13540365 - FAT WAIVER WORKSHEET.pdf

PDF 746 KB Posted

Attached to
SPRRA226R0083 MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) SPARES – LOCKHEED MARTIN SOLE SOURCE
Solicitation number
SPRRA226R0083
Issued by

About this file

This is a First Article Waiver Worksheet (Revision E, dated 12 March 2020) used to request information and supporting documentation for waiving First Article Testing (FAT) requirements on federal defense contracts.

The worksheet is designed for contractors to request either a full waiver (eliminating all FAT requirements) or a partial waiver (eliminating specific tests only; partial waivers are not acceptable for aviation items). Section 1 captures current acquisition information including the buyer's name, contractor name, part number, NSN, drawing number, solicitation/contract number, contractor CAGE code, and revision level. Section 2 identifies the type of waiver request and requires specific reference to TDP test requirements being waived. Section 3 addresses justification through five pathways: (A) Current or Recent Production demonstrating the item has been manufactured and delivered for a DoD contract within the past three years with identical manufacturing planning, facilities, equipment, tooling, processes, and subcontractors; (B) Successful FAT completion on the same item within the past three years using identical requirements and manufacturing conditions; (C) Successful FAT on the next higher assembly within the past three years at the same facilities with similar equipment and processes; (D) Successful FAT on a similar item within the past three years at the same facilities with similar equipment and processes; or (E) Other justifications with specific supporting documentation. Section 4 requires disclosure of quality issues, manufacturing data changes, and MRB actions. The worksheet must be completed by a company agent who certifies the accuracy of all statements through signature, printed name, title, company name, address, and phone number in Section 6, with supporting documentation attached in Section 5.

View the file

Other files

File Type Posted
FAT ORIENTATION.pdf PDF
SPRRA226R0083 Narrative.pdf PDF
SPRRA226R0083 ENCLOSURE 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This information/supporting documentation is part of your request.

Contact the buyer if you have any questions about the acquisition offer/quote requirements.

FIRST ARTICLE WAIVER WORKSHEET

Request for Information and Supporting Documentation

BUYER'S NAME

Revision E 12 March 2020

1. CURRENT ACQUISITION INFORMATION:

NOUNPART #

CONTRACTOR NAME

NSN

TOP DRAWING #

SOLICITATION/CONTRACT # CONTRACTOR CAGE

REVISION LEVEL

2. TYPE OF REQUEST:

Full Waiver: Includes waiver of all First Article Testing as required by the TDP, contract and/or solicitation.

Partial Waiver: Includes waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP), contract and/or solicitation. Partial waivers not acceptable on Aviation items.

TDP Reference(s) of test(s) to be waived: (Please be specific and reference specification paragraph and/or drawing note as appropriate).

3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply)

Remarks (if needed)

A) CURRENT OR RECENT PRODUCTION

YES NOCRITICAL SAFETY ITEM (CSI)

1) Has the item been manufactured and delivered for a DoD contract within the past 3 years?

3) If past DoD contract delivery was sub-tier to an OEM, is this direct DoD contract delivery utilizing the same manufacturing planning?

4) Since the last delivery for a DoD contract, has there been any manufacturing changes to the following:

Technical Data, Drawings, or Configuration?

2) For the past delivery contracts cited above, where was the item actually manufactured?

NO, continue to section 3B.

YES, provide date, contract number, and substantiation in Remarks.

Date Contract #

IN-HOUSE PRODUCTION, Provide copies of DD-250s, work orders, proof of installation on delivered end item, or other substantiation of past delivery within the past 3 years SUB-TIER SUPPLIER/VENDOR, Provide copies of purchase orders, shipping receipts of delivery, or other substantiation of sub-tier past delivery; in addition to DD-250s of end item delivery, within the past 3 years

Frozen planning, processes, procedure?

Facilities or location?

Equipment or tooling?

Sub-tier suppliers or processors?

N/A NO YES,Provide revision level/date and details in Remarks

N/A YES

NO, provide planning revision level/date in Remarks

N/A NO YES,Provide revision level/date and details in Remarks

N/A NO YES,Provide details in Remarks

N/A NO YES,Provide details in Remarks

N/A NO YES,Provide company/CAGE&qualification in remarks

Provide a full explanation justifying why duplicate testing is unnecessary:

National Stock Number

Contract No.

Date of First Article Approval

Nomenclature

Part Number

Remarks:

If NO, please describe the differences in detail below and include any considerations these changes will require for the First Article Test waiver request

Date of FAT Approval

Contract No.

Issuing Government Agency

- Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?

B) - Has there been a successful completion of a FAT for the same item on a contract within the past three years and the item tested per the same requirements as those referenced in the solicitation and/or contract? YES, complete fill-ins >

NO, enter remarks below

YES, proceed to Section 4

NO, enter remarks below

C) - Has there been a successful performance of a first article test on the next higher assembly within the past three (3) years?

A waiver may be requested in order to eliminate duplication of testing on the lower assembly.

YES, complete fill-ins below on Next Higher Assembly

NO, continue to 3.D.

- Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced? YES, proceed to Section 4.

NO, explain below

Remarks:

National Stock Number

Contract No.

Date of First Article Approval

Nomenclature

Part Number

D) - Has there been a successful completion of a First Article for a similar item on a contract within the past three (3) years and the item tested per the same requirements as those referenced in the solicitation and/or contract.

YES, complete fill-ins below on similar item

NO, continue to 3.E.

- Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced? YES, proceed to Section 4.

NO, explain below

Other: A waiver or partial waiver of the FAT is being requested based on the following:

Please be specific and attach supporting documentation* as appropriate:E)

4. OTHER PERTINENT INFORMATION

There are or have been quality issues (history) for this or similar items such as Quality Escapes, Product Quality Deficiency Reports (PQDRs), Corrective Action Requests, and/or show-cause letters. Please discuss/provide resolutions below:A)

There have been changes to the manufacturing data (e.g. drawing revisions that change materials, dimensions, processes, inspection or testing requirements) or subcontractors used to manufacture the items successfully in the past.

Please describe below.

B)

There have been Requests for Waiver/Deviation submitted or Material Review Board (MRB) actions related to manufacture of this item. Please describe below. C)

5. ATTACH SUPPORTING DOCUMENTATION

6. SUBMISSION

The submitter, by signing the below certifies that the above statements are true and correct.

Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.

PRINTED NAME

COMPANY NAME

PHONE NUMBER

TITLE

COMPANY ADDRESS

Signature

*See the solicitation/contract for information on submitting supporting documentation, as well as, additional requirements regarding First Article Test Waiver requests.

The add, open, and remove buttons are the preferred attachment method.

If attachments do not open, please go to the attachment window by opening View>Show/Hide>Navigation Panes> Attachments to save the attachments to local computer for viewing.

This information/supporting documentation is part of your request.

Contact the buyer if you have any questions about the acquisition offer/quote requirements.

FIRST ARTICLE WAIVER WORKSHEET

Request for Information and Supporting Documentation Revision E 12 March 2020

1. CURRENT ACQUISITION INFORMATION:

2. TYPE OF REQUEST:

3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply) Page of A)

CURRENT OR RECENT PRODUCTION

1) Has the item been manufactured and delivered for a DoD contract within the past 3 years?

3) If past DoD contract delivery was sub-tier to an OEM, is this direct DoD contract delivery utilizing the same manufacturing planning?

4) Since the last delivery for a DoD contract, has there been any manufacturing changes to the following:

Technical Data, Drawings, or Configuration?

2) For the past delivery contracts cited above, where was the item actually manufactured?

Frozen planning, processes, procedure?

Facilities or location?

Equipment or tooling?

Sub-tier suppliers or processors?

Page of

- Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?

B)

- Has there been a successful completion of a FAT for the same item on a contract within the past three years and the item tested per the same requirements as those referenced in the solicitation and/or contract?

C)

- Has there been a successful performance of a first article test on the next higher assembly within the past three (3) years?

A waiver may be requested in order to eliminate duplication of testing on the lower assembly.

- Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?

D)

- Has there been a successful completion of a First Article for a similar item on a contract within the past three (3) years and the item tested per the same requirements as those referenced in the solicitation and/or contract.

- Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?

Page of E)

4. OTHER PERTINENT INFORMATION

A) B) C)

5. ATTACH SUPPORTING DOCUMENTATION

6. SUBMISSION

The submitter, by signing the below certifies that the above statements are true and correct. Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.

*See the solicitation/contract for information on submitting supporting documentation, as well as, additional requirements regarding First Article Test Waiver requests.

The add, open, and remove buttons are the preferred attachment method.

If attachments do not open, please go to the attachment window by opening View>Show/Hide>Navigation Panes> Attachments to save the attachments to local computer for viewing.

8.2.1.4029.1.523496.503679

Buyers-name: MARI BRETZ
NOUN: CONTROL SECTION, GUI
PART_NO: 13540365
CONTARCTOR-NAME: LOCKHEED MARTIN
NSN: 1420-01-540-8608
TOP-DRAWING: 13540365
COntarct-NO: SPRRA226R0083
CAGE: 64059
REVISION: H
FULL-WAIVER:
PART-WAIVER:
A2-REMARKS:
CurrentPage: 1.00000000
CurrentPage: 2.00000000
CurrentPage: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
ResetButton1:
A3REMARKS:
CSI_Y:
CSI_N:
TextField8:
C3_NORADIO:
C3YESRADIO:
date3:
:
C3_explanation:
C3-NSN:
C3-ContractNO:
C3-FATDATEAPPROVAL:
C3-NOMENCALTURE:
C3-PN:
C3-REMARKS:
B3RemarksforNO:
FATAPPROVALDATE:
CONTRACTNO:
IGA:
B3YESRADIO:
B3_NORADIO:
B3-NOREMARKS2:
C3YESRADIO2:
C3_NORADIO2:
D3_Remarks:
D3-NSN:
D3-ContractNO:
D3-FATDATEAPPROVAL:
D3-NOMENCALTURE:
D3-PN:
D3YESRADIO:
D3_NORADIO:
D3YESRADIO2:
D3_NORADIO2:
NumericField1: 0
TextField7:
SignatureField1:
Button1:
Button2:
ListBox1:
Button3:
RadioButtonStyle1:
RadioButtonStyle2:
RadioButtonStyle3:
RadioButtonStyle4:
RadioButtonStyle5:
RadioButtonStyle6:
RadioButtonStyle7:
RadioButtonStyle8:

File details come from the government source that posted it. Updated .