136825_-_Project_Manual_Book_I_of_V.pdf
PDF 40 MB Posted
- Solicitation number
- 0000033165
- Issued by
- Del Norte County, California
About this file
This document is a Project Manual for a state-funded construction project. The project is being administered by the State Department of Transportation and is for the replacement of a bridge over a major river. The scope of work includes demolition of the existing bridge, construction of a new two-lane concrete bridge, and associated roadway improvements. The project is estimated to require 18 months to complete.
The bid due date is January 30, 2023, with a mandatory pre-bid conference scheduled for January 10, 2023. The contract will be awarded to the lowest responsive and responsible bidder, and the term of the agreement is 24 months with two one-year renewal options. The project budget is $25 million, with funding provided through state transportation funds. There are no set-aside requirements, and the current bridge maintenance is performed by the state.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA DEPARTMENT OF GENERAL SERVICES
REAL ESTATE SERVICES DIVISION
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
PROJECT MANUAL – Book I of V
BOOK I : INTRODUCTORY INFORMATION
BIDDING REQUIREMENTS
BOOK II : CONTRACTING REQUIREMENTS – ALDER CAMP
BOOK III: CONTRACTING REQUIREMENTS – BIG LAGOON
BOOK IV: CONTRACTING REQUIREMENTS – RATTLESNAKE PEAK
BOOK V : APPENDICIES
FOR:
RELOCATION OF RED MOUNTAIN
COMMUNICATIONS SITE
STATE OF CALIFORNIA GOVERNOR’S
OFFICE OF EMERGENCY SERVICES
DEL NORTE AND HUMBOLDT COUNTY, CALIFORNIA
Brad Tress, Project Director Telephone Number: (916) 217-6500 West Sacramento, California
Consultant: Stantec Consulting, Inc.
AUGUST 2024 DGS000000136825
PROJECT TITLE PAGE
RESDMSTR: 02/03/2014v1 00 01 01 - 1 DGS000000136825
DOCUMENT 00 01 01
PROJECT TITLE PAGE
Title : RELOCATION OF RED MOUNTAIN
COMMUNICATIONS SITE
Location : Del Norte and Humboldt County, California
Client Agency : State of California Governor’s Office of Emergency Services
Project Locations :
DSA #: 01-119051 : ALDER CONSERVATION CAMP
SFM #: 20-1472 (Coordinates: 41°29'56.58"N, 124° 3'36.30"W) Del Norte County, California
DSA #: 01-119052 : BIG LAGOON
SFM #: 20-1474 (Coordinates: 41°10'15.81"N, 124° 3'44.81"W) Humboldt County, California
DSA #: 01-119053 : RATTLESNAKE PEAK
SFM #: 20-1476 (Coordinates: 41°37'24.50"N, 123°56'58.50"W) Del Norte County, California
Project Number : DGS000000136825
Project Director : Brad Tress, PD State of California Department of General Services Real Estate Services Division Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: (916) 217-6500 Email: brad.tress@dgs.ca.gov
Consultant : Stantec, Inc.
Kevin Kinoshita, P.E.
Telephone Number: (916) 669-5991 Email: Kevin.Kinoshita@stantec.com
CERTIFICATIONS PAGE
RESDMSTR: 02/03/2014v1 00 01 05 - 1 DGS000000136825
DOCUMENT 00 01 05
PROJECT TITLE : RELOCATION OF RED MOUNTAIN
COMMUNICATIONS SITE
LOCATION : DEL NORTE and HUMBOLDT COUNTY, CALIFORNIA
CLIENT AGENCY : State of California Governor’s Office of Emergency Services
PROJECT LOCATION :
DSA #: 01-119051 : ALDER CONSERVATION CAMP
SFM #: 20-1472 (Coordinates: 41°29'56.58"N, 124° 3'36.30"W) Del Norte County, California
DSA #: 01-119052 : BIG LAGOON
SFM #: 20-1474 (Coordinates: 41°10'15.81"N, 124° 3'44.81"W) Humboldt County, California
DSA #: 01-119053 : RATTLESNAKE PEAK
PROJECT NUMBER : DGS000000136825
OWNER : STATE OF CALIFORNIA
PROJECT DIRECTOR : Brad Tress, Project Director Department of General Services Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: (916) 217-6500 Email: Brad.Tress@dgs.ca.gov
CONSULTANT : Stantec, Inc.
Kevin Kinoshita, P.E.
Telephone Number: (916) 669-5991 Email: Kevin.Kinoshita@stantec.com
RESDMSTR: 02/03/2014v1 00 01 05 - 2 DGS000000136825
RESDMSTR: 02/03/2014v1 00 01 05 - 3 DGS000000136825
PROJECT TITLE : RELOCATION OF RED MOUNTAIN
COMMUNICATIONS SITE
LOCATION : Del Norte and Humboldt County, California
CLIENT AGENCY : State of California Governor’s Office of Emergency Services
PROJECT LOCATION :
DSA #: 01-119051 : ALDER CONSERVATION CAMP
SFM #: 20-1472 (Coordinates: 41°29'56.58"N, 124° 3'36.30"W) Del Norte County, California
DSA #: 01-119052 : BIG LAGOON
SFM #: 20-1474 (Coordinates: 41°10'15.81"N, 124° 3'44.81"W) Humboldt County, California
DSA #: 01-119053 : RATTLESNAKE PEAK
PROJECT NUMBER : DGS000000136825
REGULATORY REVIEWS:
STATE FIRE MARSHAL
ACCESS COMPLIANCE / STRUCTURAL SAFETY
TABLE OF CONTENTS 00
01 10 - 1 July 3, 2020 DGS000000136825
DOCUMENT 00 01 10
TABLE OF CONTENTS
BOOK I
INTRODUCTORY INFORMATION
Pages
Document 00 01 01 Project Title Page .............................................................................. 1 only 1 00 01 05 Certifications Page ............................................................................ 1 through 9 00 01 10 Table of Contents .............................................................................. 1 through 6 00 01 15 List of Drawings ................................................................................. 1 through 10
BIDDING REQUIREMENTS
Document 00 11 00 Invitation to Bid .................................................................................. 1 through 4 00 21 00 Instructions to Bidders ....................................................................... 1 through 10 Appendix 00 21 00.1, Request for Bidding Interpretation ................... 1 only 00 22 00 Supplementary Instructions to Bidders ............................................. 1 only 00 22 10 DVBE Participation Program Requirements ...................................... 1 through 3 00 41 00 Bid Form (Sample) ............................................................................ 1 through 13 00 43 13 Bidder’s Bond (Sample) ..................................................................... 1 only 00 43 16 Certified Small Business Subcontractor(s) Summary (Sample) ......... 1 through 3 00 45 46 Payee Data Record ........................................................................... 1 through 2
CONTRACTING REQUIREMENTS
Document 00 52 00 Agreement (Sample) ......................................................................... 1 only 00 61 13 Performance Bond (Sample) ............................................................. 1 only 00 61 14 Payment Bond (Sample) .................................................................... 1 only 00 63 63 Construction Contract Change Order (Sample) ................................. 1 only 00 72 00 General Conditions of the Contract for Construction .......................... 1 through 35 00 73 00 Supplementary Conditions ................................................................. 1 through 12
SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 11 00 Summary ........................................................................................... 1 through 5 01 31 00 Project Management and Coordination .............................................. 1 through 2 01 31 25 FL Web-Based Project Management System……………………………1 through 4 01 32 16 Progress Schedules and Reports ..................................................... 1 through 6 01 32 33 Construction Photographs ................................................................. 1 through 2 01 33 00 Submittal Procedures ........................................................................ 1 through 7 01 33 29.08 Buy Clean California Report…………………………………………….1 only 01 35 16 Alteration Project Procedures ............................................................ 1 through 3 01 35 57 Essential Services Project Procedures .............................................. 1 through 3 01 35 58 Conservation Camp Security Procedures .......................................... 1 through 3 01 40 00 Quality Requirements ........................................................................ 1 through 6 01 41 00 Regulatory Requirements…………………………………………………1 through 4 01 45 29 Testing Laboratory Services ............................................................. 1 through 3 01 51 00 Temporary Facilities and Controls ..................................................... 1 through 8 01 60 00 Product Requirements ....................................................................... 1 through 2 01 64 00 Owner-furnished Equipment .............................................................. 1 through 2
01 10 - 2 July 3, 2020 DGS000000136825
01 73 29 Cutting and Patching ......................................................................... 1 through 2 01 74 19 Construction Waste Management ...................................................... 1 through 3 Appendix 01 74 19.1, Construction Waste Estimate .......................... 1 only Appendix 01 74 19.2, Waste Management Report ............................. 1 through 2 01 74 20 Recycled Content Certification……………………………………………1 through 2 Appendix 01 74 20.1, Ex. Recycled Content Certification Worksheet 1 through 3 Appendix 01 74 20.2, Example SABRC Procurement Summary…… 1 through 2 01 74 23 Cleaning ............................................................................................ 1 through 2 01 75 00 Starting and Adjusting........................................................................ 1 through 2 01 77 00 Closeout Procedures ......................................................................... 1 through 5 Appendix 01 77 00, A-1, Contractors Certification of DVBE/SB ................. Participation ....................................................................................... 1 only ................. Appendix 01 77 00, A-2, Contractor’s Certification of DVBE/SB .. Participation, Preliminary & Final Report ............................................ 1 only 01 79 00 Demonstration and Training............................................................... 1 through 2 01 86 19 Testing, Adjusting and Balancing Procedures ................................... 1 through 2
BOOK II- ALDER CAMP
Pages
DIVISION 02 – EXISTING CONDITIONS
Section 02 20 00 Site Preparation (Clearing and Grubbing) ........................................ 1 through 3 02 22 23 Chain Link Fence ............................................................................ 1 through 4 02 25 00 Gravel Surfacing.............................................................................. 1 through 4 02 26 00 Aggregate Base............................................................................... 1 through 4 02 40 00 Demolition ....................................................................................... 1 through 6 02 41 00 Blasting ........................................................................................... 1 through 4 02 41 13 Concrete Matt and Pad Foundations ............................................... 1 through 2 02 41 16 Groundwork for Structures ............................................................... 1 through 7 02 42 00 Rock Removal ................................................................................. 1 through 4
DIVISION 03 - CONCRETE
Section 03 01 00 Concrete Formwork ......................................................................... 1 through 4 03 20 00 Concrete Reinforcement ................................................................. 1 through 2 03 30 00 Cast-In-Place Concrete .................................................................. 1 through 4 03 31 19 Expansion and Contraction Joints................................................... 1 through 2 03 37 00 Precast Concrete Specialties .......................................................... 1 through 3
DIVISION 04 – MASONRY (NOT REVIEWED BY DSA)
Section 04 22 00 Concrete Unit Masonry ................................................................... 1 through 4
DIVISION 05 - METALS
Section 05 01 30 Metal Decking .................................................................................1 through 3 05 03 31 Welding ...........................................................................................1 through 9 05 12 00 Structural Steel ............................................................................... 1 through 2 05 50 00 Metal Fabrications .......................................................................... 1 through 11 05 51 40 Ladders ...........................................................................................1 through 3
DIVISION 06 - WOOD, PLASTICS AND COMPOSITES
01 10 - 3 July 3, 2020 DGS000000136825
Section 06 10 00 Rough Carpentry ............................................................................. 1 through 2
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
Section 07 92 00 Sealants ......................................................................................... 1 through 4
DIVISION 08 - OPENINGS
Section 08 12 13 Hollow Metal Frames ....................................................................... 1 through 2 08 13 13 Hollow Metal Doors ......................................................................... 1 through 2 08 71 00 Door Hardware ................................................................................ 1 through 2 08 90 00 Louvers and Vents .......................................................................... 1 through 6
BOOK III- BIG LAGOON
DIVISION 02 – EXISTING CONDITIONS
Section 02 20 00 Site Preparation (Clearing and Grubbing) ........................................ 1 through 3 02 22 23 Chain Link Fence ............................................................................ 1 through 4 02 25 00 Gravel Surfacing.............................................................................. 1 through 4 02 26 00 Aggregate Base............................................................................... 1 through 4 02 40 00 Demolition ....................................................................................... 1 through 6 02 41 00 Blasting ........................................................................................... 1 through 4 02 41 13 Concrete Matt and Pad Foundations ............................................... 1 through 2 02 41 16 Groundwork for Structures ............................................................... 1 through 7 02 42 00 Rock Removal ................................................................................. 1 through 4
DIVISION 03 - CONCRETE
Section 03 01 00 Concrete Formwork ......................................................................... 1 through 4 03 20 00 Concrete Reinforcement ................................................................. 1 through 2 03 30 00 Cast-In-Place Concrete .................................................................. 1 through 4 03 31 19 Expansion and Contraction Joints................................................... 1 through 2 03 37 00 Precast Concrete Specialties .......................................................... 1 through 3
Section 04 22 00 Concrete Unit Masonry ................................................................... 1 through 4
DIVISION 05 - METALS
Section 05 01 30 Metal Decking .................................................................................1 through 3 05 03 31 Welding ...........................................................................................1 through 9 05 12 00 Structural Steel ............................................................................... 1 through 2 05 50 00 Metal Fabrications .......................................................................... 1 through 11 05 51 40 Ladders ...........................................................................................1 through 3
DIVISION 06 - WOOD, PLASTICS AND COMPOSITES
Section 06 10 00 Rough Carpentry ............................................................................. 1 through 2
01 10 - 4 July 3, 2020 DGS000000136825
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
Section 07 92 00 Sealants ......................................................................................... 1 through 4
DIVISION 08 - OPENINGS
Section 08 12 13 Hollow Metal Frames ....................................................................... 1 through 2 08 13 13 Hollow Metal Doors ......................................................................... 1 through 2 08 71 00 Door Hardware ................................................................................ 1 through 2 08 90 00 Louvers and Vents .......................................................................... 1 through 6
DIVISION 09 - FINISHES
Section 09 22 16 Non-Structural Metal Framing .......................................................... 1 through 4 09 29 00 Gypsum Board ................................................................................ 1 through 2 09 90 00 Painting ........................................................................................... 1 through 9
DIVISION 13 - SPECIAL CONSTRUCTION
Section 13 36 13.13 Self-Supporting Steel Communications Tower .................................1 through 7 Section 13 40 00 Antennas .........................................................................................1 through 3
DIVISION 22 - PLUMBING
Section 22 05 00 General Requirements for Mechanical Work ....................................1 through 12 22 08 00 Ventilation and Exhaust ................................................................... 1 through 10 22 10 00 Plumbing ......................................................................................... 1 through 13
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
Section 23 08 00 Heating, Ventilating and Air Conditioning .........................................1 through 14
DIVISION 26 - ELECTRICAL
Section 26 05 00 General Electrical Requirements ..................................................... 1 through 8 26 05 10 Electrical Tests ................................................................................ 1 through 8 26 05 14 Wires and Cables ............................................................................ 1 through 4 26 05 26 Grounding ....................................................................................... 1 through 3 26 05 33 Raceways, Boxes and Fittings .........................................................1 through 11 26 05 48 Seismic restraint and Certification for electrical Equipment ............. 1 through 4 26 27 26 Switches, Receptacles and Outlets .................................................1 through 2 26 28 16 Miscellaneous electrical Devices .....................................................1 through 2 26 32 13 Standby Engine-Generators ............................................................1 through 21 26 36 23 Automatic Transfer Switches ...........................................................1 through 4 26 95 00 Control Panels ................................................................................. 1 through 5
DIVISION 31 - EARTHWORK
Section 31 25 00 Stormwater Pollution Prevention Plan ............................................. 1 through 4
BOOK IV- RATTLESNAKE PEAK
01 10 - 5 July 3, 2020 DGS000000136825
DIVISION 02 – EXISTING CONDITIONS
Section 02 20 00 Site Preparation (Clearing and Grubbing) ........................................ 1 through 3 02 22 23 Chain Link Fence ............................................................................ 1 through 4 02 25 00 Gravel Surfacing.............................................................................. 1 through 4 02 26 00 Aggregate Base............................................................................... 1 through 4 02 40 00 Demolition ....................................................................................... 1 through 6 02 41 00 Blasting ........................................................................................... 1 through 4 02 41 13 Concrete Matt and Pad Foundations ............................................... 1 through 2 02 41 16 Groundwork for Structures ............................................................... 1 through 7 02 42 00 Rock Removal ................................................................................. 1 through 4
DIVISION 03 - CONCRETE
Section 03 01 00 Concrete Formwork ......................................................................... 1 through 4 03 20 00 Concrete Reinforcement ................................................................. 1 through 2 03 30 00 Cast-In-Place Concrete .................................................................. 1 through 4 03 31 19 Expansion and Contraction Joints................................................... 1 through 2 03 37 00 Precast Concrete Specialties .......................................................... 1 through 3
Section 04 22 00 Concrete Unit Masonry ................................................................... 1 through 4
DIVISION 05 - METALS
Section 05 01 30 Metal Decking .................................................................................1 through 3 05 03 31 Welding ...........................................................................................1 through 9 05 12 00 Structural Steel ............................................................................... 1 through 2 05 50 00 Metal Fabrications .......................................................................... 1 through 11 05 51 40 Ladders ...........................................................................................1 through 3
DIVISION 06 - WOOD, PLASTICS AND COMPOSITES
Section 06 10 00 Rough Carpentry ............................................................................. 1 through 2
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
Section 07 92 00 Sealants ......................................................................................... 1 through 4
DIVISION 08 - OPENINGS
Section 08 12 13 Hollow Metal Frames ....................................................................... 1 through 2 08 13 13 Hollow Metal Doors ......................................................................... 1 through 2 08 71 00 Door Hardware ................................................................................ 1 through 2 08 90 00 Louvers and Vents .......................................................................... 1 through 6
DIVISION 09 - FINISHES
Section 09 22 16 Non-Structural Metal Framing ......................................................... 1 through 4 09 29 00 Gypsum Board ............................................................................... 1 through 2 09 90 00 Painting .......................................................................................... 1 through 9
TABLE OF CONTENTS
RESDMSTR: REV. 5.3.2019 00 01 10 - 6 DGS000000136825
DIVISION 13 - SPECIAL CONSTRUCTION
Section 13 36 13.13 Self-Supporting Steel Communications Tower ................................ 1 through 7 Section 13 40 00 Antennas ........................................................................................ 1 through 3
DIVISION 22 - PLUMBING
Section 22 05 00 General Requirements for Mechanical Work ................................... 1 through 12 22 08 00 Ventilation and Exhaust .................................................................. 1 through 10 22 10 00 Plumbing ........................................................................................ 1 through 13
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
Section 23 08 00 Heating, Ventilating and Air Conditioning ........................................ 1 through 14
DIVISION 26 - ELECTRICAL
Section 26 05 00 General Electrical Requirements ..................................................... 1 through 8 26 05 10 Electrical Tests ............................................................................... 1 through 8 26 05 14 Wires and Cables ........................................................................... 1 through 4 26 05 26 Grounding ....................................................................................... 1 through 3 26 05 33 Raceways, Boxes and Fittings ........................................................ 1 through 11 26 05 48 Seismic restraint and Certification for electrical Equipment ............. 1 through 4 26 27 26 Switches, Receptacles and Outlets ................................................. 1 through 2 26 28 16 Miscellaneous electrical Devices ..................................................... 1 through 2 26 32 13 Standby Engine-Generators ............................................................ 1 through 21 26 36 23 Automatic Transfer Switches .......................................................... 1 through 4 26 95 00 Control Panels ................................................................................ 1 through 5
DIVISION 31 - EARTHWORK
Section 31 25 00 Stormwater Pollution Prevention Plan ............................................ 1 through 4
BOOK V- APPENDICES
APPENDIX A1
Project Environmental Requirements .................................................................. 1 through 4
APPENDIX A2
Green Diamond Property Conditions .................................................................. 1 through 8
END OF DOCUMENT
LIST OF DRAWINGS
RESDMSTR: 02/03/2014 00 01 15 - 1 DGS000000136825
DOCUMENT 00 01 15
ALDER CAMP– INCREMENT 1
Sheet Number Description
GENERAL
AC-T1 TITLE SHEET
AC-T2 DRAWING INDEX
AC-T3 ABBREVIATIONS AND SYMBOLS
AC-T4 INSPECTION/TEST REQUIREMENTS
CIVIL
AC-C1 GENERAL, GRADING AND EROSION CONTROL NOTES
AC-C2 CONSTRUCTION PLAN LEGEND AND SYMBOLS
AC-C3 GRADING PLAN
AC-C4 ACCESS ROADWAY
AC-C5 STOCKPILE LOCATION MAP
AC-C6 TOWER SITE ACCESS ROUTE
STRUCTURAL
AC-S1.1 STRUCTURAL NOTES
AC-S1.2 STRUCTURAL NOTES AND ABBREVIATIONS
AC-S1.3 TYPICAL DETAILS
AC-S2.1 PROPANE TANK PLAN AND DETAILS
AC-S3.1 CMU BUILDING VAULT FOUNDATION AND ROOF FRAMING PLANS
AC-S3.2 CMU BUILDING VAULT SECTIONS
AC-S3.3 CMU BUILDING VAULT FOUNDATION DETAILS
AC-S3.4 CMU BUILDING VAULT ROOF DETAILS
AC-S4.1 FEEDLINE BRIDGE FOUNDATION AND FRAMING PLANS
AC-S4.2 FEEDLINE BRIDGE SECTIONS
AC-S4.3 FEEDLINE BRIDGE DETAILS
AC-S5.1 SNORKEL STRUCTURE PLANS AND SECTIONS
AC-S5.2 SNORKEL STRUCTURE DETAILS
ARCHITECTURAL
AC-A1 FLOOR PLANS AND EXTERIOR ELEVATIONS
MECHANICAL
AC-M1 MECHANICAL FLOOR PLAN AND ROOF PLAN
RESDMSTR: 02/03/2014 00 01 15 - 2 DGS000000136825
ELECTRICAL
AC-E1.1 ONELINE DIAGRAM AND PANEL SCHEDULES
AC-E1.2 LIGHTING, POWER, GROUNDING AND EQUIPMENT LAYOUTS
AC-E1.3 VAULT INTERIOR ELEVATIONS
AC-E2.0 ELECTRICAL SITE PLAN
AC-E2.1 ENLARGED SITE PLAN
AC-E2.2 ELECTRICAL SITE PLAN
COMMON DRAWINGS
CO-S1 STRUCTURAL DETAILS
CO-S2 STRUCTURAL DETAILS
CO-A1 ARCHITECTURAL DETAILS
CO-A2 ARCHITECTURAL DETAILS
CO-A3 ARCHITECTURAL DETAILS
CO-M1 MECHANICAL LEGEND, NOTES AND SCHEDULES
CO-M2 MECHANICALDETAILS
CO-E1 ELECTRICAL SYMBOLS, ABBREVIATIONS, LIGHTING SCHEDULE
CO-AT1 FEEDLINE BRIDGE DETAILS
CO-ED1 GENERATOR AND VAULT EQUIPMENT DETAILS
CO-ED2 VAULT EQUIPMENT DETAILS
CO-ED3 VAULT EQUIPMENT DETAILS
CO-ED4 VAULT ALARM STATUS REPORTING SCHEMATIC
CO-ED4A VAULT ALARM POINT DESCRIPTIONS
CO-ED5 DETAILS
CO-ED6 DETAILS
CO-ED7 DETAILS
CO-ED8 VAULT CABLE RUNWAY PLAN AND DETAILS
CO-ED9 DETAILS
ALDER CAMP– INC 2
AC-T1.1 TITLE SHEET
AC-T2.1 DRAWING INDEX
ALDER CAMP
AC-C2.1 CONSTRUCTION PLAN LEGEND AND SYMBOLS
AC-SF1 TOWER FOUNDATION
AC-SF2 FOUNDATION SECTIONS
AC-TE1 190’ TOWER ELEVATIONS INITIAL LOADING
AC-TE2 190’ TOWER SECTIONS INITIAL LOADING
AC-TO1.1 MW ANTENNA SCHEMATICS PART 1 OF 2
RESDMSTR: 02/03/2014 00 01 15 - 3 DGS000000136825
AC-TO1.2 MW ANTENNA SCHEMATICS PART 2 OF 2
AC-TO2.1 VHF SCHEMATICS PART 1 OF 2
AC-TO2.2 VHF SCHEMATICS PART 2 OF 2
TOWER DRAWINGS (BY OTHERS)
T-1 COVER PAGE AND DRAWING INDEX
S-1 ELEVATION VIEW / NOTES
S-2 SECTION 12V-U ELEVATION AND PLAN VIEWS
S-2.1 SECTION 12V-U STRUCTURAL DETAILS
S-3 SECTION 12V-I ELEVATION AND PLAN VIEWS
S-3.1 SECTION 12V-1 STRUCTURAL DETAILS
S-4 SECTION 12V-L ELEVATION AND PLAN VIEWS
S-4.1 SECTION 12V-L STRUCTURAL DETAILS
S-5 SECTION 15XT ELEVATION AND PLAN VIEWS
S-5.1 SECTION 15XT STRUCTURAL DETAILS
S-6 SECTION 18XT ELEVATION AND PLAN VIEWS
S-6.1 SECTION 18XT STRUCTURAL DETAILS
S-7 SECTION 21XT ELEVATION AND PLAN VIEWS
S-7.1 SECTION 21XT STRUCTURAL DETAILS
S-8 SECTION 24XT ELEVATION AND PLAN VIEWS
S-8.1 SECTION 24XT STRUCTURAL DETAILS
S-9 SECTION 27XT ELEVATION AND PLAN VIEWS
S-9.1 SECTION 27XT STRUCTURAL DETAILS
S-10 SECTION 30KT ELEVATION AND PLAN VIEWS
S-10.1 SECTION 30KT STRUCTURAL DETAILS
S-11 TYP. PLATFORM GRATING/BRACING DETAILS
S-12 DIAGONALS/LIGHTING ROD AND MAST/SAFETY CLIMB
S-13 CENTER WAVEGUIDE/CLIMBING MAST DETAILS
S-14 CENTER WAVEGUIDE/CLIMBING CAGE/ANMTI-CLIMB ASSY
S-16 SITE SPECIFIC LEG MOUNTED MICROWAVE LOCATIONS
S-17 SITE SPECIFIC UHF/VHF ANTENNA MOUNTING LOCATIONS
S-18 SUB PLATFORM WAVEGUIDE ICE BRIDGE DETAILS
S-19 MICROWAVE ANTENNA ICE SHIELD DETAILS
S-20 MICROWAVE MOUNT KIT DETAILS
S-21 UHF/VHF ANTENNA MOUNT KIT DETAILS
S-22 LEG/ELEVATION I.D. PLATES
S-23 ANCHOR BOLT LAYOUT AND ANCHOR CAGE ASSY
ANTENNA MOUNTING DRAWINGS (DSA APPROVED #02-119809)
CO-TA1 COVER SHEET AND INDEX
CO-TA2 TOWER STRUCTURAL NOTES
CO-TA3 SITE PRO BRACKET DETAILS
CO-TA5.2 TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)
CO-TA6 TOWER ANTENNA MOUNTING DETAILS (ANDREW/COMMSCOPE)
CO-TA7.2 TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
RESDMSTR: 02/03/2014 00 01 15 - 4 DGS000000136825
CO-TA8 TOWER ANTENNA MOUNTING DETAILS (COMPROD)
CO-TA9 TOWER ANTENNA MOUNTING DETAILS (M2/KRECO)
CO-TA10 TOWER ANTENNA MOUNTING DETAILS (RFS)
BIG LAGOON– INCREMENT 1
BL-T1 TITLE SHEET
BL-T2 DRAWING INDEX
BL-T3 ABBREVIATIONS AND SYMBOLS
BL-T4 INSPECTION/TEST REQUIREMENTS
BL-C1 GENERAL, GRADING AND EROSION CONTROL NOTES
BL-C2 CONSTRUCTION PLAN LEGEND AND SYMBOLS
BL-C3 GRADING PLAN
BL-C4 CIVIL DETAILS
BL-C5 GATE DETAILS AND SLASH PILE LOCATION
BL-C6 TOWER SITE ACCESS ROUTE
BL-S1.1 STRUCTURAL NOTES
BL-S1.2 STRUCTURAL NOTES AND ABBREVIATIONS
BL-S1.3 TYPICAL DETAILS
BL-S2.1 PROPANE TANK PLAN AND DETAILS
BL-S3.1 CMU BUILDING VAULT FOUNDATION AND ROOF FRAMING PLANS
BL-S3.2 CMU BUILDING VAULT SECTIONS
BL-S3.3 CMU BUILDING VAULT FOUNDATION DETAILS
BL-S3.4 CMU BUILDING VAULT ROOF DETAILS
BL-S4.1 FEEDLINE BRIDGE FOUNDATION AND FRAMING PLANS
BL-S4.2 FEEDLINE BRIDGE SECTIONS
BL-S4.3 FEEDLINE BRIDGE STRUCTURE DETAILS
BL-A2 CMU VAULT FLOOR AND ROOF PLANS
BL-A3 CMU VAULT SECTION AND EXTERIOR ELEVATIONS
BL-M1 MECHANICAL FLOOR PLAN AND ROOF PLAN
RESDMSTR: 02/03/2014 00 01 15 - 5 DGS000000136825
PLUMBING
BL-P1 PLUMBING FLOOR PLAN AND ROOF PLAN
BL-E1.1 ONELINE DIAGRAM AND PANEL SCHEDULES
BL-E1.2 LIGHTING, POWER, GROUNDING AND EQUIPMENT LAYOUT
BL-E1.3 INTERIOR ELEVATIONS
BL-E2.0 ELECTRICAL SITE PLAN
BL-E2.1 ELECTRICAL ENLARGED SITE PLAN
CO-A1 ARCHITECTURAL DETAILS
CO-A2 ARCHITECTURAL DETAILS
CO-A3 ARCHITECTURAL DETAILS
CO-M1 MECHANICAL LEGEND, NOTES AND SCHEDULES
CO-M2 MECHANICALDETAILS
CO-P1 PLUMBING LEGEND AND NOTES
CO-P2 PLUMBING SCHEDULES
CO-P3 PLUMBING PIPING DIAGRAM
CO-P4 PLUMBING DETAILS
CO-E1 ELECTRICAL SYMBOLS, ABBREVIATIONS LIGHT FIXTURE
SCHEDULE
CO-AT1 FEEDLINE BRIDGE DETAILS
CO-ED1 GENERATOR AND VAULT EQUIPMENT DETAILS
CO-ED2 VAULT EQUIPMENT DETAILS
CO-ED3 VAULT EQUIPMENT DETAILS
CO-ED4 VAULT ALARM STATUS REPORTING SCHEMATIC
CO-ED4A VAULT ALARM POINT DESCRIPTIONS
CO-ED5 DETAILS
CO-ED6 DETAILS
CO-ED7 DETAILS
CO-ED8 VAULT CABLE RUNWAY PLAN AND DETAILS
CO-ED9 DETAILS
BIG LAGOON– INC 2
BL-T1.1 TITLE SHEET
BL-T2.1 DRAWING INDEX
BIG LAGOON
RESDMSTR: 02/03/2014 00 01 15 - 6 DGS000000136825
BL-C2.1 CONSTRUCTION PLAN LEGEND AND SYMBOLS
BL-SF1 TOWER FOUNDATION
BL-SF2 FOUNDATION SECTIONS
BL-TE1 190’ TOWER ELEVATIONS INITIAL LOADING
BL-TE2 190’ TOWER SECTIONS INITIAL LOADING
BL-TE2.1 190’ TOWER SECTIONS INITIAL LOADING
BL-TO1.1 MW ANTENNA SCHEMATICS PART 1 OF 2
BL-TO1.2 MW ANTENNA SCHEMATICS PART 2 OF 2
BL-TO2.1 VHF SCHEMATICS PART 1 OF 2
BL-TO2.2 VHF SCHEMATICS PART 2 OF 2
S-2 SECTION 12V-U ELEVATION AND PLAN VIEWS
S-2.1 SECTION 12V-U STRUCTURAL DETAILS
S-3 SECTION 12V-I ELEVATION AND PLAN VIEWS
S-3.1 SECTION 12V-1 STRUCTURAL DETAILS
S-4 SECTION 12V-L ELEVATION AND PLAN VIEWS
S-4.1 SECTION 12V-L STRUCTURAL DETAILS
S-5 SECTION 15XT ELEVATION AND PLAN VIEWS
S-5.1 SECTION 15XT STRUCTURAL DETAILS
S-6 SECTION 18XT ELEVATION AND PLAN VIEWS
S-6.1 SECTION 18XT STRUCTURAL DETAILS
S-7 SECTION 21XT ELEVATION AND PLAN VIEWS
S-7.1 SECTION 21XT STRUCTURAL DETAILS
S-8 SECTION 24XT ELEVATION AND PLAN VIEWS
S-8.1 SECTION 24XT STRUCTURAL DETAILS
S-9 SECTION 27XT ELEVATION AND PLAN VIEWS
S-9.1 SECTION 27XT STRUCTURAL DETAILS
S-10 SECTION 30KT ELEVATION AND PLAN VIEWS
S-10.1 SECTION 30KT STRUCTURAL DETAILS
S-11 TYP. PLATFORM GRATING/BRACING DETAILS
S-12 DIAGONALS/LIGHTING ROD AND MAST/SAFETY CLIMB
S-13 CENTER WAVEGUIDE/CLIMBING MAST DETAILS
S-14 CENTER WAVEGUIDE/CLIMBING CAGE/ANMTI-CLIMB ASSY
S-16 LEG MOUNTED MICROWAVE LOCATIONS (INITIAL LOADING)
S-17 UHF/VHF ANTENNA MOUNTING LOCATIONS (INITIAL LOADING)
S-18 SUB PLATFORM WAVEGUIDE ICE BRIDGE DETAILS
S-19 MICROWAVE ANTENNA ICE SHIELD DETAILS
S-20 MICROWAVE MOUNT KIT DETAILS
S-21 UHF/VHF ANTENNA MOUNT KIT DETAILS
RESDMSTR: 02/03/2014 00 01 15 - 7 DGS000000136825
CO-TA1 COVER SHEET AND INDEX
CO-TA3 SITE PRO BRACKET DETAILS
CO-TA4 TOWER ANTENNA MOUNTING DETAILS (ANDREW)
CO-TA5.1 TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)
CO-TA5.2 TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)
CO-TA6 TOWER ANTENNA MOUNTING DETAILS (ANDREW/COMMSCOPE)
CO-TA7.2 TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
CO-TA8 TOWER ANTENNA MOUNTING DETAILS (COMPROD)
CO-TA9 TOWER ANTENNA MOUNTING DETAILS (M2/KRECO)
CO-TA10 TOWER ANTENNA MOUNTING DETAILS (RFS)
CO-TA14.1 TOWER ANTENNA MOUNTING DETAILS (SCALA)
CO-TA18.1 TOWER ANTENNA MOUNTING DETAILS (TELEWAVE)
CO-TA20 TOWER ANTENNA MOUNTING DETAILS (RFS/TELEWAVE)
RATTLESNAKE PEAK – INCREMENT 1
RP-T1 TITLE SHEET
RP-T2 DRAWING INDEX
RP-T3 ABBREVIATIONS AND SYMBOLS
RP-T4 INSPECTION/TEST REQUIREMENTS
RP-C1 GENERAL, GRADING AND EROSION CONTROL NOTES
RP-C2 CONSTRUCTION PLAN LEGEND AND SYMBOLS
RP-C3 GRADING PLAN
RP-C4 SECTIONS AND DETAILS
RP-C5 GATE DETAILS AND LOCATION
RP-C6 TOWER SITE ACCESS ROUTE
RP-S1.1 STRUCTURAL NOTES
RP-S1.2 STRUCTURAL NOTES AND ABBREVIATIONS
RP-S1.3 TYPICAL DETAILS
RP-S2.1 DIESEL TANK PLAN AND DETAILS
RP-S3.1 CMU BUILDING VAULT FOUNDATION AND ROOF FRAMING PLANS
RP-S3.2 CMU BUILDING VAULT SECTIONS
RP-S3.3 CMU BUILDING VAULT FOUNDATION DETAILS
RP-S3.4 CMU BUILDING VAULT ROOF DETAILS
RP-S4.1 FEEDLINE BRIDGE FOUNDATION AND FRAMING PLANS
RP-S4.2 FEEDLINE BRIDGE SECTIONS
RESDMSTR: 02/03/2014 00 01 15 - 8 DGS000000136825
RP-S4.3 FEEDLINE BRIDGE STRUCTURE DETAILS
RP-S5.1 SNORKEL STRUCTURE PLANS ANS SECTIONS
RP-S5.2 SNORKEL STRUCTURE DETAILS
RP-A2 CMU VAULT FLOOR AND ROOF PLANS
RP-A3 CMU VAULT SECTION AND EXTERIOR ELEVATIONS
RP-M1 MECHANICAL FLOOR PLAN AND ROOF PLAN
PLUMBING
RP-P1 PLUMBING FLOOR PLAN AND ROOF PLAN
RP-E1.1 ONELINE DIAGRAM AND PANEL SCHEDULES
RP-E1.2 LIGHTING, POWER, GROUNDING AND EQUIPMENT LAYOUT
RP-E1.3 VAULT INTERIOR ELEVATIONS
RP-E2.0 ELECTRICAL SITE PLAN
RP-E2.1 ELECTRICAL ENLARGED SITE PLAN
CO-A1 ARCHITECTURAL DETAILS
CO-A2 ARCHITECTURAL DETAILS
CO-A3 ARCHITECTURAL DETAILS
CO-M1 MECHANICAL LEGEND, NOTES AND SCHEDULES
CO-M2 MECHANICALDETAILS
CO-P1 PLUMBING LEGEND AND NOTES
CO-P2 PLUMBING SCHEDULES
CO-P3 PLUMBING PIPING DIAGRAM
CO-P4 PLUMBING DETAILS
CO-E1 ELECTRICAL SYMBOLS, ABBREVIATIONS LIGHT FIXTURE
SCHEDULE
CO-AT1 FEEDLINE BRIDGE DETAILS
CO-ED1 GENERATOR AND VAULT EQUIPMENT DETAILS
CO-ED2 VAULT EQUIPMENT DETAILS
CO-ED3 VAULT EQUIPMENT DETAILS
CO-ED4 VAULT ALARM STATUS REPORTING SCHEMATIC
CO-ED4A VAULT ALARM POINT DESCRIPTIONS
CO-ED5 DETAILS
CO-ED6 DETAILS
RESDMSTR: 02/03/2014 00 01 15 - 9 DGS000000136825
CO-ED7 COMMON DETAILS
CO-ED8 COMMON VAULT CABLE RUNWAY PLAN AND DETAILS
CO-ED9 COMMON DETAILS
RATTLESNAKE PEAK – INC 2
RP-T1.1 TITLE SHEET
RP-T2.1 DRAWING INDEX
RATTLESNAKE PEAK
RP-C2.1 CONSTRUCTION PLAN LEGEND AND SYMBOLS
RP-SF1 TOWER FOUNDATION
RP-SF2 FOUNDATION SECTIONS
RP-TE1 190’ TOWER ELEVATIONS INITIAL LOADING
RP-TE2 190’ TOWER SECTIONS INITIAL LOADING
RP-TE2.1 190’ TOWER SECTIONS INITIAL LOADING
RP-TO1.1 MW ANTENNA SCHEMATICS PART 1 OF 2
RP-TO1.2 MW ANTENNA SCHEMATICS PART 2 OF 2
RP-TO2.1 VHF SCHEMATICS PART 1 OF 2
RP-TO2.2 VHF SCHEMATICS PART 2 OF 2
S-2 SECTION 12V-U ELEVATION AND PLAN VIEWS
S-2.1 SECTION 12V-U STRUCTURAL DETAILS
S-3 SECTION 12V-I ELEVATION AND PLAN VIEWS
S-3.1 SECTION 12V-I STRUCTURAL DETAILS
S-4 SECTION 12V-L ELEVATION AND PLAN VIEWS
S-4.1 SECTION 12V-L STRUCTURAL DETAILS
S-5 SECTION 15XT ELEVATION AND PLAN VIEWS
S-5.1 SECTION 15XT STRUCTURAL DETAILS
S-6 SECTION 18XT ELEVATION AND PLAN VIEWS
S-6.1 SECTION 18XT STRUCTURAL DETAILS
S-7 SECTION 21XT ELEVATION AND PLAN VIEWS
S-7.1 SECTION 21XT STRUCTURAL DETAILS
S-8 SECTION 24XT ELEVATION AND PLAN VIEWS
S-8.1 SECTION 24XT STRUCTURAL DETAILS
S-9 SECTION 27XT ELEVATION AND PLAN VIEWS
S-9.1 SECTION 27XT STRUCTURAL DETAILS
S-10 SECTION 30KT ELEVATION AND PLAN VIEWS
S-10.1 SECTION 30KT STRUCTURAL DETAILS
RESDMSTR: 02/03/2014 00 01 15 - 10 DGS000000136825
S-11 TYP. PLATFORM GRATING/BRACING DETAILS
S-12 DIAGONALS/LIGHTING ROD AND MAST/SAFETY CLIMB
S-13 CENTER WAVEGUIDE/CLIMBING MAST DETAILS
S-14 CENTER WAVEGUIDE/CLIMBING CAGE/ANMTI-CLIMB ASSY
S-16 LEG MOUNTED MICROWAVE LOCATIONS (INITIAL LOADING)
S-17 UHF/VHF ANTENNA MOUNTING LOCATIONS (INITIAL LOADING)
S-18 SUB PLATFORM WAVEGUIDE ICE BRIDGE DETAILS
S-19 MICROWAVE ANTENNA ICE SHIELD DETAILS
S-20 MICROWAVE MOUNT KIT DETAILS
S-21 UHF/VHF ANTENNA MOUNT KIT DETAILS
CO-TA1 COVER SHEET AND INDEX
CO-TA3 SITE PRO BRACKET DETAILS
CO-TA4 TOWER ANTENNA MOUNTING DETAILS (ANDREW)
CO-TA5.2 TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)
CO-TA6 TOWER ANTENNA MOUNTING DETAILS (ANDREW/COMMSCOPE)
CO-TA7.2 TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
CO-TA8 TOWER ANTENNA MOUNTING DETAILS (COMPROD)
CO-TA9 TOWER ANTENNA MOUNTING DETAILS (M2/KRECO)
CO-TA10 TOWER ANTENNA MOUNTING DETAILS (RFS)
CO-TA18.1 TOWER ANTENNA MOUNTING DETAILS (TELEWAVE)
CO-TA20 TOWER ANTENNA MOUNTING DETAILS (RFS/TELEWAVE)
INVITATION FOR BIDS
RESDMSTR: 08/01/2024 00 11 00 - 1 DGS000000136825
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
DOCUMENT 00 11 00
SEALED BIDS: DGS will receive sealed bids at 707 Third Street, West Sacramento, California 95605, before 2:00 P.M., November 26, 2024. Bids received after this date/time will not be considered received on time.
A public bid opening will be held on November 27, 2024, at 10:00 A.M. at 707 Third Street, West Sacramento, CA 95605. Bidders may attend virtually or in person. Bidders attending the bid opening in-person will need to meet and sign in at the security guard station in the lobby at the mailing address below. At the public bid opening, all bids received before 2:00 P.M., November 26, 2024, will be opened and recorded onto a Preliminary Bid Tabulation. Bidders do not need to attend the bid opening as the Preliminary Bid Tabulation will be made available immediately after the bid opening is completed and it will be emailed to invited bidders.
The bid opening may be attended virtually via the following link:
Teams meeting link: https://teams.microsoft.com/l/meetup-join/19%3ameeting_NTI0YzBmM2ItNGExNC00YzkyLWIwNmItYTI4NTM3MDQ0OTA5%40thread.v2/0?
context=%7b%22Tid%22%3a%22ea45f7b1-07d7-49a8-b8f5- 37136ec9382d%22%2c%22Oid%22%3a%223b64f837-4256-46bc-9349-e8174cd968a7%22%7d Teams meeting ID: 233 755 363 707 Teams Passcode: Epyogb
HAND DELIVERED BIDS: Shall be placed in the DGS/OBAS Bid/Proposal Drop Box located in the lobby at 707 3rd Street in West Sacramento. The Drop Box will be opened at 2:00 p.m. Tuesday through Thursday and bids/proposals in the box will be certified as being received before 2:00 p.m.
that day.
If mailing bids, ensure the outside of the mailing reads:
ATTENTION: HECTOR CAVAZOS
RELOCATION OF RED MOUNTAIN COMMUNICATIONS SITE
STATE OF CALIFORNIA GOVERNOR’S OFFICE OF EMERGENCY SERVICES
DEL NORTE AND HUMBOLDT COUNTY, CALIFORNIA
DO NOT OPEN
DEPARTMENT OF GENERAL SERVICES
OFFICE OF BUSINESS AND ACQUISTION SERVICES
707 3RD STREET, MS 508, WEST SACRAMENTO, CA 95605
The bids shall include all Work pursuant to the Drawings and Project Manual, and Addenda as may be issued prior to bid opening date.
Scope of Work: Major components of Project Work consist of establishing three new tower and vault communications facilities. Work includes site clearing, grading, road work, excavating for footings, installing towers, feedline bridges, vaults, backup power equipment, tower equipment, propane tanks, diesel tanks, electrical, mechanical and related work.
License: Contractors' State License Classification required to bid Project is A or B.
https://teams.microsoft.com/l/meetup-join/19%3ameeting_NTI0YzBmM2ItNGExNC00YzkyLWIwNmItYTI4NTM3MDQ0OTA5%40thread.v2/0?context=%7b%22Tid%22%3a%22ea45f7b1-07d7-49a8-b8f5-37136ec9382d%22%2c%22Oid%22%3a%223b64f837-4256-46bc-9349-e8174cd968a7%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_NTI0YzBmM2ItNGExNC00YzkyLWIwNmItYTI4NTM3MDQ0OTA5%40thread.v2/0?context=%7b%22Tid%22%3a%22ea45f7b1-07d7-49a8-b8f5-37136ec9382d%22%2c%22Oid%22%3a%223b64f837-4256-46bc-9349-e8174cd968a7%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_NTI0YzBmM2ItNGExNC00YzkyLWIwNmItYTI4NTM3MDQ0OTA5%40thread.v2/0?context=%7b%22Tid%22%3a%22ea45f7b1-07d7-49a8-b8f5-37136ec9382d%22%2c%22Oid%22%3a%223b64f837-4256-46bc-9349-e8174cd968a7%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_NTI0YzBmM2ItNGExNC00YzkyLWIwNmItYTI4NTM3MDQ0OTA5%40thread.v2/0?context=%7b%22Tid%22%3a%22ea45f7b1-07d7-49a8-b8f5-37136ec9382d%22%2c%22Oid%22%3a%223b64f837-4256-46bc-9349-e8174cd968a7%22%7d
RESDMSTR: 08/01/2024 00 11 00 - 2 DGS000000136825
Certificate of Reported Compliance (CRC) – Fleet Vehicles: As a condition of Contract award, prior to Contract execution, Contractor shall submit copies of the valid CRCs for any fleet retained by the Contractor or any listed Subcontractor, for which any vehicles subject to the California Air Resources Board In-Use Off-Road Diesel Fueled Fleet Regulations, Section 2449(i), Title 12, California Code of Regulations, are used in the completion of the work included in the Contract.
More information on the In-Use Off-Road Diesel-Fueled Fleets Regulation can be found at the following link: https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueled-fleets-regulation
Generative Artificial Intelligence (GenAI) Reporting: The State of California seeks to realize the potential benefits of GenAI through the development and deployment of GenAI tools, while balancing the risks of these new technologies. Bidders must notify the State in writing if their solution or service includes, or makes available, any GenAI technology, including GenAI from third parties or subcontractors. The State has developed a GenAI Reporting and Factsheet (STD 1000) to be completed by the Bidder. Failure to disclose GenAI to the State and submit the GenAI Reporting and Factsheet (STD 1000) will result in disqualification of the Bidder and may void any resulting contract.
The State reserves its right to seek any and all relief it may be entitled to as a result of such non-disclosure. Upon receipt of a Bidder GenAI Reporting and Factsheet (STD 1000), the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids that present an unacceptable level of risk to the State.
Generative Artificial Intelligence (GenAI) Disclosure & Factsheet (STD 1000) can be viewed and downloaded at the following internet site: https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std1000.pdf
Completed form GenAI Reporting and Factsheet (STD 1000) must be included in the bid submission, as part of Project Manual Document 00 41 00 “Bid Form”. If the GenAI Disclosure & Factsheet is not submitted by the bidder, the bid shall be deemed nonresponsive.
Availability of Funds: Award of this contract is subject to the availability of funds through the State’s normal budget process and/or transfer of funds to the Department of General Services through the Architecture Revolving Fund.
Pre-bid Site Inspection: Bids will only be accepted from those Contractors having attended the MANDATORY pre-bid site inspection tour on October 29th and 30th 2024, at 9:00 A.M., at which time representatives of the State and prospective bidders shall meet at 1165 Maple Creek Road, Korbel, CA 95550. The tour of the sites begins with a project orientation meeting in Korbel on October 29th, 2024, and then proceed by escort to the first tower site at Big Lagoon, and then continue to the second tower site at Alder Conservation Camp. The tour will continue on October 30th, 2024, at which time representatives of the State and prospective bidders shall meet at 9:00 A.M. at the Pem-Mey Fuel Mart, 125 Ehlers Avenue, Klamath, CA 95548, and then proceed by escort to the third tower site at Rattlesnake Peak. The tour and pre-bid site inspection will conclude upon the return escort to Pem-Mey Fuel Mart. The State’s requirements for Disabled Veteran Business Enterprise (DVBE) participation and other Contract requirements will be presented. Prime Contractors are encouraged to have their Key Administrator and DVBE office coordinator attend to receive this information and to have their questions answered. Attendance for the entire inspection on BOTH DAYS is required in order for bidders to be eligible to submit a bid.
Executive Order N-6-22: The Bidder must be advised of Executive Order N-6-22 Russia Sanctions. On March 4, 2022, Governor Gavin Newsom issued Executive Order (EO) N-6-22 regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid, Bidder represents that it is not a target of Economic Sanctions. Should the State determine Bidder is a target of Economic Sanctions or is conducting prohibited transactions with https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueled-fleets-regulation https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std1000.pdf
RESDMSTR: 08/01/2024 00 11 00 - 3 DGS000000136825
sanctioned individuals or entities, that shall be grounds for rejection of the Bidder’s bid any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
Drawings and Project Manual: Bid forms, plans, specifications, and addenda will be available for download at http://www.caleprocure.ca.gov. Click on “Start Search”. In the Event Name field, enter the project number and click “Search”. While viewing the Event Details, click on “View Event Package” to view bid forms.
It is recommended that all vendors register as a bidder through the Cal eProcure website at https://www.caleprocure.ca.gov/pages/bidder-vendor.aspx. This will allow for automatic notifications if there is any modification to the Event such as the posting of an addendum or additional documentation.
Drawings and Project Manual may also be viewed through Builders' Exchanges.
Bid: Submit Lump Sum basis.
DVBE: Participation in Disabled Veterans Business Enterprises (DVBE) program may be required for this project. Refer to Project Manual Document 00 21 00, Project Manual Document 00 22 10 and Bid Forms for requirements. Bidders are advised to commence the required DVBE procedures immediately upon receipt of drawings and project manual.
DVBE Bid Incentive: The DVBE Incentive program is being applied on this project. Refer to Project Manual Document 00 21 00, Article 18.5.
Small Business Preference: Refer to Project Manual Document 00 21 00, Article 5.5
Non-Small Business Subcontractor Preference: Refer to Project Manual Document 00 21 00, Article 5.6
Bonds: Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price.
Non-Discrimination Program (Gov. Code, Section 12990): Refer to Project Manual Document 00 72 00, General Conditions of the Contract for Construction.
Labor Code: Pursuant to Labor Code, Section 1774, the Contractor to whom the contract is awarded, and any subcontractor under him, shall pay not less than the specified general prevailing rates of per diem to all workers employed in the execution of the contract. Pursuant to Labor Code, Section 1770 et seq., the Department of Industrial Relations (DIR) has ascertained general prevailing rate of per diem wages in the locality in which the work is to be performed. Copies of the general prevailing rate of per diem wages are available from the Department of Industrial Relations, Labor Statistics & Research Division, P.O. Box 420603, San Francisco, CA 94142, (415) 703-4780; or general prevailing rate of per diem may be accessed on the internet at Department of Industrial Relations website (https://www.dir.ca.gov) for the August 2024 published general prevailing rate of per diem wages for this contract. Copies of the general prevailing rate of per diem wages are on file at DGS’ principal office, which shall be made available to any interested party on request. Note that when the general prevailing rate of per diem determination shows an expiration date (noted by a double asterisk**), to expire during the term of the contract, the Contractor must call or write the DIR to obtain the new rates and incorporate them in this contract for submittal of bid. The Contractor is responsible to comply with the Labor Code Sections and general prevailing rate of per diem determinations, including all the guidelines and the fine print in the general prevailing rate of per diem determinations. Refer to Project Manual Document 00 72 00, General Conditions of the Contract for Construction.
http://www.caleprocure.ca.gov/ https://www.caleprocure.ca.gov/pages/bidder-vendor.aspx https://www.dir.ca.gov/
RESDMSTR: 08/01/2024 00 11 00 - 4 DGS000000136825
Labor Compliance Monitoring and Enforcement: This project is subject to monitoring and enforcement by the Department of Industrial Relations (DIR), Compliance Monitoring Unit. All Contractors and subcontractors, regardless of tier, shall be required to comply with the Monitoring and Enforcement Program, including, but not limited to, contractor registration, submittal of electronic certified payroll reports directly to the DIR as applicable and cooperation with on-site monitoring by DIR personnel. Refer to Labor Code 1771.4 et seq. and the General Conditions of the Contract for Construction, Document 00 72 00, Article 3.3.3 for more information.
INSTRUCTIONS TO BIDDERS
RESDMSTR: 08/01/2024 DOCUMENT 00 21 00 DGS000000136825
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
DOCUMENT 00 21 00
Index
Article Page
1. General
2. Competence of Bidders
3. Examination of Bid Documents and Site
4. Discrepancies or Errors and Addenda
5. Bidding Documents
6. Submission of Bids
7. Withdrawal of Bids
8. Public Opening of Bids
9. Rejection of Irregular Bids
10. Competitive Bidding
11. Award of Contract
12. Substitution of Alternative Materials, Articles, or Equipment
13. Return of Bidder’s Security
14. Contract Bonds
15. Insurance
16. Execution of Contract
17. Failure to Execute Contract
18. Participation in Disabled Veterans Business Enterprises (DVBE) Programs
19. Certificate of Reported Compliance – Fleet Vehicles………………………………….……………8
20. Generative Artificial Intelligence (GenAI) Disclosure
May 2024…
This is the start of the file's text. The full file is on GovTribe.