1333ND21QNB680212 Atch A SOW.pdf

PDF 671 KB Posted

Attached to
MACHINING AND HEAT TREATING OF CHARPY SPECIMENS IDIQ AMENDMENT A001
Solicitation number
1333ND21QNB680212
Issued by

View the file

Other files

File Type Posted
1333ND21QNB680212 A001 SF-30.pdf PDF
1333ND21QNB680212 Atch D - PPQ.doc DOC document
1333ND21QNB680212 Atch D-PPQ.pdf PDF
1333ND21QNB680212 Atch B -Price Schedule.pdf PDF
1333ND21QNB680212 BV RFQ.pdf PDF
1333ND21QNB680212 RFI LOG.xlsx XLSX spreadsheet
1333ND21QNB680212 Atch B -Price Schedule.xlsx XLSX spreadsheet
1333ND21QNB680212 Atch C -Price Schedule.pdf PDF
1333ND21QNB680212 Atch C -Price Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev 1.0 June 23, 2021 1

STATEMENT OF WORK

MACHINING AND HEAT TREATING OF CHARPY SPECIMENS

PART 1

GENERAL INFORMATION

1. GENERAL INFORMATION

1.1. Summary: The purpose of this procurement is to identify machine shops and producers capable of machining and supplying Charpy Specimens according to the National Institute of Standards and Technology (NIST) specifications. All participating vendors must be pre-certified and placed on the Qualified Manufacturers List (QML).

1.1.1.Charpy Specimens are pieces of steel that have a specific hardness due to heat treatment and exacting machining requirements. NIST has manufacturers produce Charpy Specimens in batches. The process has three major steps:

1.1.1.1.Rough machining, where the steel bar is cut to length and machined into blanks. The blanks are not notched and have oversized dimensions suitable for heat treating. Blanking eliminates surface defects that can induce quench cracks during processing, and the oversized dimensions of the blanks allow for re-processing when necessary.

1.1.1.2.Heat treating the blanks, so that the final machined specimens meet the NIST acceptance criteria specified in Part 5.

1.1.1.3.Final machining of heat-treated specimens to final dimensions, as indicated in Part

1.2.Background: The NIST Standard Reference Materials (SRM) Program provides SRM 2092, SRM 2093, and SRM 2113 (Low-Energy Charpy Specimens), SRM 2096, SRM 2097, and SRM 2112 (High-Energy Charpy Specimens), and SRM 2098 (Super-High-Energy Charpy Specimens) to industry to indirectly verify Charpy impact testing machines in accordance with ASTM E23 and ISO 148-2 standards. NIST Charpy SRMs are required in various industry standards and specifications to verify the performance of industrial impact machines to ensure a common measurement base for purposes of trade and commerce. All measurements made by the United States and international industry under the American Society for Testing and Materials (ASTM) E23 test standard are traceable to NIST through these SRMs. The Charpy Specimens are the highest-demand SRMs distributed by NIST.

Rev 1.0 June 23, 2021 2

1.3.To produce Charpy specimens, steel blanks are heat treated in a batch. The entire heat-treated batch, which is typically around 1900 specimens, is designated as the production lot. A pilot lot of 100 specimens, drawn at random from this production lot, is selected for acceptance testing, as discussed herein.

1.4.Period of Performance: The period of performance shall be for one Base Year of 12 months and four 12-month option years. See Commercial Acquisition Regulation (CAR) clause 1352.270-70, Period of Performance for actual dates.

1.5.Type of Contract: The Government intends to award Multiple Award, Indefinite

Delivery / Indefinite Quantity (IDIQ), Firm-Fixed-Price (FFP) contracts (MAC-

IDIQ).

1.6.Quality Control: The Contractor shall develop and maintain an effective Quality

Control Program (QCP) to ensure that the Statement of Work (SOW) requirements are met.

1.7.Place of Performance: The work performed under this contract will be performed at the Contractor’s facility.

1.8.Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post-award meetings convened by the Contracting Officer in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The CO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings, the CO will apprise the Contractor of how the Government views the Contractor's performance. The Contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.9.Contracting Officer Representative (COR): The COR will be identified by a separate letter. The COR assists in contract administration. The COR is authorized to perform the following functions: maintain written and oral communications with the Contractor concerning technical aspects of the contract, monitor Contractor's performance and notify the Contracting Officer of any deficiencies. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the award.

1.10.Technical Point of Contact (TPOC): The TPOC will be identified by name upon contract award. The TPOC is the technical program manager and is responsible for ensuring the final product meets the contractual, technical requirements. The TPOC will notify the Contractor and the COR of any deficiencies. The TPOC will work with the Contractor to address product deficiencies. The TPOC will coordinate the availability and shipment of GFM. For this award, the Charpy Coordinator is the

TPOC.

Rev 1.0 June 23, 2021 3

1.11.Contractor Performance Assessment Reporting System (CPARS): The Federal

Acquisition Regulation (FAR) sections 42.1502 and 42.1503 require Agencies to prepare evaluations of Contractor performance annual. CPARS reporting frequency is as follows:

1.11.1.An annual interim report will be completed upon exercising an option.

Contracting Officer must approve interim Period of Performance greater than 12 months.

1.11.2.A final report is required at contract completion, end of the interim period of performance, end of the last option period, which will be exercised, and contract termination.

1.11.3.An addendum report can be completed to evaluate contract close-out, evaluate performance with respect to other administrative requirements, and/or written at the Government’s discretion at the IDIQ or delivery order level.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1.DEFINITIONS:

2.1.1.CHARPY COORDINATOR. Point of contact for the Charpy Program and the Technical Point of Contact (TPOC) for this contract.

2.1.2.CONTRACTOR. A supplier or vendor having a contract to provide specific supplies or services to the Government. The term used in this contract refers to the prime Contractor.

2.1.3.CONTRACTING OFFICER (CO). A person with authority to enter into, administer, and or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

2.1.4.CONTRACTING OFFICER REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has the authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have the authority to change the terms and conditions of the contract. An Alternate Contracting Officer’s Representative (ACOR) may also be appointed to perform the same functions as the COR.

Rev 1.0 June 23, 2021 4

2.1.5.CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

(CPARS). CPARS is the Contractor Performance Assessment Reporting System and is a web-enabled system with an electronic workflow that reports and rates Contractor performance. CPARS reports provide timely and relevant information on Contractor performance for use in source selection. CPARS includes the Federal Awardee Performance and Integrity Information System (FAPIIS), which is a database reporting on terminations for cause or default, defective cost and pricing data, and determinations of non-responsibility.

FAPIIS records are created using the FAPIIS module located in CPARS, and completed records are used to support future acquisitions.

2.1.6.DELIVERABLE. Anything that can be physically delivered but may include non-physical things such as meeting minutes.

2.1.7.DELIVERY ORDER (DO). An order for the delivery of Charpy Specimens.

2.1.8.AISI-SAE. A numbering system for steel used to designate the chemical composition of carbon and alloy steels.

2.1.9.FIRM-FIXED PRICE. A contract that provides for a price that is not subject to adjustment on the basis of a Contractor’s cost experience in performing the contract.

2.1.10.PILOT LOT. One hundred specimens drawn from the heat treatment basket, finished to specification, and delivered to NIST for acceptance testing.

2.1.11.PRODUCTION LOT. The remaining specimens from heat treatment that are finished to specifications and delivered to NIST for acceptance testing after the pilot lot has been accepted.

2.1.12.QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the end product meets contract requirements. Includes the Quality Control Program (QCP).

2.1.13.STANDARD REFERENCE MATERIAL (SRM). Well-characterized materials produced in quantity and certified for one or more physical properties. Their purpose is to assure the accuracy and compatibility of measurements globally.

2.1.14.SUBCONTRACTOR. One that enters into a contract with a prime

Contractor. The Government does not have the privity of contract with the Subcontractor.

2.1.15.TECHNICAL POINT OF CONTACT (TPOC). An employee of the U.S.

Government appointed by the Contracting Officer to address any technical

Rev 1.0 June 23, 2021 5 aspects of the contract. This individual has the authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract and has no funding implications.

2.2.ACRONYMS:

ACOR Alternate Contracting Officer's Representative AISI American Iron and Steel Institute ASTM American Society for Testing and Materials CAR Commercial Acquisition Regulation CLIN Contract Line Item Number COR Contracting Officer Representative CO Contracting Officer DO Delivery Order FAR Federal Acquisition Regulation FFP Firm-Fixed Price GFM Government Furnished Material HRC Rockwell C Hardness IDIQ Indefinite Delivery / Indefinite Quantity ISO International Standards Organization NIST National Institute of Standards and Technology QCP Quality Control Program QML Qualified Manufacturer’s List SAE Society of Automotive Engineers SOW Statement of Work SRM Standard Reference Material TE Technical Exhibit TPOC Technical Point of Contact

PART 3

GOVERNMENT-FURNISHED MATERIAL

3. GOVERNMENT-FURNISHED MATERIAL (GFM):

3.1.The Government will provide AISI-SAE 4340 and/or AISI 9310 steel bars to the Contractor for use in the performance of this contract. GFM delivery will be tracked and applied to the initial pilot lot delivery schedule as appropriate (PART 13). The Contractor shall notify the Charpy Coordinator when the level of GFM is close to 500 lbs. so additional material can be shipped.

Rev 1.0 June 23, 2021 6

PART 4

CONTRACTOR FURNISHED SUPPLIES

4. CONTRACTOR FURNISHED SUPPLIES:

4.1.General: The Contractor shall furnish all labor, supervision, administration, supplies, and equipment required to perform work under this contract that are not listed in Part 3 of this SOW.

4.2.Liability: The Contractor shall be held responsible for any damage to Government Furnished Material.

4.3.Special Qualifications: Due to the exacting specifications of the Charpy Specimens, only vendors that are pre-qualified by NIST through a Machining Qualifications Program are awarded contracts. This reduces the risk of non-performance, which would result in an intolerable production gap. All Charpy Specimen vendors shall be on the Qualified Manufacturer’s List (QML), maintained by the NIST Charpy coordinator.

4.4.Quality Control: The Contractor shall develop and maintain an effective Quality

Control Program (QCP) to ensure that production meets the required specifications and timelines.

4.4.1.The QCP shall address the following:

4.4.1.1.Overall process for workflow;

4.4.1.2.Proposed work schedule and delivery timeframes for pilot and production lots;

4.4.1.3.Equipment calibration and maintenance as it applies to quality control;

4.4.1.4.Corrective action plan for machining deficiencies;

4.4.1.5.Management of Subcontractors, including quality control and mitigations for changes in subcontractor timelines that will impact scheduling requirements;

and, 4.4.1.6.Storage of Government Furnished Material (GFM).

4.4.2.An electronic copy of the QCP shall be submitted to the Contracting Officer

(CO) for review and approval, with a courtesy copy to the Contracting Officer Representative (COR) and Charpy Coordinator (TPOC) via email within 30 days after contract award. The CO is the approving authority for the QCP.

Rev 1.0 June 23, 2021 7

4.4.3.The Contractor shall submit all proposed changes to the CO for approval. The CO will review and provide the contractor a response within 10 working days.

4.4.4.The Contractor shall maintain a file of all QCP inspections and calibrations conducted by the Contractor and any corrective actions taken. This documentation shall be made available to the CO/ COR upon request during the term of the contract. The Contractor shall maintain these files for a minimum of six months after the contract completion date.

PART 5

SPECIFICATIONS

5. SPECIFICATIONS:

5.1.The Contractor shall provide manufacturing of Charpy Specimens under this contract only as directed on written delivery orders issued by the Contracting Officer in accordance with FAR 52.216-18 Ordering (OCT 1995).

5.2.Specimen Dimensions and Specifications

5.2.1.The Contractor shall manufacture Charpy Specimens from NIST-supplied steel (GFM). For SRMs 2092/2093/2113 (low-energy specimens) and SRMs 2096/2097/2112 (high-energy specimens), NIST will supply the Contractor with AISI-SAE 4340 steel bars. For SRM 2098 (super-high-energy specimens), NIST will supply the Contractor with AISI 9310 steel bars. The Contractor shall determine the exact heat treatment needed to produce the required energy level.

The whole heat-treated production lot shall be made from the same heat of steel.

No other material shall be mixed with the production lot during processing. All specimens shall be machined according to the following specifications, dimensions and tolerances (see Figure 1):

5.2.2.All specimen surfaces, except the ends, shall be ground to the finished dimensions. Any machining technique can be used for the specimen ends, as there are no requirements on their surface finish.

5.2.3.The length of each specimen shall be 55 mm (2.165 in. in.).

5.2.4.The specimen cross-section dimensions shall be 10 mm ± 0.03 mm (0.394 in. ±

0.001 in.) ground square; any two adjacent sides shall be square to 90° ± 9’ (90° ± 0.15°).

5.2.5.Surface roughness (Ra) shall be 1.6 µm (47 µin.) or less on the notched surface and opposite surface, and 3.2 µm (100 µin) or less on the other two longitudinal surfaces.

Rev 1.0 June 23, 2021 8

5.2.6.Notch Specifications:

5.2.6.1.The notch shall be centered at 27.5 mm ± 0.20 mm (l.083 in. ± 0.008 in) from either end.

5.2.6.2.The material thickness below the root of the notch (ligament size) shall be 8.0 mm ± 0.025 mm (0.315 in. ± 0.001 in.).

5.2.6.3.The notch shall be perpendicular to the longitudinal axis of the specimen to 90° ± 9’ (90° ± 0.15°).

5.2.6.4.The included notch angle shall be 45° ± 1°, with a root radius of 0.25 mm ±

0.025 mm (0.010 in. ± 0.001 in.).

5.2.6.5.Specimen notches shall be ground on a surface grinder. Machining with a fly cutter, multi-tooth cutter, or broach or using an electrical discharge machining process (EDM) is not acceptable. To avoid burning or cold working the material at the base of the notch, the next to last grinding pass shall be more than 0.25 mm (0.010 in.) and less than 0.38 mm (0.015 in.). Appropriate machining oil shall be used during all grinding or machining, and notches shall be deburred.

5.2.7.Only for SRM 2098 (Super-High-Energy Charpy Specimens) specimens shall be side-grooved with a total reduction of 14 % of the initial thickness, corresponding to a depth of 0.7 mm ± 0.05 mm (0.028 in. ± 0.002 in.) on each side (unless otherwise specified). Side grooves shall have an included angle smaller than or equal to 90° and a root radius of 0.25 mm ± 0.05 mm (0.010 in.

± 0.002 in.) (Figure 2). The use of an electrical discharge machining (EDM) process for machining the side grooves is acceptable.

Figure 1: Specimen Dimensions (millimeters).

Rev 1.0 June 23, 2021 9

Figure 2: Side-Grooving of Super-High-Energy specimens (only SRM 2098).

PART 6

ACCEPTANCE TESTING PROCEDURES

6. ACCEPTANCE TESTING PROCEDURES

6.1.For SRMs 2092/2093/2113 (Low-Energy Specimens) and SRMs 2096/2097/2112 (High-Energy Specimens), the microstructure shall be 100 % tempered martensite. No ferritic, austenitic, or bainitic structures shall be visible when polished sections are examined at 1000X.

6.2.For all specimens, all dimensions shall be within the stated tolerances.

6.3.For each measured specimen, hardness readings taken at opposite ends of the specimen shall not differ by more than 1.5 HRC (Rockwell C Hardness). The hardness value of each specimen will be the average of the two measurements taken at opposite ends. The coefficient of variation of all measured hardness values (ratio between standard deviation and average value) shall not exceed 2 %.

If either, or both, these hardness requirements are not fulfilled, the Charpy Coordinator will determine whether the lot shall be rejected before testing the specimens.

Rev 1.0 June 23, 2021 10

6.4.The average hardness of low-energy specimens shall not be less than HRC 44.

6.5.The recommended ranges for the average absorbed energies of Charpy specimens are as follows:

6.5.1.Low-energy specimens: between 13.0 J and 20.0 J (9.5 ft.-lbf to 15.0 ft.-lbf).

6.5.2.High-energy specimens: between 85.0 J and 140.0 J (63.0 ft.-lbf to 103.0 ft.-lbf).

6.5.3.Super-high-energy specimens: between 175.0 J and 240.0 J (129.0 ft.-lbf to

177.0 ft.-lbf).

6.6.The Charpy Coordinator will determine if lots outside of the recommended ranges can be accepted.

6.7.Specimens at all energy levels shall meet the following requirements.

6.7.1.1.The sample size (nSS) is calculated as follows:

𝑛𝑛𝑆𝑆𝑆𝑆 = �

3𝑆𝑆𝑝𝑝

𝐸𝐸

where E is equal to the greater of 1.4 J or 5 % of the average energy for the 3 machines, and Sp is the pooled standard deviation of the 3 reference machines.

The standard deviation (s) and the pooled standard deviation (Sp) are calculated as follows:

𝑆𝑆𝑝𝑝 = �𝑠𝑠1

2 + 𝑠𝑠22 + 𝑠𝑠32 𝑠𝑠𝑖𝑖 = �(𝑥𝑥1 − 𝑥𝑥)2 + (𝑥𝑥2 − 𝑥𝑥)2+. . . +(𝑥𝑥𝑛𝑛 − 𝑥𝑥)2 𝑛𝑛 − 1 where sl, s2, and s3 are the standard deviations of the three reference machines.

The sample size, nSS, shall not exceed 5.0. Only for super-high energy specimens, if the sample size, nSS, is between 5.0 and 7.0, the Charpy Coordinator will determine whether the lot can be accepted.

6.7.1.2.The number of outliers shall not exceed 10 % of the number of specimens tested (4 is the maximum when 75 specimens are tested). The outlier analysis is performed using box-and-whiskers plots. Outliers are defined as values that are lower than the first quartile or higher than the third quartile by more than 1.5 times the absolute difference between the first and third quartiles. An alternative outlier analysis can be performed by means of Grubbs’ test (extreme studentized deviate) with α = 0.05. An

Rev 1.0 June 23, 2021 11 outlier will not be removed from analysis unless it shows physical evidence of jamming, material flaws, or other reason for atypical behavior.

6.8.If the specimens from a pilot lot fail to meet any of the above requirements, the

Contractor will be asked to provide an additional pilot lot, unless three pilot lots have already been furnished.

6.9.If the specimens from a production lot fail to meet the above requirements, the Charpy Coordinator will determine if it is in the Government’s best interest to have the Contractor take corrective action with regards to resubmission of failed production lots.

PART 7

MARKING AND PACKAGING DELIVERABLES

7. MARKING AND PACKAGING DELIVERABLES

7.1.Marking Deliverables

7.1.1.All specimens shall be marked in a clear and legible manner as follows:

7.1.1.1.Individual specimens shall be stamped, engraved, or etched on one end with one of the following lot identifications:

Low-Energy: LL NNN High-Energy: HH NNN Super-High Energy: SH NNN, where "NNN" is the lot number, and “LL,” “HH,” and “SH” correspond to low-energy, high-energy, and super-high energy lots, respectively. The Charpy Coordinator will assign lot numbers (NNN).

7.1.1.2.The specimen serial number shall be stamped, engraved, or etched below the lot ID number. Serial numbers shall begin with the number 1 and end with the last number produced within the production lot. For example: “HH 195” (top, lot ID, one or two lines, can be one or two lines), “279” (bottom, specimen serial number). (Figure 3)

7.1.1.2.1.The opposite end shall be stamped or etched with the letters: “NIST.”

(Figure 3)

Rev 1.0 June 23, 2021 12

Figure 3: Charpy Specimen Marking Example

7.1.1.3.Any etching, stamping, engraving, scribing, etc., technique may be used, as long as the specimens marking is of good quality and clearly readable.

7.2.Packaging Deliverables

7.2.1.Shipping containers shall be marked as follows: contract number, lot id, steel type, and unique GFM heat treat number shall be placed on or adjacent to all exterior mailing or shipping labels of specimen shipments.

7.2.2.When a pilot lot or production lot has shipped, the Contractor shall inform the

Charpy Coordinator and provide the tracking number(s) for the shipment(s).

7.2.3.Specimens shall be securely packaged and protected from rusting.

7.2.4.Packages shall weigh no more than 45 pounds each.

PART 8

PILOT SPECIMEN TESTING AND ACCEPTANCE

8. PILOT SPECIMEN TESTING AND ACCEPTANCE

8.1.Pilot lot specimens shall be drawn from predetermined locations in the heat treatment baskets, as coordinated with the Charpy Coordinator, to assure consistency (exceptions may be made for continuous heat treatment processing).

See (Section 6) above for acceptance testing procedures. If the pilot lot fails to meet the specifications in this contract, the Charpy Coordinator will reject it and may suggest re-heat treatment of the batch based on the test outcome. If new steel is to be used, it will be provided to the Contractor by the Charpy Coordinator. The remaining specimens from the failed lot are to be returned to NIST at the Contractor's expense. NIST will destroy returned specimens. No more than three attempts at producing a successful pilot lot will be permitted.

8.1.1.Sampling plan for NIST pilot lots

8.1.1.1.Each pilot lot shall consist of 100 specimens.

Rev 1.0 June 23, 2021 13

8.1.1.2.If more than one basket is used during heat treating, an equivalent amount of specimens from each basket shall be provided in the pilot lot.

8.1.1.3.Specimens from predetermined locations to sample every position in the basket(s) shall be provided in cooperation with the Charpy Coordinator.

8.1.1.4.The Contractor shall provide a list of specimens (serial numbers) taken from each basket's location to the Charpy Coordinator. The relative position of each specimen in the basket (top, middle, bottom, etc.) in the furnace shall be clearly identified.

8.1.1.5. The CO and/COR must approve a pilot lot and provide written approval for the Contractor to begin producing a Production Lot.

PART 9

PRODUCTION SPECIMEN TESTING AND ACCEPTANCE

9. PRODUCTION SPECIMEN TESTING AND ACCEPTANCE

9.1.Specimens shall be randomly drawn from the production lot by the Charpy Coordinator and tested. If the production lot specimens fail to meet the requirements (Section 6), the Charpy Coordinator will reject the lot unless the Charpy Coordinator determines that the Contractor can implement corrective actions. Production lots that fail because of microstructure (Section 6.1.), hardness (Section 6.3.), and/or sample size (Section 6.7.) will be rejected, and the Contractor will be compensated at 30 % of the production lot value. Production lot failure caused by unacceptable specimen dimensions and tolerances (Section 6.2.) will not be compensated. The Charpy Coordinator will determine if it is in the Government’s best interest to have the Contractor take corrective action regarding resubmission of failed production lots. NIST will destroy all specimens from failed lots, and the lot number will be recorded as invalid for SRM purposes.

PART 10

DEFECTIVE GOVERNMENT MATERIAL

10. DEFECTIVE GOVERNMENT-FURNISHED MATERIAL (GFM)

10.1.If the Government determines that pilot or production lot failure is due to defective GFM, the Contractor shall be compensated at 30 % of the entire lot value (pilot + production) as a lot processing fee. Further, the Contractor will be compensated $25.00/specimen for each fully machined specimen produced at the time of Government notification to the Contractor about the defective GFM.

Rev 1.0 June 23, 2021 14

“Fully machined specimens” includes all specimens already delivered to NIST for acceptance testing for that lot, for example, multiple pilot lots of 100 specimens each. Fully machined specimens that have not yet been delivered to NIST (for example, pilot lot specimens in preparation) must have been authorized for production by NIST.

10.2. The CO and/or COR must approve in writing the production of any and all production lots. NIST will not provide consideration for any production lot specimens produced prior to written pilot lot acceptance and approval and CO and/or COR written authorization for the production of production lot specimens.

10.3.The exact number as of the date of Government notification must be documented by the Contractor to the Charpy Coordinator promptly. Maximum compensation will be capped at the entire lot value.

PART 11

PRICING SCHEDULE

11. PRICING SCHEDULE

11.1.Contract line item numbers (CLINs) 0001, 1001, 2001, 3001, and 4001 include a listing of the three categories of Charpy Specimens to be machined from steel supplied by NIST in accordance with the requirements contained in this contract.

11.2.Each delivery order issued under this contract will state the type and quantity of SRM(s) to be machined. Pricing will be in accordance with the Schedule of Machining Prices (Attachment B or C) provided at the time of quotation from the vendor.

11.3.Sample Schedules of Machining Prices

Sample Schedule A of Machining Prices

Rev 1.0 June 23, 2021 15

Sample Schedule B of Machining Prices

PART 12

DELIVERY SCHEDULE

12. DELIVERY SCHEDULE

12.1. The delivery schedule is dynamic and will adjust based on the success or failure of pilot and production lots. The maximum time allowed for an individual lot is 281 days, based on the allowed number of resubmissions (Sections 8 and 9). The Contractor can begin work on assigned lots at any time, and lots can be worked on in parallel. Unless specified in the Delivery Order (DO), the Contractor may choose which lot to work on. Early delivery is acceptable.

12.2. NIST hereby implements an automatic deduction of 1% of the lot(s) pricing (pilot and/or production) per week for delivery after the contractual delivery date per FAR 52.212-4 (a) Inspection and Acceptance.

Figure 4: Scheduled Due Dates

Scheduled Items Due Dates

First pilot lot from Delivery Order (DO) Not to exceed 60 calendar days from receipt of the DO or GFM, whichever comes last

Pilot lot inspection by Charpy Coordinator Not to exceed 14 calendar days from receipt of lot

Failed pilot lot re-submission Not to exceed 45 calendar days from pilot lot rejection notice

Production lot delivery Not to exceed 45 calendar days from pilot lot acceptance notice

Production lot inspection by Charpy Coordinator Not to exceed 14 calendar days from receipt of lot

Failed production lot re-submission Not to exceed 30 calendar days from pilot lot rejection notice

Subsequent (next lot in DO) pilot lot Not to exceed 60 calendar days from production lot acceptance

Rev 1.0 June 23, 2021 16

Figure 5: Sample of Dynamic Schedule

PART 13

INVOICE DEDUCTIONS FOR LATE DELIVERIES

13. INVOICE DEDUCTIONS FOR LATE DELIVERIES

13.1. The delivery time allotted for each lot (pilot and production) on a DO is designated above in Section 12, Figures 4 and 5, as commensurate with FAR 52.212-4 (a) Inspection and Acceptance. The Contractor shall resolve the deficiencies as documented by the COR/TPOC in the failed inspection report. The COR/TPOC will perform a re-inspection and further assess the area of concern once again on a pass/fail basis. If the area of concern still does not meet the contractual standards, an invoice deduction will be assessed. FAR 52.212-4 (s) Order of precedence applies.

13.2. A late notice will be issued to the Contractor when a scheduled delivery date on a

DO as prescribed above in Section 12, Figures 4 and 5 for each lot (pilot and/or production) fail to meet the terms and conditions described in this SOW. The deduction amount to be assessed against the invoice and will be short-paid.

13.3. A deduction of 1 % of the entire lot price (pilot and/or production) per full week of late delivery for any of the dynamic schedule delivery dates. Deductions are cumulative across the delivery dates for a particular lot, with a cap of 5 % of the entire lot price as the maximum deduction that can be levied. Thus, there is a grace period up to one week before the first or next deduction is levied. A two-day delivery would not incur a deduction. In contrast, a delivery that is 11 days late would incur a 1 % deduction, and one that is 15 days late would incur a 2 % deduction.

Rev 1.0 June 23, 2021 17

PART 14

APPLICABLE PUBLICATIONS

14. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

14.1. ASTM E23, Standard Test Methods for Notched Bar Impact Testing of Metallic

Materials, American Society for Testing and Materials, ASTM International, West Conshohocken, PA.

14.2. ISO 148-2, Metallic materials — Charpy pendulum impact test — Part 2:

Verification of testing machines, International Standards Organization, Geneva, Switzerland.

Rev 1.0 June 23, 2021 18

PART 15

ATTACHMENT LISTING

15. ATTACHMENT LISTING

15.1. Attachment 1 - Sample Schedule A of Machining Prices

15.2. Attachment 2 - Sample Schedule B of Machining Prices

Rev 1.0 Jun 23, 2021 2

15.1. Attachment 1- Sample Schedule A of Machining Prices

Rev 1.0 Jun 23, 2021 3

15.2. Attachment 2 - Sample Schedule B of Machining Prices

Item No

Supplies/Services Qnty Unit Unit Price $

Amnt $

Base Period 0001 SRM 2092/2093/2113 Low-Energy Specimens per SOW XX EA $0.00 $0.00

0002 SRM 2096/2097/2112 High-Energy Specimens per SOW XX EA $0.00 $0.00

0003 SRM 2098 Super-High-Energy Specimens per SOW XX EA $0.00 $0.00

Option Period 1 1001 SRM 2092/2093/2113 Low-Energy Specimens per SOW XX EA $0.00 $0.00

1002 SRM 2096/2097/2112 High-Energy Specimens per SOW XX EA $0.00 $0.00

1003 SRM 2098 Super-High-Energy Specimens per SOW XX EA $0.00 $0.00

Option Period 2 2001 SRM 2092/2093/2113 Low-Energy Specimens per SOW XX EA $0.00 $0.00

2002 SRM 2096/2097/2112 High-Energy Specimens per SOW XX EA $0.00 $0.00

2003 SRM 2098 Super-High-Energy Specimens per SOW XX EA $0.00 $0.00

Option Period 3 3001 SRM 2092/2093/2113 Low-Energy Specimens per SOW XX EA $0.00 $0.00

3002 SRM 2096/2097/2112 High-Energy Specimens per SOW XX EA $0.00 $0.00

3003 SRM 2098 Super-High-Energy Specimens per SOW XX EA $0.00 $0.00

Option Period 4 4001 SRM 2092/2093/2113 Low-Energy Specimens per SOW XX EA $0.00 $0.00

4002 SRM 2096/2097/2112 High-Energy Specimens per SOW XX EA $0.00 $0.00

4003 SRM 2098 Super-High-Energy Specimens per SOW XX EA $0.00 $0.00

File details come from the government source that posted it. Updated .