1333ND19RNB190009-0001.pdf
PDF 6 MB Posted
- Attached to
- NIST High Speed Switch Replacement & Annual Maintenance Federal contract opportunity
- Solicitation number
- 1333ND19RNB190009
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP_Attch_B_NIST_AMD_Boulder_PPQ_Form.doc | DOC document | |
| SBPCD_Template.docx | DOCX document | |
| RFP_Attch_A_Project_Data_Sheet.doc | DOC document | |
| 1333ND19RNB190009.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
See Attachment Page.
1 57
1333ND19RNB1900090001 APR 17, 2019 NB196000-19-00327
000014
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
1333ND19RNB190009
MAR 20, 2019
See Schedule
BRENDA HITCHCOCK
Contracting Officer
17 Apr 19
Attachment Page
PAGE 2 OF 57 1333ND19RNB1900090001
The purpose of this amendment is to incorporate the following:
A. The attached questions and answers are hereby incorporated into the solicitation.
B. The attached Pre-proposal Conference notes are incorporated into the solicitation.
C. The attached details for the existing switch are provided.
D. No other changes occur as a result of this amendment.
Table of Contents
SECTION J LIST OF ATTACHMENTS
J.1 Pre-proposal Conference Notes
J.2 Questions and Answers
J.3 CDA-778802-rv002
J.4 QCDR-12230-1-rv0-1b
J.5 QCDR-12230-2-rv1
J.6 QCDR-12230-rv2
PAGE 3 OF 57 1333ND19RNB1900090001
SECTION J
LIST OF ATTACHMENTS
J.1 Pre-proposal Conference Notes
PAGE 4 OF 57 1333ND19RNB1900090001
1333ND29RNB19009
High Speed Switch Replacement Project
Pre-proposal Conference
In accordance with solicitation clause L.14, FAR 52.236-27, Alt 1, the pre-proposal site visit was conducted on 03 Apr 19 at 1:00 PM local time.
In attendance were:
For the Government:
Name Organization Tiffany Atchison NIST-Acquisition Management Division Brenda Hitchcock NIST-Acquisition Management Division Jessica Caraway NIST-Facilities Improvement Group Ben Schulz NIST-Facilities Improvement Group
Attendees:
Name Organization Dwight Hickman InPwr Inc.
Tim Smith InPwr Inc.
Jordan Pontious InPwr Inc.
David Syracuse InPwr Inc./Silicon Power Corp.
Matt Carson International Power Systems
All in attendance were introduced.
Brenda Hitchcock provided each attendee with a handout giving a basic overview of the NIST Campus, solicitation, and project. Ben Schulz provided information on the Statement of Work.
After preliminary briefing all attendees met at the project location.
Areas highlighted during the briefing and site walk:
Due to NIST mission close coordination for any outage will be required to allow for proper notification to organizations and researchers.
Awardee must comply with OSHA requirements and potential offerors were put on notice that Safety is a priority at NIST
The current system is on external bypass as the existing switch is inoperable leaving the campus unprotected from power disruption(s).
Project will require complete disconnection and removal of existing switch.
System should remain on bypass for commissioning.
PAGE 5 OF 57 1333ND19RNB1900090001
Work will require 2, possibly 3, site-wide outages that must be coordinated and scheduled with adequate time to notify facilities.
Pad is to be reworked or replaced to accommodate the new switch keeping the footprint as small as possible. Due to current limitations it is not possible to place pad/switch adjacent to the current location and demo the existing.
There is no secondary feed to the Campus/existing switch. The only feeds are at the site and provided by Xcel Energy. Feeds to existing facilities (excluding NOAA) are separate loops originating at the switch. Xcel has confirmed that the primary and secondary service loops are completely decoupled.
Existing lighting is sufficient and will not be included in the resultant contract. Lighting that is included in the new switch must not cause light pollution for surrounding, off campus, housing area adjacent to the site.
Building Management System Communication -
Line should run along existing road to facility.
The distance is approximately 1,000 feet. The BMS will monitoring, no controls required.
There is no requirement for an audible or visual alarm indicators.
Contract staging area has not been identified yet. Heated restrooms should not be required and are not suggested.
All work should be accomplished from the front of the current fence due to existing conditions at the site of the work.
The government may not have specifications for cable or information relating to the length of the run to the nearest switch gear. The length of feeder from the MVSTS to the non-operation RUPS switchgear is approximately 1200’, 3-500kcmil CU 15kV Type MV-105, #4/0 GND.
Coordination study will be required to be accomplished by the awardee as this is a turn-key requirement. - Yes
Potential offerors were put on notice that the campus is an “open” campus and individuals may walk on to the site without going through security entry points. The nearest entry point was pointed out to those in attendance for their awareness.
The existing switch does not contain FS6.
Questions are due to Brenda Hitchcock NLT Noon, MST 09 Apr 19.
J.2 Questions and Answers
PAGE 6 OF 57 1333ND19RNB1900090001
Question NIST Response
I did not see a date or agenda for the site visit and pre-proposal conference, if they are available could you please send me a quick email with that information
The site visit information is contained in provision L-14. This provision is located on the bottom of page 116 ending on the top of page 117.
Is there any opportunity for waiving bonding? There is no possibility that NIST will waive the bonding requirements
Could you point me to the bonding requirements?
Clauses covering bonding are I.71 through I.74, 52.228-11, -12, - 14, and -15. All are incorporated by reference. The full text can be found as noted in clause I.125 on page 79
During the pre-construction meeting, it was asked if information about the existing S&C Switch could be provided. An “As Built” drawing would be helpful to determine the locations of the existing conduits into the existing S&C Switch. Will this information be provided in an addendum?
Existing switch drawings will be provided.
It is the understanding NIST is on by pass power at the present time. Therefore it is assumed the existing S&C switchgear is not in operation. With a completion time of 300 calendar days and an approximate delivery date of 270 calendars for new high voltage switch, demo of existing S&C switchgear will require demolish several month before the new high voltage switch arrives on site. Is there a time frame as to how soon work can begin on the removal of the existing switch?
The current switch is currently still being repaired and is expected to be operational before the replacement begins.
There is not a set time frame that the replacement project must work in, but it is desired that the window without a switch be kept to a minimum (though it is understood that this could be up to several months).
Is there a requirement for a coordinate study and arc study required? Yes
Please verify the load types (a single line with feeds, load types, fault currents, disconnects, PT’s, CT’s , generators, solar, wind, energy storage, capacitive banks, etc.). Needed if we are to submit a coordination and arc flash study
A site one-line and additional information can be provided to the successful bidder. There is no power generation, energy storage, capacitive banks, or motors on site at medium voltage
Please verify the number of conduits, size of conduit and conductor size and number of medium voltage cable from the existing primary switch into the existing S&C switchgear. Section 26 05 43-9 paragraph 3.4.H states minimum of 5” conduit size.
Current documentation indicates two conduits (1 spare, 1 in use) for each primary feed, 3-500kcmil CU 15kV Type MV-105, #4/0 GND. Awardee will be required to verify.
Section 26 05 43-8 paragraph 3.1.f states rigid steel conduit is be used and extended 10 feet beyond walks, driveway and roadways. Please identify the size and number of walks, driveways and roadways crossed for the installation of the communication duct bank.
One roadway with adjacent walkway (approx.. 40’) and one parking lot (approx. 50’), totaling approximately 90’
Section 26 05 13 Paragraph 3.1.H- 4 states Arc Proofing taping of medium voltage cable is required for cables not protected by conduit. Are conductors inside the switchgear considered to be protected or do we install arc proofing tape?
Once a conductor leaves a conduit it is considered not protected. Please provide Arc Proofing taping inside the switchgear.
Section 26 05 43 paragraph 3.4.B requires curves and bends to use rigid steel conduit. If conduit is in contact with the earth are we required to tape or used PVC Coated 90 elbows?
PVC Coated 90 elbows.
At the walk thru, it was noted an existing structure for noise control. Is the offeror required to remove this structure? If removed and NIST decides another structure is required for noise control, will the cost be handled by a change order?
This structure is to be removed. If another structure is required, it will be handled by change order or separate contract.
There are existing solar powered fixtures at the existing site. Will this be adequate lighting for the area? Do we include additional lighting? If so, please identify type, and number.
No additional lighting should be required
1333ND19RNB190009 Q & A
J.3 CDA-778802-rv002
PAGE 7 OF 57 1333ND19RNB1900090001
PAGE 8 OF 57 1333ND19RNB1900090001
PAGE 9 OF 57 1333ND19RNB1900090001
PAGE 10 OF 57 1333ND19RNB1900090001
PAGE 11 OF 57 1333ND19RNB1900090001
PAGE 12 OF 57 1333ND19RNB1900090001
PAGE 13 OF 57 1333ND19RNB1900090001
PAGE 14 OF 57 1333ND19RNB1900090001
PAGE 15 OF 57 1333ND19RNB1900090001
PAGE 16 OF 57 1333ND19RNB1900090001
PAGE 17 OF 57 1333ND19RNB1900090001
PAGE 18 OF 57 1333ND19RNB1900090001
PAGE 19 OF 57 1333ND19RNB1900090001
PAGE 20 OF 57 1333ND19RNB1900090001
PAGE 21 OF 57 1333ND19RNB1900090001
PAGE 22 OF 57 1333ND19RNB1900090001
PAGE 23 OF 57 1333ND19RNB1900090001
PAGE 24 OF 57 1333ND19RNB1900090001
PAGE 25 OF 57 1333ND19RNB1900090001
PAGE 26 OF 57 1333ND19RNB1900090001
PAGE 27 OF 57 1333ND19RNB1900090001
PAGE 28 OF 57 1333ND19RNB1900090001
PAGE 29 OF 57 1333ND19RNB1900090001
PAGE 30 OF 57 1333ND19RNB1900090001
PAGE 31 OF 57 1333ND19RNB1900090001
PAGE 32 OF 57 1333ND19RNB1900090001
J.4 QCDR-12230-1-rv0-1b
PAGE 33 OF 57 1333ND19RNB1900090001
J.5 QCDR-12230-2-rv1
PAGE 34 OF 57 1333ND19RNB1900090001
PAGE 35 OF 57 1333ND19RNB1900090001
PAGE 36 OF 57 1333ND19RNB1900090001
PAGE 37 OF 57 1333ND19RNB1900090001
PAGE 38 OF 57 1333ND19RNB1900090001
PAGE 39 OF 57 1333ND19RNB1900090001
PAGE 40 OF 57 1333ND19RNB1900090001
PAGE 41 OF 57 1333ND19RNB1900090001
PAGE 42 OF 57 1333ND19RNB1900090001
PAGE 43 OF 57 1333ND19RNB1900090001
PAGE 44 OF 57 1333ND19RNB1900090001
PAGE 45 OF 57 1333ND19RNB1900090001
PAGE 46 OF 57 1333ND19RNB1900090001
PAGE 47 OF 57 1333ND19RNB1900090001
PAGE 48 OF 57 1333ND19RNB1900090001
PAGE 49 OF 57 1333ND19RNB1900090001
PAGE 50 OF 57 1333ND19RNB1900090001
PAGE 51 OF 57 1333ND19RNB1900090001
PAGE 52 OF 57 1333ND19RNB1900090001
J.6 QCDR-12230-rv2
PAGE 53 OF 57 1333ND19RNB1900090001
PAGE 54 OF 57 1333ND19RNB1900090001
PAGE 55 OF 57 1333ND19RNB1900090001
PAGE 56 OF 57 1333ND19RNB1900090001
PAGE 57 OF 57 1333ND19RNB1900090001