1333ND19QNB680684_Specs.pdf

PDF 22 KB Posted

Attached to
TITANIUM WINDOWS & FEEDTHROUGH
Solicitation number
1333ND19QNB680684
Issued by

View the file

Other files

File Type Posted
A14345-1-CF-ZnSe.STEP STEP file
450-elec-thremo-feedthru-v2.stp STP file
A0269-4-CF-modSMB-long-v2.stp STP file
A12282-1-CF-MgFluoride.STEP STEP file
1333ND19QNB680684_RFQ.pdf PDF
A0269-4-CF-modSMB-long-v2.pdf PDF
450-elec-thremo-feedthru-v2.pdf PDF
A12282-1-CF.pdf PDF
A14345-1-CF.pdf PDF
VPZL-133Q-EUV.stp STP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

TITANIUM WINDOWS & FEEDTHROUGH

The Ion Storage Group Group requires custom titanium vacuum viewports and feedthroughs for a new Al+ clock experiement that is underconstruction.

Custom UHV vacuum viewports and feedthrough flanges. All CF flanges must be made of titanium, or titanium alloys as follows:

6” CF viewport, Mg fluoride glass, Qty. 1 1.33” CF viewport, ZnSe glass Qty. 6 1.33“ CF viewport, AR coated EUV fused silica Qty. 8 1.33” CF viewport, uncoated EUV fused silica, Qty. 8 4.5” CF custom multi-pin feedthrough flange, Qty. 1 (see attached drawing) 1.33” CF RF feedthrough, Qty. 4 (see attached drawing)

Inspection and Acceptance Government acceptance is expected to take longer than 7 days.

File details come from the government source that posted it.