05 Boulder General Contractor Requirements Rev D.pdf

PDF 1 MB Posted

Attached to
CUP Preventative Maintenance and Repair, NIST, Boulder, CO
Solicitation number
1333ND27R0001
Issued by

About this file

This document is a General Instructions guide for conducting work at the NIST Boulder Campus, effective June 26, 2026, issued by the Office of Facilities and Property Management (OFPM) Division of the Department of Commerce.

The guide establishes comprehensive operational, safety, security, and project management requirements for all contractors performing work at DOC facilities. Standard operational hours are 7:00 AM to 5:00 PM, Monday through Friday, with after-hours work requiring prior approval and a PIV-badged employee accompanied by COR escort at all times. All contractor personnel must submit identification information including name, country of citizenship, employer, and green card status to the COR 10 days before work begins, with Real ID compliance mandatory. The contractor must maintain a site-specific Safety, Health, and Environmental Plan addressing OSHA General Industry and Construction Standards (29 CFR 1910 and 1926), fire prevention per International Fire Code and NFPA standards, storm water protection compliant with Mile High Flood District criteria, asbestos-containing material procedures, wastewater discharge authorization, and PCB-containing ballast disposal. Key advance notice requirements include 10 business days for activities affecting NIST operations, 5 business days for roof access and excavation permits, 3 business days for hot work permits, and 7 business days for fire protection system impairment permits. The contractor must provide temporary facilities including sanitary toilets located minimum 33 feet from buildings, maintain equipment and material storage in designated areas with temporary fencing meeting ASTM F3342 standards, coordinate electricity and water utility connections, obtain security point-of-contact badges, and complete all work within the contracted period with detailed project scheduling in Microsoft Project format submitted for COR acceptance prior to commencement.

View the file

Other files

File Type Posted
1333ND27R0001 DRAFT CUP 19NOV2026.pdf PDF
04 Safety Plan Checklist.pdf PDF
06 WAGE DETERMINATION.pdf PDF
01 CUP PWS 11-05-2026.xlsx XLSX spreadsheet
03 CUP Job Plans.zip ZIP file
02 PWS Attachments.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFPM Rev. 2 06-26-2026 1

General Instructions for Conducting Work at the NIST Boulder Campus

Contents Part 1: GENERAL

1.1 INTRODUCTION:

1.2 BACKGROUND

1.3 HOURS OF OPERATION

1.4 UNFORESEEN FACILITY CLOSURES

1.5 SANITARY FACILITIES

1.6 EQUIPMENT AND MATERIAL STORAGE

1.7 ELECTRICITY AND WATER

1.8 TELEPHONE

1.9 ROADS

1.10 PARKING

1.11 CONTRACTOR’S USE OF PREMISES

PART 2: SAFETY

2.1 OCCUPATIONAL HEALTH AND SAFETY

2.2 CODES, ORDINANCES, REGULATIONS

2.3 RESPONSIBILITY AND LIABILITY

2.4 PRE-CONSTRUCTION/SAFETY MEETING

2.5 SAFETY INSPECTIONS

2.6 INCIDENTS ON THE JOB

2.7 PROPER WASTE DISPOSAL

2.8 STORM WATER PROTECTION/COMPLIANCE

2.9 POLYCHLORINATED BIPHENYL-CONTAINING MATERIAL

2.10 WASTEWATER/SANITARY SEWER

2.11 FIRE PREVENTION/PROTECTION

2.12 EMERGENCY RESPONSE PROCEDURES FOR THE UNSCHEDULED MINOR DISTURBANCES OF

ASBESTOS-CONTAINING MATERIAL (ACM)

PART 3: PERSONAL/PHYSICAL SECURITY & PROPRIETARY INFORMATION

06-26-2026 2

3.1 GENERAL

3.2 CONTRACTOR’S SECURITY POINT OF INTEREST

3.3 PERSONAL SECURITY & EMPLOYEE IDENTIFICATION

PART 4: PROJECT PROCEDURES

4.1 GENERAL DESCRIPTION

4.2 PROJECT DOCUMENTATION PROCEDURES

4.3 PERMIT REQUIRED OPERATIONS DURING CONSTRUCTION OR MAINTENANCE ACTIVITIES

4.4 MAINTENANCE OF WORK SITE

4.5 WORK REQUIRING ADVANCE NOTICE AND COORDINATION

4.6 WORK REQUIRING AN MOP

Appendix

Appendix A

Roof Access Permit

Penetration Permit

Hot Work Permit

Fire Protection System Impairment

Excavation Permit

06-26-2026 3

Part 1: GENERAL

1.1 INTRODUCTION:

This document is intended to provide the necessary information/requirements for all contractors performing work at Department of Commerce (DOC) facilities. It is understood that all information in this document may not apply for the specific project described in the Statement of Work; however, it is the responsibility of the contractor to ensure the requirements are met when applicable.

Specifics of the activities are described in the attached Statement of Work and supporting documentation.

Questions about the requirements can be addressed to the Contracting Officer (CO) and Contracting Officer’s Representative (COR)/Project Manager (PM) designated for the specific contract or task order.

1.2 BACKGROUND

The Office of Facilities and Property Management (OFPM) Division manages and provides services to the DOC staff in support of their research, technical, and administrative programs. DOC agencies serviced by OFPM include but may not be limited to: The National Oceanic and Atmospheric Administration (NOAA), The National Telecommunications and Information Administration (NTIA), and The National Institute of Standards and Technology (NIST).

1.3 HOURS OF OPERATION

1. DOC hours of operations are from 7:00 AM to 5:00 PM, Monday through Friday, on normal

Federal workdays. Should the Contractor desire to work at times other than those specified above, the dates and hours must be scheduled at least 10 business days in advance and approved in writing by the COR.

2. Authorized after-hours work will require a Personal Identification Verification (PIV) badged employee from the General Contractor and a COR/Federal escort 100 percent of time if accessing DOC buildings (see section 3.3). Follow the specific procedures pertaining to security and work hours prescribed by the COR/Security.

3. Use the Main Entrance at the DOC site for materials supply and entry for:

a. Special arrangements may be made through the COR for delivery of material/supplies, and/or overtime beyond these hours or on holidays.

b. Check-in required at DOC Visitor’s Center located at the site main entrance.

4. Employee identification shall include the name, country of citizenship, employer, and green card (if applicable) is needed for each Contractor and Subcontractor's employee working on the DOC site. These shall be submitted to the COR for review 10 days prior to the work date. Contractor vehicles must show current registration and proof of insurance. Identification must be Real ID per the REAL ID Act or a different form of government-issued photo identification such as a passport, enhanced driver’s license, or a federal employee, military or veteran identification card.

06-26-2026 4

5. Department of Homeland Security (DHS) Advisory System:

Note: The following paragraphs describe the threat levels that may be changed at any time due to national security issues. If a change is issued by the DHS all changes in procedures/directions for entering and performing work at the site will be communicated to the contractor through the COR. Contractor’s access to the DOC campus grounds may occasionally be restricted as a result of a change in the Nation’s Threat Level when publicly announced by DHS.

6. National Terrorism Advisory System (NTAS)

a. The National Terrorism Advisory System, or NTAS, replaces the color-coded Homeland

Security Advisory System (HSAS). This new system will more effectively communicate information about terrorist threats by providing timely, detailed information to the public, government agencies, first responders, airports and other transportation hubs, and the private sector.

b. It recognizes that Americans all share responsibility for the nation’s security and should always be aware of the heightened risk of terrorist attack in the United States and what they should do.

7. NTAS Alerts

a. After reviewing the available information, the Secretary of Homeland Security will decide, in coordination with other Federal entities, whether an NTAS Alert should be issued.

b. NTAS Alerts will only be issued when credible information is available.

c. These alerts will include a clear statement that there is an imminent threat or elevated threat. Using available information, the alerts will provide a concise summary of the potential threat, information about actions being taken to ensure public safety, and recommended steps that individuals, communities, businesses and governments can take to help prevent, mitigate or respond to the threat.

d. The NTAS Alerts will be based on the nature of the threat: in some cases, alerts will be sent directly to law enforcement or affected areas of the private sector, while in others, alerts will be issued more broadly to the American people through both official and media channels.

e. NTAS Alerts contain a sunset provision indicating a specific date when the alert expires -there will not be a constant NTAS Alert or blanket warning that there is an overarching threat. If threat information changes for an alert, the Secretary of Homeland Security may announce an updated NTAS Alert. All changes, including the announcement that cancels an NTAS Alert, will be distributed the same way as the original alert.

f. Contractor coordinates procedures with COR.

g. Threat Levels:

i. Low Condition (Green): A Low Condition is declared when there is a low risk of terrorist attacks.

1. Federal departments and agencies will implement general and agency-specific Protective Measures to assure that all facilities and regulated sectors take reasonable measures to mitigate vulnerabilities to terrorist attack.

2. Contractor coordinates procedures with COR.

06-26-2026 5

ii. Guarded Condition (Blue): A Guarded Condition is declared when there is a general risk of terrorist attacks.

1. In addition to Protective Measures taken in previous Threat Condition, Federal departments and agencies will implement general measures in addition to agency-specific Protective Measures to check communications with designated emergency response or command locations, update emergency response measures, and provide public with information.

2. Contractor coordinates procedures with COR.

iii. Elevated Condition (Yellow). An Elevated Condition is declared when there is a significant risk of terrorist attacks.

1. In addition to Protective Measures taken in previous Threat Conditions, Federal departments and agencies may develop protective measures for the DOC campus grounds such as increased surveillance, coordinating emergency plans as appropriate with nearby jurisdictions, and implementing contingency and emergency response plans.

2. Contractor coordinates procedures with COR.

iv. High Condition (Orange): A High Condition is declared when there is a high risk of terrorist attacks.

1. In addition to Protective Measures taken in previous Threat Conditions, Federal departments and agencies will implement general and agency-specific Protective Measures for the DOC campus grounds.

2. At this Threat Level the Government may restrict access to site and facility to essential personnel only.

3. Contractor coordinates procedures with COR.

v. Severe Condition (Red). A Severe Condition reflects a severe risk of terrorist attacks.

1. Under most circumstances, the Protective Measures for a Severe

Condition are not intended to be sustained for substantial periods of time. In addition to Protective Measures for previous Threat Conditions, Federal departments and agencies may close Public and Government sites and facilities as a protective measure.

2. Contractor coordinates procedures with COR.

1.4 UNFORESEEN FACILITY CLOSURES

When an unforeseen facility closure occurs, the Contractor will either reschedule the work or perform the work on the next regularly scheduled workday. If the facility is closed, the contractor is not to be on-site unless notified by the contracting officer they are essential. Contractor personnel may be required by the COR to remain on site to handle problems as a result of a closure, e.g., severe weather, national emergency, changes in national security levels.

06-26-2026 6

Information about the status of the site may be obtained by calling the switchboard at 303-497-3000.

Usually, the day’s site status is available by 6 AM MST. Contractor can verify site status and sign up for email and text site notifications at the following website:

http://www.boulder.doc.gov/cgi-bin/docstatus.cgi

1.5 SANITARY FACILITIES

Toilet rooms in existing buildings may be used by the Contractor when performing work inside DOC owned buildings at the discretion of the COR. When toilet rooms in existing buildings are not available or work is being conducted outside the Contractor shall:

1. Provide temporary toilet facilities for use of all workmen.

2. Be located a minimum of 33’ from buildings, utilities, mass gathering points, entry/exit points, and building entrances.

3. Provide the COR with keys to all temporary structures.

4. Maintain toilet facilities in a clean, sanitary condition.

5. Provide adequate supplies of toilet paper, cleaning and other required items.

a. Holding tanks for the collection of sanitary waste will not be permitted.

b. Contractor shall install all pipes serving these trailers underground with appropriate cleanouts and provide measures to prevent them from freezing.

c. Piping shall be run in an organized and pre-planned fashion and all piping shall be removed from the DOC campus upon demobilization of the Construction trailer(s) and the sewer main piping shall be restored to its original condition.

1.6 EQUIPMENT AND MATERIAL STORAGE

The contractor shall provide and store, in an area designated by the COR and approved by the AHJ, all equipment, and materials required to complete the project. The materials are required to be kept undamaged, clean and dry throughout the duration of the project. The contractor shall also coordinate location of any trash receptacles, if necessary, with the COR and shall keep the construction area free of trash and debris. All equipment, materials and garbage shall be kept in a manner to avoid causing a hazard by accidental shifting, ignition or other hazardous qualities.

1. Prior to the start of work, Contractor shall meet with all Subcontractors to arrange and prepare a plot plan defining staging, storage, field office and traffic areas within lay-down/staging and trailer/parking areas designated.

a. Submit a plan for COR's approval not less than 10 business days prior to the installation of temporary facilities. Temporary facilities may be subject to NFPA 241 and may be subject to additional security, and life safety requirements.

b. Except as specifically provided, working and storing outside these areas will not be permitted.

c. Arrange and locate temporary structures and storage to avoid interfering with construction.

2. Within the area designated for its use, provide suitable and sufficient enclosed and covered spaces with raised flooring, to protect materials and equipment from damage by weather, construction work, or other hazards.

http://www.boulder.doc.gov/cgi-bin/docstatus.cgi Morse, Sara A. (Fed) Start with FPAD comments

06-26-2026 7

a. Maintain storage and working areas in clean and orderly condition.

b. Tie down canvas and other coverings sufficiently to be maintained in conditions of high winds.

c. At completion of contract, contractor shall remove all storage areas and return any disturbed areas to original condition or better.

3. For exterior sites requiring temporary fencing, the following shall be followed.

a. Exterior sites and storage areas shall have woven galvanized steel fabric fencing with posts. Fencing shall surround the entire site(s) the contractor is working within. Fencing shall be at a minimum 6 (six) feet tall with opaque fence slats. Slat color shall be dark green/forest green. Fencing sections shall be bound together to withstand the necessary wind forces. Posts shall be suitable for screening and for the designed application (setting in concrete footings, driving into ground, anchoring with adequate base plates, inserting in precast concrete blocks, etc.). When fencing obstructs fire system and/or emergency responder access, to provide the COR with a site plan showing fencing location relative to fire hydrants, fire department connection (FDC) locations, gates in fencing, post indicator valves (PIVs), roadways, and signage locations with example signage provided. Gate shall be lockable and meet the same requirements as the static fence. COR shall be provided with a means to unlock any gates.

b. Temporary fencing shall comply with ASTM F3342 (Current Edition) Temporary Fence Applications for Construction Sites. As a delegated design, the contractor shall provide the site plan with a fence and screen layout and installation plan for review. Plan shall be verified and stamped by a professional engineer. Provide calculations to demonstrate the wind loading for the fence and screen.

c. At the conclusion of the contract, the contractor shall remove the fence and restore the site to its original condition.

1.7 ELECTRICITY AND WATER

DOC may make available, at no cost to the contractor, electricity and water during the course of this project. The contractor is responsible for making connections to the existing systems. (see FAR 52.236- 14, Availability and Use of Utility Services)

1. Electricity: Temporary electrical work shall meet the requirements of the latest edition of NFPA 70 (NEC), Article 305.

a. Temporary electrical service shall be provided from existing campus power distribution system.

i. If the contractor chooses to use Government’s electrical service, then the Contractor is responsible for connection, installation, and maintenance of all portions of the temporary electrical service, and connected equipment.

ii. Verify connection location with COR.

b. Make arrangements for all equipment, poles, meter, wiring, switches, outlets, etc., for all lighting and power requirements for construction purposes.

i. Permanent existing campus power distribution system may be used.

ii. Remove all temporary electrical equipment, when no longer needed.

06-26-2026 8

iii. Immediately preceding completion, remove and replace all damaged parts of permanent systems.

c. Temporary electrical power derived from existing site distribution system will be paid for by the Government. Any other power generation shall be paid for by Contractor.

i. The use of resistive heating devices is prohibited.

ii. Turn off all lighting and/or equipment not in use.

d. Extend warranty or guarantee period on permanent systems used during construction period so they commence on date of Acceptance.

e. Provide UL approved extension cords where necessary.

f. Contractor to submit after hours lighting plan to COR for approval at least 10 business days prior to installation and use.

g. Provide temporary electrical systems which meet Government approval.

h. Contractor shall remove same from the DOC campus at such time as temporary lighting is no longer required.

2. Water:

a. During construction/renovation/and maintenance projects the contractor, with the consent/approval of the COR, shall:

i. Make all arrangements; install equipment, backflow preventer, piping, and outlets for an adequate supply of clean water for construction purposes.

ii. Existing water lines may be used for temporary service.

1. Contractor shall tie into existing domestic water line at a location designated and approved by COR, and shall provide all materials, labor and equipment necessary for the connection of all trailers requiring a domestic water connection.

b. Contractor shall install all pipes serving these trailers underground with appropriate shut-off valves for isolation of each branch connection and shall provide measures to prevent them from freezing.

c. Piping shall be run in an organized and pre-planned fashion and all piping shall be removed from the DOC campus upon demobilization, and the domestic water main piping shall be restored to its original condition.

1.8 TELEPHONE

Telephone service is not normally available on-site for the Contractor’s use.

1.9 ROADS

1. Do not block access to existing facilities.

2. Under no circumstances will egress from a building or to a right of way be blocked. Any changes in egress shall be approved by COR.

3. Any road closures, full or partial, require notification and approval of COR a minimum of 10 business days prior to closure.

4. For large and oversize deliveries that require a trailer or large box truck, the COR will provide a truck route.

06-26-2026 9

5. Contractor shall be required to remove dirt or debris from road surfaces that are a direct result of contractor operations.

1.10 PARKING

1. Personnel performing the work shall not park in any Government parking lot without prior express consent of COR.

2. Contractor acknowledges that any personnel violating this requirement do so at their own risk and will inform personnel that vehicles may be towed at their expense.

3. Parking in residential and other areas in immediate vicinity of Project site is prohibited.

4. Contractor to keep all personnel, vehicles and operations on Project site within designated limits.

5. If authorized by the COR, temporary parking areas shall be surfaced with crushed stone and maintained by the Contractor to prevent deterioration (ruts, mud, etc.). Submit plan to be approved by the COR.

a. The Contractor shall direct personnel performing the work to use access to site designated by COR.

b. The Contractor shall provide parking and transportation for Contractor personnel off the Project site if designated onsite parking areas are inadequate for Contractor needs.

1.11 CONTRACTOR’S USE OF PREMISES

1. Contractor must coordinate all field investigations with COR.

2. Leave undisturbed as much of the site as practical.

a. Land disturbed but not designated for disturbance on the drawings or by the Government shall be restored to its original condition at Contractor's cost. (See FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements).

b. Leave root zones of trees undisturbed.

3. Provide warranty and/or guarantee on permanent items and systems used during construction, commencing on date of acceptance, for specified duration(s). (See FAR 52.246-21, Warranty of Construction)

4. Contractor acknowledges that there is wildlife on the Project site. Take all necessary measures to ensure that all such wildlife is protected from execution of the work. Hunting of any sort is prohibited.

5. Investigation Equipment: Site investigations and field work may require the use of a stepladder and/or other investigative equipment (measuring tapes, flashlights, screwdrivers, etc.).

Contractors shall provide their own stepladders and/or investigative equipment. The stepladders shall be Type 1 (industrial) or Type II (commercial).

6. Operating Equipment: Do not turn off or adjust any equipment without prior authorization from the COR. Work carefully around rotating equipment. Loosely fitting clothes (neckties, dangling jewelry, etc.) shall not be worn when near rotating equipment. Long hair shall be secured. Some equipment may start automatically. Take care when working around this equipment. (NOTE: It may become necessary to implement appropriate lock-out, tag-out procedures to control

06-26-2026 10 hazardous energy sources to ensure that personnel do not activate equipment during investigation, servicing, or maintenance).

7. Mechanical/Electrical Rooms: Obtain authorization from the COR prior to working in electrical and/or mechanical rooms. Lock rooms after use. Do not operate any valves, switches, or breakers without prior approval from the COR. Adhere to all OSHA Lock-Out, Tag-Out Regulations (29 CFR 1910.147).

8. It is the prime contractor’s responsibility to ensure Contractor employees and Subcontractors become familiar with and obey all DOC site regulations, including fire, traffic, and security regulations. All personnel employed on the site shall keep within the limits of the work (and avenues of ingress and egress) and shall not enter any restricted areas unless required to do so and are cleared for such entry. The Contractor's vehicles and equipment shall be conspicuously marked for identification.

PART 2: SAFETY

2.1 OCCUPATIONAL HEALTH AND SAFETY

Contractor(s) acknowledges that by working at the National Institute of Standards and Technology (NIST), a Federal Government facility located in Boulder, Colorado, they are subject to the jurisdiction of the U.S. Department of Labor's Occupational Safety and Health Administration (OSHA). The Regional Office has authority to assign a Compliance Safety and Health Officer (CSHO) to conduct safety and health inspections regarding the Contractors operations at the NIST Boulder site. In addition to OSHA oversight, the Contractor is required to follow NIST health and safety instructions and the Office of Facilities and Property Management (OFPM) safety policies and procedures applicable to their operations.

All Contractor personnel shall have received the appropriate training to work safely on-site without jeopardizing themselves or NIST employees. Contractors must provide verifiable evidence of safety training, such as fall protection or electrical safety certifications, upon request. Documentation:

including email confirmations from authorized safety representatives may serve as a primary method for satisfying this due diligence requirement and must be maintained as part of the project’s safety file.

Contractors are expected to manage the "human factor" by strictly adhering to NIST’s "Stop Work Authority." Any individual on-site, regardless of position or employer, has the authority and the obligation to suspend work immediately if they perceive an imminent danger or a violation of established safety protocols. Work shall not resume until the NIST Safety representative, or the COR has verified that the hazard has been mitigated, and a corrective action plan has been initiated.

CITATIONS AND NOTICE OF PENALTY FOR NONCOMPLIANCE WITH OSHA STANDARDS

1. The Contractor acknowledges that NIST will conduct periodic environmental, health, and safety (EHS) inspections. These inspections are required to protect personnel and property from harm and to mitigate liability from OSHA citations at a multi-employer worksite.

2. The Contractor is required to implement and manage a job specific Safety, Health and Environmental plan. NIST will review and evaluate the Contractor’s Safety, Health and

06-26-2026 11

Environmental plan to ensure that it is site specific for the work being performed. The Safety Plan Requirements Checklist in Appendix A requires a site and job specific plan to be developed and submitted to the government for review and acceptance. No site work may be started until the Site-Specific Safety Plan is accepted.

3. In the event of an onsite emergency, first call 303-497-7777 or 7777 from a campus phone; and then call 911. The Contractor will report the following details: Location (NIST), name, building name or number, room number, and a brief description of the emergency.

2.2 CODES, ORDINANCES, REGULATIONS

Contractors are required to comply with all applicable codes, ordinances and regulations as stated in this document. Contractor to use version below, or most current version. These include, but may not be limited to:

1. Code of Federal Regulations (CFR):

a. OSHA General Industry Safety and Health Standards (29 CFR 1910);

b. OSHA Construction Industry Standards (29 CFR 1926);

c. National Emission Standards for Hazardous Air Pollutants (40 CFR 61);

d. Resource Conservation and Recovery Act standards for hazardous waste disposal (40

CFR 260-281); and

e. Toxic Substance Control Act rules related to asbestos and PCB’s (40 CFR Part 761).

2. National Fire Protection Association (NFPA): latest edition referenced within the ICC codes.

3. Life Accessibility Standards (USFAS).

4. American National Standards Institute (ANSI) A117.1 – American National Standard

Specifications for Making Buildings and Facilities Accessible and useable by the physically handicapped, latest edition.

5. Colorado Department of Public Health and Environment Regulations, Chapter 8.

6. State of Colorado Hazardous Waste Regulations 6 CCR 1007-3

7. Industrial Discharge Permit (2010-1)

8. Municipal Separate Storm Sewer System (MS4) Permit COR042002

9. Construction Permit (Air Pollutant Emissions) 09BO0159

10. Air Quality Control Commission regulation; Number 3, 5 CCR 1001-5

11. NIST ESO Site Security Specifications

12. International Building Code – IBC

13. International Existing Building Code – IEBC

14. International Energy Conservation Code – IECC

15. International Fuel Gas Code – IFGC

16. International Mechanical Code – IMC

17. International Fire Code – IFC

18. International Plumbing Code – IPC

19. US Department of Energy Regulations – 10 CFR 435

20. US Environmental Protection Agency Regulations – 40 CFR

21. State of Colorado Department of Public Health & Environment Regulations for Air Quality

Control of Stationary Sources

06-26-2026 12

22. State of Colorado Department of Labor and Employment Division of Oil & Public Safety – C.R.S. § 9-4-101

23. U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 (applies to fall protection only)

2.3 RESPONSIBILITY AND LIABILITY

The Contractor is to comply with all applicable regulations pertaining to the health and safety of their personnel and subcontractor personnel during the execution of the project. The Contractor will hold the Government harmless from any liability for any action incurred during the execution of the project by their personnel and subcontractor personnel, which results in property damage, illness, injury and/or death.

For excavations and ground penetrations, the Contractor is responsible for locating all underground and building utilities prior to starting work. Contractor is to stop work and notify COR immediately if any unexpected materials, such as utilities or concrete are encountered underground.

Contractor is responsible for locating all utilities 18" either side of the marked utility and shall manually locate any utility prior to mechanical excavation. If identified utilities are not located within the 36" area, the contractor shall notify the COR immediately.

The Contractor is responsible for confirming all dimensions and locations in the field.

2.4 PRE-CONSTRUCTION/SAFETY MEETING

The Contractor may be required to participate in a Preconstruction Conference prior to the start of work for the purpose of reviewing NIST and OFPM site safety regulations, policies and procedures; and to discuss contractual requirements at the discretion of the CO. The Contractor will submit a copy of their Site-Specific Safety Plan to the COR prior to the scheduled Pre-Construction meeting for review, comment, and approval. NTP will not be issued until Site-Specific Safety Plan is approved.

2.5 SAFETY INSPECTIONS

The Government will conduct safety inspections of work performed by the Contractor. Unsafe conditions and/or practices by the Contractor will be brought to their attention for correction. All NIST staff have “Stop Work Authority”. The COR and OFPM Safety Representative (SR) have the authority to continue “STOP WORK” until the unsafe site or unsafe condition is deemed safe by the COR or SR and then work can continue. If the Contractor is in non-compliance with safety rules and regulations the COR/SR will notify the Contractor’s site superintendent/safety point of contact verbally and in writing for immediate corrective action. Immediate corrective action is required, and a written report of corrective action(s) taken is required to be returned to the COR/SR.

If Contractor personnel are removed from the project as the result of unsafe actions or conduct the Government may, at any time, require a meeting with the Contractor’s management and safety personnel to discuss corrective actions.

06-26-2026 13

Daily inspections by the Contractor are mandatory and must focus on high-hazard areas, such as, the integrity of fall protection systems, egress, trenching/excavation sites, energized electrical systems, heavy equipment operating areas, and confined spaces. Any deficiencies identified during these inspections must be documented and corrected. These inspections shall be included in the contractor’s daily reports.

2.6 INCIDENTS ON THE JOB

The Contractor is responsible for keeping the Government informed of all incidents during the execution of the project. If an on-the-job incident occurs during the execution of a project at the NIST Boulder site, the Contractor shall immediately notify the COR by phone and will submit a preliminary incident report to the COR no later than two (2) calendar days after the incident occurred. The incident report shall contain date of incident, type of incident (injury, fire, property damage, spill, etc.), a brief description of the accident, the cause of the incident, lessons learned, and corrective actions taken to prevent it from recurring. The contractor shall submit a final report including all the information listed above as well as any additional information as required by the CO and/or COR within seven (7) calendar days after the incident occurred.

Spills reaching stormwater systems, storm sewers, or surface waters must be reported to the COR as soon as possible, but no later than 24 hours after discovery.

The contractor is responsible for correcting any damage caused to the NIST Boulder site and field sites as a result of their construction work and returning the site to previous conditions at no cost to the Government.

A written report summarizing incidents for the previous month will be sent to NIST via email not later than the 5th business day of the month. The report must contain the following information:

1. NAICS Code

2. Total number of man-hours worked in the month

3. Injury and illness experience for the month

4. Near miss incidents for the month

5. Fire incidents

6. Property damage incidents

If deemed necessary, the Government reserves the right to conduct a full investigation of all Contractor operations associated with the incident(s).

2.7 PROPER WASTE DISPOSAL

The Contractor will remove all materials that are not an integral part of the project, including paint, chemicals and debris in accordance with all applicable Federal, State, and/or Municipal laws, regulations, or requirements. Materials will not be disposed of by flushing them into a drainage system.

When hazardous materials from the performance of this contract are disposed of off-site, submit copies of permits from applicable Federal, State, or Municipal authorities, manifests and/or certificates-of-destruction to demonstrate that the material has been disposed as per all applicable regulations.

McKinney, Marcus A. Mr. (Fed) Skips from 2.6 to 2.8.

06-26-2026 14

The contractor will coordinate the location of any dumpsters provided by the contractor for the removal of waste during the project with the COR while developing the staging plan.

If a dumpster is to be located within 100 ft of a building, the contractor is required to secure all dumpster openings with covers and locks. This shall be part of the staging plan submittal to be reviewed by NIST Security and approved by COR.

2.8 STORM WATER PROTECTION/COMPLIANCE

1. Contractors are responsible for cleanup of sediment that erodes from a job site and may be held financially responsible for removal of sedimentation from streams or storm drains.

2. Appropriate control measures must be selected, designed, installed, implemented, and maintained to minimize all potential pollutants, such as but not limited to sediment, construction site waste, trash, discarded building materials, concrete truck washout, chemicals, sanitary waste, and contaminated soils in discharges.

3. Contractors must protect streams, ditches, basins, drainage swales and other water bodies from deposition of sediment from sites on which they are working.

4. Erosion and sediment control best management practices (BMPs) must meet the specifications found in the Mile High Flood District (MHFD) Urban Storm Drain Criteria Manual. BMPs for construction activities are found in Volume 3. The following BMPs must be installed in accordance with the specifications in the MHFD Urban Storm Drainage Criteria Manual:

a. Stormwater runoff from all disturbed areas and soil storage areas for which permanent or temporary stabilization is not implemented, must flow to at least one control measure to minimize sediment in the discharge.

b. Vehicle tracking controls shall be implemented to minimize vehicle tracking of sediment from disturbed areas.

c. Outlets that withdraw water from or near the surface shall be installed when discharging from basins and impoundments, unless not technologically possible, or not economically practicable and achievable.

d. Maintain pre-existing vegetation or equivalent control measures for areas within 50 horizontal feet of receiving waters as described in the EPA General Permit for Discharges from Construction Activities, unless infeasible.

e. Soil compaction must be minimized for areas where infiltration control measures will occur or where final stabilization will be achieved through vegetative cover.

f. When feasible, topsoil shall be preserved for those areas of a site that will utilize vegetative final stabilization.

g. Minimize the amount of soil exposed during construction activity, including the disturbance of steep slopes.

h. Bulk storage, 55 gallons or greater, for petroleum products and other liquid chemicals must have secondary containment, or equivalent protection.

i. Control measures for concrete washout areas must be implemented.

j. Loading and unloading operations.

k. Outdoor storage of construction site materials, building materials, fertilizers, and chemicals.

l. Bulk storage of materials.

https://mhfd.org/resources/criteria-manual https://mhfd.org/resources/criteria-manual-volume-3

06-26-2026 15

m. Vehicle and equipment maintenance and fueling.

n. Significant dust or particulate generating processes.

o. Routine maintenance activities involving fertilizers, pesticides, detergents, fuels, solvents, and oils.

p. Asphalt and concrete batch plants.

q. Other areas or operations where spills can occur.

r. Other non-stormwater discharges including construction dewatering not covered under the EPA General Permit for Discharges from Construction Activities and wash water that may contribute pollutants to the MS4.

s. Construction waste control, material containment, and spill prevention.

t. Temporary stabilization must be implemented for earth disturbing activities on any portion of the site where ground disturbing construction activity has permanently ceased or temporarily ceased for more than 14 calendar days. Temporary stabilization methods may include, but are not limited to, tarps, soil tackifier, and hydroseed. The construction operator may exceed the 14-day schedule when either the function of the specific area of the site requires it to remain disturbed, or physical characteristics of the terrain and climate prevent stabilization. The construction Stormwater Pollution Prevention Plan (SWPPP) must document the constraints necessitating the alternative schedule, provide the alternate stabilization schedule, and identify all locations where the alternative schedule is applicable on the site map.

u. Final stabilization must be implemented for all construction sites. Final stabilization is reached when all ground surface disturbing activities at the construction site are complete; and, for all areas of ground surface disturbing activities, establish uniform, perennial vegetation that provides 70% or more of the cover that is provided by vegetation native to the local undisturbed areas; and/or implement permanent non-vegetative stabilization measures to provide effective cover.

v. The exceptions to Part 2.4.5.4.2 include: arid, semi-arid or drought-stricken areas, disturbed areas on agricultural lands that are restored to their preconstruction agricultural use, and areas that need to remain disturbed as described in the EPA General Permit for Discharges from Construction Activities.

w. Final stabilization must be designed and installed as a permanent feature. Final stabilization measures for obtaining a vegetative cover and permanent non-vegetative measures include, but are not limited to, the following as appropriate:

i. Seed mix selection and application methods;

ii. Soil preparation and amendments;

iii. Soil stabilization methods (e.g., crimped straw, hydro mulch or rolled erosion control products);

iv. Appropriate sediment control measures as needed until final stabilization is achieved;

v. Permanent pavement, hardscape, xeriscape, stabilized driving surfaces; or

vi. Other alternative stabilization practices as applicable.

x. The Permittee must ensure all temporary control measures are removed from the construction site once final stabilization is achieved, except when the control measure specifications allow the control measure to be left in place (i.e., bio-degradable control measures).

06-26-2026 16

y. All control measures must remain in effective operating condition and be protected from activities that would reduce their effectiveness. Control measures must be maintained in accordance with good engineering, hydrologic, and pollution control practices. The necessary repairs or modifications to a control measure requiring routine maintenance must be conducted to maintain an effective operating condition.

5. Soil may not be stockpiled on paved surfaces without using best management practices such as first laying down plastic and placing straw barriers on the down gradient side of the stockpile.

6. Disturbed soil must be stabilized after 14 days have passed without work being performed in that location. Temporary stabilization is acceptable for sites that are intermittently worked.

7. Soil piles remaining after completion of work must be removed before the contractor leaves the site or within 14 days of completing work whichever is earlier.

8. All disturbed soil must be permanently stabilized before work will be accepted as complete.

Ineffective stabilization (does not prevent erosion) or stabilization that does not meet the specifications in the MHFD Urban Storm Drainage Criteria Manual must be replaced.

9. Stabilization work may be delayed if the soil is frozen or covered with snow/ice. The delays must be documented.

10. Any discharge to the storm drain, other than the ones listed below, is prohibited under the Municipal Separate Storm Sewer System (MS4) permit issued to the Department of Commerce Boulder Laboratories by the U.S. Environmental Protection Agency (EPA). Note: Many of these permitted discharges do not occur at the DoC Boulder Laboratories.

a. Discharges authorized by a separate NPDES permit;

b. Discharges in compliance with instructions of an On-Scene-Coordinator pursuant to 40

CFR part 300 or 33 CFR 153.10(e);

c. Water line flushing;

d. Landscape irrigation;

e. Diverted stream flows;

f. Rising ground waters;

g. Uncontaminated ground water infiltration;

h. Uncontaminated pumped ground water;

i. Discharges from potable water sources;

j. Foundation drains;

k. Air conditioning condensate;

l. Irrigation water;

m. Springs;

n. Water from crawl space pumps;

o. Footing drains;

p. Lawn watering;

q. Flows from riparian habitats and wetlands;

r. De-chlorinated swimming pool discharges;

s. Street wash water;

t. Power washing where no chemicals are used;

u. Roof drains;

v. Fire hydrant flushing; and

w. Discharges or flows from firefighting activities occurring during emergency situations.

06-26-2026 17

11. Discharges other than those listed in 2.9.8 must be reported to the COR within 24 hours of discovery.

12. Construction projects greater than one acre in area or part of a larger development plan greater than one acre in area must be permitted through the EPA electronic notice-of-intent (eNOI) system. Stormwater management on projects required to be permitted under the eNOI system must comply with the EPA Construction General Permit (CGP). See below for the permitting process.

a. A CGP and MS4 Permit-compliant Stormwater Pollution Prevention Plan must be submitted to NIST for review.

i. After the SWPPP is approved by NIST, the contractor shall submit the NOI.

ii. The SWPPP must conform to the requirements of the Construction General

Permit and MS4 Permit. Note: Revisions will be required if the SWPPP does not comply with the CGP.

iii. Guidance for developing SWPPPs that conform to EPA requirements may be found at: http://cfpub.epa.gov/npdes/stormwater/swppp.cfm.

b. The contractor must register on the EPA Central Data Exchange (CDX) in order to electronically file the eNOI. To register, go to the EPA Central Data Exchange (CDX). Click the link for more information on the NOI system.

c. The contractor shall submit the electronic NOI (eNOI) through the CDX. Submission of a hardcopy NOI is permitted by EPA but will significantly delay the review process.

d. The contractor shall wait 14 days for approval and/or provide any information requested by EPA. A lack of response by EPA by the end of that 14 day period is de facto approval of the contractor’s eNOI.

e. The contractor may begin land disturbing work when the NOI is approved.

f. Upon completion of the project, the contractor shall submit a notice-of-termination

(NOT) through the EPA CDX. The following requirements must be met prior to submitting the NOT.

i. As-built drawings of the stormwater BMPs shall be provided to the COR.

ii. Operations and maintenance (O&M) manuals for all stormwater BMPs shall be provided to the COR.

iii. Final stabilization shall be complete per the requirements of the CGP.

iv. All contractor-owned materials that may be considered potential pollutants shall be removed from the site.

v. All construction BMPs shall be removed.

vi. Items c and e may be waived if the contracting officer executes an agreement for the contractor to transfer the site to another contractor.

13. Development or redevelopment projects with a footprint greater than 5000 square feet are required to comply with Section 438 of the Energy Independence and Security Act of 2007 (EISA) and include stormwater BMPs that produce the predevelopment hydrology of the site, effectively resulting in a runoff coefficient comparable to grassland (approximately 0.4). This includes both the quantity and quality of runoff. This applies to the design and construction of new facilities or plans for redevelopment of facilities at the end of the life cycle. This requirement does not apply to repairs made to operable facilities such as roof repairs and resurfacing of roadways or parking areas. This requirement may also be excluded from a project http://cfpub.epa.gov/npdes/stormwater/swppp.cfm https://cdx.epa.gov/ https://www.epa.gov/npdes/submitting-notice-intent-noi-notice-termination-not-or-low-erosivity-waiver-lew-under

06-26-2026 18 if a separate project or phase of a large project is planned to meet the requirements of EISA Section 438. The COR and contracting officer will make this determination.

14. To install a dewatering well (any ground penetration used to dewater), a permit issued by the Colorado Division of Water Resources is required. Discharged water must meet the water quality standards in 5 CCR 1002-31 and 38 and have a turbidity of less than 30 NTU. Dewatering and discharge to the storm sewer system may not be performed until the permit has been issued. Plans for construction projects involving excavation at or near the water table must include a plan to comply with these requirements. Sampling and analyses are required prior to discharging dewatered groundwater to stormwater. Portable tanks may be necessary to contain water until analytical results have been received. At minimum, settling of suspended solids will be necessary. Additional best management practices such as filtration equipment may be required. Best management practices for dewatering may be found in SM-9 in the MHFD Urban Storm Drainage Criteria Manual. There is no known or suspected contamination of groundwater at the DoC Boulder Labs. However, discovery of suspected contamination (unusual odor, color, etc.) must be reported to the COR immediately.

15. On construction projects required to be permitted under the EPA eNOI system, designs must be reviewed by a landscape architect or landscape planner to ensure that revegetation will meet the requirements of the CGP and control the growth of noxious weeds. All other construction projects must comply with NIST/DoC Boulder Labs requirements for revegetation.

16. Failure to comply with applicable regulations or permit terms may result in work stoppage and/or other contractual actions.

a. On construction sites regulated under the CGP and eNOI system, contractors must begin repairs on deficient (improperly installed, missing or ineffective) stormwater BMPs on the day on which the deficient condition is first observed and complete repairs by the end of the following day unless replacement of the BMP is required. The CGP allows 7 days for replacement of BMPs. Any failure to adhere to this requirement must be noted in the SWPPP log and reported to the COR.

b. For projects not regulated under the CGP and eNOI system, if deficient stormwater protection exists at the fault of the contractor, the contractor shall make repairs according to the schedule in Item 1, aside from the requirement to document in the SWPPP log.

c. If corrective actions are the responsibility of the government and require separate contract actions, acquisition of contractor services and/or procurement of materials will be initiated by NIST AMD within 72 hours of receipt of a defined requirement and evidence of availability of funds.

17. The NIST WWV/WWVB site is not subject to the requirements of the NIST Boulder MS4 Permit.

Subparts 2.8.4 and 2.8.11 apply to construction projects exceeding one acre. Due to the proximity of NIST WWV/WWVB to reservoirs, additional local water quality regulations may apply to land disturbing activities.

2.9 POLYCHLORINATED BIPHENYL-CONTAINING MATERIAL

1. The NIST Boulder and WWV/WWVB sites contain small numbers of fluorescent light ballasts containing polychlorinated biphenyls (PCBs). Any ballast not labeled as “No PCBs” should be considered to contain PCBs.

chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https:/mhfd.org/wp-content/uploads/2024/03/72_SM-09%20Dewatering%20Operations.pdf McKinney, Marcus A. Mr. (Fed)

2.9 is used twice

06-26-2026 19

2. Intact PCB-containing ballasts must be recycled or disposed at a facility permitted to handle such materials.

3. Ruptured PCB-containing ballasts must be contained to prevent further releases of PCBs.

4. Areas affected by a release of PCB-containing oil from a ruptured ballast must be cleaned up to the following standards:

a. Decontaminate in compliance with 40 CFR 761.79(a), 761.79(b) and 761.79(f). The use of solvents specified under 761.79(d) is required;

b. Contractors performing decontamination shall limit exposure as required under 761.79(e);

c. Sample surfaces in accordance with 40 CFR 761.269 and 761.272 to verify that decontamination standards have been met;

d. Document sampling locations and analytical results in compliance with 40 CFR 761.280(a); and

e. Porous material contaminated with PCBs shall be removed and disposed as PCB-containing debris if not decontaminated to the standards identified in 40 CFR 761.79(a), 761.79(b) and 761.79(f).

2.10 WASTEWATER/SANITARY SEWER

1. Discharges to the sanitary sewer system that are not listed as allowable under NIST’s Industrial

Discharge Permit are prohibited without prior authorization from the City of Boulder.

a. Discharges are regulated under Title 11, Chapter 3 of the Boulder Revised Code (BRC) in

11-3-4, 11-3-5 and 11-3-7.

b. NIST is subject to limitations on the amount of the following metals. Any discharge containing these substances must be approved prior to discharge.

i. Arsenic;

ii. Cadmium;

iii. Chromium;

iv. Copper;

v. Lead;

vi. Mercury;

vii. Molybdenum

viii. Nickel;

ix. Selenium;

x. Silver; and

xi. Zinc.

xii. Discharge of any substance listed as a hazardous waste under 40 CFR 260-279 or

6 CCR 1007-3 or meeting the definition of a characteristic hazardous waste under those regulations is prohibited.

c. Discharges that may interfere with the operation of the publicly owned treatment works are prohibited

d. Dilution of waste to reduce the concentration below the maximum contaminant level is prohibited.

06-26-2026 20

2. Contractors shall inform the COR of the need to discharge to the sanitary sewer system.

3. The COR shall notify BSHED of the need to discharge to the sanitary sewer system.

4. The contractor…

This is the start of the file's text. The full file is on GovTribe.