This is Amendment 000014 to Solicitation 1333ND26RNB190035, issued by the National Institute of Standards and Technology (NIST) in Boulder, Colorado on August 7, 2026. The amendment incorporates two substantive changes to the solicitation: (1) questions and answers addressing clarifications on project scope and requirements, and (2) clause 1352.228-70 regarding insurance coverage requirements.
The Questions and Answers section addresses 16 inquiries related to a fire suppression system upgrade project for Room 1318 at NIST. Key scope clarifications include: water delivery calculations are required; trip testing is required; hydraulic calculations are mandatory for piping and sprinkler arrangements; new sprinklers must match existing K-Factor and RTI specifications; flex piping is acceptable for relocating sprinkler heads; and system redesign including pipe size increases is required based on water delivery calculation results. The project is subject to Buy American Act requirements and certified payroll obligations. Performance and payment bonds must be satisfied by the prime contractor within 10 calendar days of award. NIST is the permitting authority. Failure to attend the pre-proposal conference does not affect proposal eligibility. The Insurance Coverage clause (1352.228-70) mandates workers compensation with $100,000 employer's liability coverage, general liability of $500,000 per occurrence, automobile liability of $200,000 per person/$500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage, and aircraft/vessel liability as applicable to performance requirements. The amendment was not extended, indicating the offer receipt deadline remains unchanged from the original solicitation date of July 15, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1333ND26RNB190035.pdf | ||
| Solicitation Attachments.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
The purpose of this amendment is to: 1. Incorporate questions and answers. 2. Incorporate clause 1352.228-70, Insurance Coverage, to the solicitation.
1 6
1333ND26RNB190035001 AUG 07, 2026 NB194000-26-02179
Questions & Answers, Add Clause
000014
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
See Block 6
1333ND26RNB190035
JUL 15, 2026
See Schedule
TRAVIS C. ZOELLNER
CONTRACTING OFFICER
7 AUGUST 2026
Table of Contents
SECTION I CONTRACT CLAUSES
I.1 1352.228-70 INSURANCE COVERAGE (APR 2010)
SECTION J LIST OF ATTACHMENTS
J.1 Questions and Answers -B4 RM 1318 FS
PAGE 2 OF 6 1333ND26RNB190035001
SECTION I
CONTRACT CLAUSES
I.1 1352.228-70 INSURANCE COVERAGE (APR 2010)
(a) Workers Compensation and Employer?s Liability. The contractor is required to comply with applicable federal and state workers'' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer?s liability section of the insurance policy, except when contract operations are so commingled with a contractor?s commercial operations that it would not be practical to require this coverage. Employer?s liability coverage of at least $100,000 shall be required, except in states with exclusive or monopolistic funds that do not permit workers'' compensation to be written by private carriers.
(b) General liability.
(1) The contractor shall have bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) When special circumstances apply in accordance with FAR 28.307-2(b), Property Damage Liability Insurance shall be required in the amount of $100,000 .
(c) Automobile liability. The contractor shall have automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract.
Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.
(d) Aircraft public and passenger liability. When aircraft are used in connection with performing the contract, the contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
(e) Vessel liability. When contract performance involves use of vessels, the Contractor shall provide, vessel collision liability and protection and indemnity liability insurance as determined by the Government.
(End of clause)
PAGE 3 OF 6 1333ND26RNB190035001
SECTION J
LIST OF ATTACHMENTS
J.1 Questions and Answers -B4 RM 1318 FS
PAGE 4 OF 6 1333ND26RNB190035001
Questions and Answers – B4 RM 1318 Fire Suppression
1. From pictures provided and the site visit it appears that there is a non-sprinkled combustible plenum space.
The “as-built” drawings denote that sprinklers are not installed within this combustible concealed space. Are we to address the plenum space for additional sprinkler protection? No – Please only address requirements delineated in the Statement of Work.
2. Existing dry system air compressor is remotely located, and it was mentioned that it had ran often. Do we need to address the compressor to determine if it is sufficiently sized for the existing dry system capacity?
Does the existing dry system have a leak, causing the compressor to run as often as mentioned? Does this need to be addressed in this proposal? Vendor does not need to address the compressor to determine if it is sufficiently sized for the existing dry system capacity. We are unaware of any existing leak(s). It does not need to be addressed in this proposal.
3. It appears that the entire building is served from one single dry system zone. Please confirm. Do we need to provide a water delivery calculation due to the possibility of the existing dry system capacity exceeding 750 gallons? Yes – entire building is served from one single dry zone. Please provide a water delivery calculation.
4. Is trip testing required as a part of this scope? Yes – trip testing is required as part of this scope.
5. Would moving existing lighting be considered for accommodating existing and new sprinkler locations? No – moving lighting will not be considered for accommodating existing and new sprinkler locations. If lighting is in the way, please advise and we will affect the relocation of said lighting.
6. The proposed scope of work, as noted on the bid documents, will create a piping and sprinkler arrangement with than 2 sprinklers from 1” piping and/or one branchline outlet. Will we be required to hydraulically calculate this arrangement of piping and sprinklers? Yes – it is required to hydraulically calculate this arrangement of piping and sprinklers.
7. Is NIST or City of Boulder the permitting Authority Having Jurisdiction for the project? NIST is permitting authority for the project.
8. Are we required to provide new sprinklers for any relocated sprinklers? Yes – new sprinklers are required for any relocated sprinklers.
9. What type/schedule of piping and fittings are required to be utilized? New piping can be “flex piping” as needed to locate / relocate sprinkler heads. New sprinkler heads MUST have same K-Factor and RTI as existing.
PAGE 5 OF 6 1333ND26RNB190035001
10. Is this a buy domestic/buy American Act project? Yes.
11. Is this project a certified payroll project? Yes.
12. Regarding the interstitial space between the grid ceiling and the wood structure, will sprinklers need to be installed in the interstitial space in order to bring the area/building into code compliance? No – Please only address requirements delineated in the Statement of Work.
13. Will the existing fire suppression system need to be redesigned, including increasing pipe sizes, to accommodate additional sprinklers coming off the existing main line? The vendor noted that the existing main line appears to be 1 ½ inches and runs through the interstitial space. Yes, the existing fire suppression system in Room 1318 only should be redesigned, including increasing pipe sizes, to accommodate additional sprinklers coming off the existing main line based off the results of the vendor supplied water delivery calculation.
14. Bonding responsibility. Block 12a of the SF 1442 requires the contractor to furnish performance and payment bonds within 10 calendar days of award. Could you confirm whether this requirement must be satisfied directly by the offeror of record, or whether it can be satisfied through a subcontractor who will be performing the work and can provide bonding on the project? Must be satisfied by the prime contractor.
15. Pre-proposal conference and site visit attendance. We were not able to attend the pre-proposal conference and site visit held on July 29, 2026. Does failure to attend affect eligibility to submit a proposal, and is there any alternative way to satisfy the site familiarization requirement referenced in Section L.9 before the offer due date? Failure to attend the site visit does not affect eligibility to submit a proposal; there will be no further scheduled site visits.
16. Insurance requirements Could you confirm where the specific insurance requirements (general liability, auto, workers compensation limits) for this project are located, whether in Attachment 1 (NIST Boulder General Contractor Requirements) or elsewhere in the solicitation? Insurance requirements are detailed in clause 1352.228-70, Insurance Coverage, in Section I of the SF 1442 solicitation document. This clause was inadvertently left out of the original solicitation and has been added.
PAGE 6 OF 6 1333ND26RNB190035001