MAINTENANCE GUIDE 154’ WPC CLASS CUTTERS.
1.3 OBJECTIVE
Complete awning fabric replacement onboard CGC FREDERICK HATCH WPC 1143 in Honolulu, HI as per TECHNICAL PUBLICATION 8206 AWNING REMOVAL AND MAINTENANCE GUIDE 154’ WPC CLASS CUTTERS.
1.4 APPLICABLE DOCUMENTS
TECHNICAL PUBLICATION 8206 AWNING REMOVAL AND MAINTENANCE GUIDE 154’ WPC CLASS CUTTERS.
1.4.1 Compliance Documents
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
All applicable references contained in TECHNICAL PUBLICATION 8206 AWNING REMOVAL AND MAINTENANCE GUIDE 154’ WPC CLASS CUTTERS.
1.4.2 Reference Documents
The following documents may be helpful to the Contractor in performing the work described in this document:
TECHNICAL PUBLICATION 8206 AWNING REMOVAL AND MAINTENANCE GUIDE 154’ WPC CLASS CUTTERS.
2.0 SPECIFIC REQUIREMENTS/TASKS
Replace awning fabric per TechPub.
2.1 TASK ONE. Replace Awning fabric per TechPub.
3.0 CONTRACTOR PERSONNEL
All personnel will be fully qualified and capable to perform the scope of work.
3.1 QUALIFIED PERSONNEL
The Contractor must provide qualified personnel to perform all requirements specified in this SOW.
3.2 CONTINUITY OF SUPPORT
The Contractor must ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor must ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor must provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor must provide a fully qualified replacement.
3.3 KEY PERSONNEL
Before replacing any individual designated as Key by the Government, the Contractor must notify the Contracting Officer no less than 15 business days in advance, submit written justification for replacement, and provide the name and qualifications of any proposed substitute(s). All proposed substitutes must possess qualifications equal to or superior to those of the Key person being replaced, unless otherwise approved by the Contracting Officer. The Contractor must not replace Key Contractor personnel without approval from the Contracting Officer. The following Contractor personnel are designated as Key for this requirement. Note: The Government may designate additional Contractor personnel as Key at the time of award.
3.3.1 Contractor Key personnel must not be assigned by the Contractor to more than one key position for this requirement.
3.4 PROJECT MANAGER
The Contractor must provide a Project Manager who must be responsible for all Contractor work performed under this SOW. The Project Manager must be a single point of contact for the Contracting Officer and the COR. The name of the Project Manager, and the name(s) of any alternate(s) who must act for the Contractor in the absence of the Project Manager, must be provided to the Government as part of the Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate must have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates must be able to read, write, speak and understand English. Additionally, the Contractor must not replace the Project Manager without prior approval from the Contracting Officer.
3.4.1 The Project Manager must be available to the COR via telephone between the hours of 0600 and 2200 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 02 hours of notification.
3.5 EMPLOYEE IDENTIFICATION
3.5.1 Contractor employees visiting Government facilities must wear an identification badge that, at a minimum, displays the Contractor name, the employee’s photo, name, clearance-level and badge expiration date. Visiting Contractor employees must comply with all Government escort rules and requirements. All Contractor employees must identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.
3.5.2 Contractor employees working on-site at Government facilities must wear a Government issued identification badge. All Contractor employees must identify themselves as Contractors when their status is not readily apparent (in meetings, when answering Government telephones, in e-mail messages, etc.) and display the Government issued badge in plain view above the waist at all times.
3.6 EMPLOYEE CONDUCT
Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.
3.7 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
4.0 OTHER APPLICABLE CONDITIONS
4.1 SECURITY
Security Risk and Background Investigation Form Requirements
The requirements office anticipates the following:
Contractor access to classified information is not currently required under this SOW. However, the Government at a later date may require all Contractor personnel to have Secret clearances. Accordingly, all Contractor employees provided for this requirement must be eligible for a Secret Clearance.
4.2 PERIOD OF PERFORMANCE
The period of performance for this contract must not exceed October 03 2025
4.3 PLACE OF PERFORMANCE
The primary place of performance will be the Contractor’s facilities with frequent visits to the United States Coast Guard at MARISCO SHIPYARD, 91-607 Malakole st, Kapolei, HI, 96707.
4.4 HOURS OF OPERATION
Contractor employees must generally perform all work between the hours of 0600 and 1800 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.
4.5 TRAVEL
Contractor travel must be required to support this requirement. All travel required by the Government outside the local commuting area(s) will be reimbursed to the Contractor in accordance with FAR 31.205-46, Travel Costs. The Contractor must be responsible for obtaining COR approval (electronic mail is acceptable) for all reimbursable travel in advance of each travel event.
4.6 POST AWARD CONFERENCE
The Contractor must attend a Post Award Conference with the Contracting Officer and the COR no later than 1 business days after the date of award. The purpose of the Post Award Conference, which will be chaired by the Contracting Officer, is to discuss technical and contracting objectives of this contract and review the Contractor's draft project plan. The Post Award Conference will be held at the Government’s facility, via teleconference.
4.7 PROJECT PLAN
The Contractor must provide a draft Project Plan at the Post Award Conference for Government review and comment. The plan, at a minimum, must include: (a) list of work to be performed;(b) project schedule; (c) description of intended results; (d) role of key personnel, if applicable and (e) how quality of service (project) will be maintained throughout life of contract. The Contractor must provide a final Project Plan to the COR not later than 1 business days after the Post Award Conference.
4.8 BUSINESS CONTINUITY PLAN
N/A
4.9 PROGRESS REPORTS
The Project Manager must provide a daily progress report to the Contracting Officer and COR via electronic mail. This report must include a summary of all Contractor work performed, including a breakdown of labor hours by labor category, all direct costs by line item, an assessment of technical progress, schedule status, any travel conducted and any Contractor concerns or recommendations for the previous reporting period.
4.10 PROGRESS MEETINGS
The Project Manager must be responsible for keeping the COR informed about Contractor progress throughout the performance period of this contract, and ensure Contractor activities are aligned with DHS objectives. At a minimum, the Project Manager must review the status and results of Contractor performance with the COR on a daily basis.
4.11 GENERAL REPORT REQUIREMENTS
The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).
4.12 INTELLECTUAL PROPERTY
N/A
4.13 PROTECTION OF INFORMATION
Contractor access to information protected under the Privacy Act is required under this SOW. Contractor employees must safeguard this information against unauthorized disclosure or dissemination in accordance with the law and Government policy and regulation.
4.14 SECTION 508 COMPLIANCE
N/A
5.0 GOVERNMENT FURNISHED RESOURCES
The Government will not furnish any resources to the Contractor in support of this contract.
The Contractor must use Government furnished facilities, property, equipment and supplies only for the performance of work under this contract, and must be responsible for returning all Government furnished facilities, property, and equipment in good working condition, subject to normal wear and tear.
The Government will provide all necessary information, data and documents to the Contractor for work required under this contract.
The Government will provide copies of the references cited in SOW 1.4 at the Post Award Conference.
The Contractor must use Government furnished information, data and documents only for the performance of work under this contract, and must be responsible for returning all Government furnished information, data and documents to the Government at the end of the performance period. The Contractor must not release Government furnished information, data and documents to outside parties without the prior and explicit consent of the Contracting Officer.
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in SOW 2.0 and SOW 5.0.
7.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
8.0 DELIVERABLES
The Contractor must consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed and/or approved by the COR prior to proceeding to next deliverable or event in this SOW.
| ITEM |
| SOW REFERENCE |
| DELIVERABLE / EVENT |
| DUE BY |
DISTRIBUTION
| Xxxxx |
| Xxxxx |
| Xxxx |
| Xxxxx |
| Xxxxx |
| Xxxx |
LAST UPDATED: 07/29/2025 PAGE 8/17