PROCESS ROOM SURVEY SHEET
DATE/TIME-
SURVEYOR-
POWER-
INSTRUMENT-
INSTRUMENT-
PROCESS ROOM SURVEY SHEET
DATE/TIME- 5/27/21
SURVEYOR-
POWER- shutdown
INSTRUMENT- FLK 451P SN4922
INSTRUMENT- Teletector SN 2181
Comments:
Does rate on contact with HE1-C System Flange Primary Side Measured Dose Rate at 7.5”” is 40 R/h Measured Dose Rate at 15.5”” is 10 R/h
NOTES: All readings are in mR/hr unless otherwise noted, * - Indicates on contact reading, Sump
HE
3 2
HE1-A
7 6
HE1-B
HE1-C
HE-2
D2O Pump # 4
D2O Pump # 3
D2O Pump # 2
D2O Pump # 1
EXP
DEMIN
TO
O
L
BO
X
WORK BENCHES
TS
TANK
DEMIN
IX
DR
Y
DO
W
N D
RU
M
S
FILTER
HIC
2.5 2 32
63 58
290 320
1.5 R/h
30 R/h
15 R/h
*700 overhead run of pipe
*2.5 R/h pre-filter
*1.5 R/h post-filter
*500
DWV-44
*8 R/h
1 R/h
*7 R/h
*1000
*200 under IX
*150
DWV-10
*50 R/h DWV-127 overhead
See Comments X