Amendment 002_1333ND25QNB190437_Boiler and Stack Testing.pdf
PDF 1 MB Posted
- Attached to
- Boiler and Stack Testing Federal contract opportunity
- Solicitation number
- 1333ND25QNB190437
About this file
This document is an Amendment of Solicitation/Modification of Contract for a boiler inspection, maintenance, repair, and stack testing project at the National Institute of Standards and Technology (NIST) Gaithersburg Campus. The amendment includes responses to three contractor questions, clarifying technical details about stack inspection, confirming the proposal submission date as August 29, 2025, at 2:00 PM EST, and addressing concerns about the scope of boiler-related services.
The solicitation (Solicitation #1333ND25QNB190437) covers annual boiler inspection and maintenance activities, with the government indicating that contractors must be prepared to perform or subcontract various specialized tasks such as safety valve recertification and stack emissions testing. The amendment emphasizes that the work can be conducted as originally specified, with any tasks beyond a contractor's capabilities requiring coordination with qualified subcontractors, in alignment with the requirements detailed in the original Request for Bid (RFB).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1333ND25QNB190437 A001 SF30 Amendment 2025 08 19.pdf | ||
| 1333ND25QNB190437 Combined Synopsis Solicitation Notice.pdf | ||
| Attachment 1_Wage Determination MD2015-4269_782025.pdf | ||
| 1333ND25QNB190437 SF1449 Solicitation Boiler and Stack Testing.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
The purpose of this Amendment is to provide questions and answers. See Attachment.
1 2
1333ND25QNB190437A002 AUG 25, 2025 NB193000-25-01398
000SB
NATIONAL INST OF STDS AND TECHNOLOGY
100 BUREAU DRIVE STOP 1640
BUILDING 301 ROOM B129
GAITHERSBURG MD 20899-1640
See Block 6
1333ND25QNB190437
AUG 15, 2025
See Schedule
Attachment Page
PAGE 2 OF 2 1333ND25QNB190437A002
Amendment 002_Solicitation #: 1333ND25QNB190437 Project: BR 193-4 CUP Annual Boiler Inspection, Maintenance, Repair, and Stack Testing at the Gaithersburg Campus
1. Question: On page 12 it references “stack inspection” please clarify that the stack inspection is not reference to an inspection of the stack proper, but in reference to the stack inspection project manager overseeing the stack testing of boilers?
Answer: This portion of the statement of work (SOW) provides the specific requirements the contractor will need to provide or adhere to in relationship to their selection of a qualified boiler emission stack inspector/company and personnel. So yes, it is specifically referencing the stack inspection project manager overseeing the stack testing of boilers. The follow-on points detail how their relationship will work.
2. Question: Please clarify whether the proposal is due 8/25 or 8/29?
Answer: The Government recognized the discrepancy between the SF1449 and Combined Synopsis.
Therefore, for clarity, submissions are due August 29, 2025, at 2:00 PM EST.
3. Question: Boiler Inspectors cannot rebuild or recertify Safety Relief Valves. You must be a National Board "VR" certified shop to do that. The safety valves would have to be disconnected, removed from the boilers, and sent out for recertification. When the recertification has been completed the safety valves would have to be returned to your facility, reinstalled on the boilers, and reconnected to the discharge piping. Boiler Inspectors do not perform Stack Emissions Testing. Boiler "burner" service companies do this type of activity. When you bundle the various maintenance services along with the inspections it makes it difficult to give you a good inspection quote.
Is there any way you can break the contract opportunity into "inspections" and boiler "maintenance" activities?
Answer: The work can be conducted on Requirement the way it has been requested and has been done prior. Any tasks the awarded contractor cannot perform must then be coordinated with hiring a qualified subcontractor. The same applies with stake emission testing and other tasks. Any proposed personnel/subcontractors’ requirements were specifically detailed in the RFB.
File details come from the government source that posted it. Updated .