Amendment 0002
Attachment 1 – Statement of Work 1333ND19QNB130105
Page 1 of 7 March 15, 2019
Statement of Work/Specifications
CNC Vertical Milling Center Machine
1. BACKGROUND
The National Institute of Standards and Technology (NIST), Fabrication Technology Office (FTO) provides a wide range of engineering, fabrication and technical services to support the creation of unique measurement instruments and scientific apparatus needed by researchers in the NIST's Measurement and Standards Laboratories. FTO provides the mission critical engineering and manufacturing expertise and equipment needed to produce specialized parts and subassemblies for the extraordinary variety of one-of-a-kind instruments conceived by NIST scientists and engineers.
FTO’s primary line of service is metal fabrication, mechanical engineering, and electromechanical assembly. This service is used to engineer and fabricate high precision components and assemblies for use in one-of-a-kind measurement instruments conceived by NIST scientists and engineers. FTO depends on its installed base of manufacturing technology to support the many service needs of its customers. This manufacturing technology base includes a full family of automated and conventional milling machines, lathes, grinders, electrical discharge machines, boring mills and other related manufacturing equipment.
FTO requires a Computer Numerically Controlled (CNC) Vertical Milling Center (VMC) to assist us in our fabrication efforts. The VMC uses rotating commercial cutting tools in various configurations to remove metal and other material from raw stock or work pieces from other fabrication processes. The work piece is fastened to a table on the machine and that table is moved and mechanical components of the machine are moved to cut the material in the desired location to yield the finished product with a high degree of accuracy. Tooling is spun about a vertical axis by a spindle.
2. OBJECTIVE:
The objective of this procurement is to acquire a new commercially available Vertical Milling Center machine (VMC) and the associated installation, warranty, and training.
3. SCOPE:
The Contractor shall provide a VMC with the following features/capabilities:
This specification covers a CNC VMC with other components, as described below. The VMC will be used for manufacturing and fabrication support services provided by the
NIST FTO.
The Contractor shall manufacture, deliver, install, and demonstrate the operation of the VMC. The VMC shall be installed at the NIST facility in Gaithersburg, Maryland.
Page 2 of 7 March 15, 2019
4. FEATURES
4.1 Machine Size
• VMC shall have a maximum installed height of no more than 103 inches
• VMC shall have a maximum installed length of 132 inches
• VMC shall have a maximum installed width of 132 inches
• VMC shall be capable to be shipped thru a doorway with a clear opening 64.5 in wide by 83 in tall to access Building 304 room #128
• VMC shall have a total weight of between 4,000 and 8,000 lbs
• VMC shall have an installed footprint of between 35 and 110 square feet with required accessories
4.2 Machine Construction
• VMC shall have a one-piece sturdy cast iron bed
• VMC to have heavy duty linear rails to prevent twisting and distortion and vibration during high speed or heavy machining
• VMC shall have each axis driven by heavy ball screws
• VMC shall have hardened and precision ground guideways, fully protected with stainless steel covers
• VMC shall have a minimum of 10 horsepower (HP)
• VMC shall operate on 205-235 volts (3 phase) power
4.3 Machine Capacity
• VMC shall have a minimum of 20” in X-travel
• VMC shall have a minimum of 15” in Y-travel
• VMC shall have a minimum of 12” in Z travel
• VMC to have a minimum table size of 24in x 15in
• VMC shall have a minimum nose to table of 4in or less
• VMC shall have a maximum nose to table of 16in or more
• VMC to have a minimum table capacity of 500lb
4.4 Machine Accuracy/Operation
• VMC shall have a repeatability of +/-.0004 or better in all axis at full stroke(VDI)
• VMC shall have a positioning accuracy of +/-.0004” or better in all axis(VDI)
• VMC shall have a X, Y, Z rapid traverse rates of at least 900 IPM each
4.5 Machine Controller
• VMC shall have visual programming templates
Page 3 of 7 March 15, 2019
• VMC shall include a post processor for Mastercam CAM software
• VMC shall have a minimum 1 GB memory with expansion capabilities
• VMC shall have common memory expansion slots (PCMCIA card or equivalent)
• VMC shall have USB port and Ethernet connection port
• VMC shall have a replaceable color LCD display at least 8.4”
• VMC shall have a tool monitoring system and rigid tapping capability
• VMC shall be compatible with current MTConnect systems or have provided software to remotely monitor machine operations in “real time”
4.6 Spindle
• VMC shall have a minimum 10,000 rpm spindle speed capability with programmable control of speed
• VMC shall produce a minimum spindle torque of 50 ft-lbs at 1450 rpms 35ft Lbs.
at 1,500 RPM
• VMC shall have coolant thru the spindle
• VMC shall achieve minimum spindle speed without a “speeder head” or additional gearbox-must be direct drive
4.7 Tool Changer
• VMC shall have a tool changer capable of storing a minimum of 20 tools.
• VMC to have a tool changer capable of handling CAT40 tool holders.
• VMC to have a tool changer capable of handling maximum tool weights of 8lbs
• VMC to have a tool changer capable of handling 2.7in diameter tools
• VMC to have a tool changer capable of handling at least 7.5in long tools
4.8 Additional Features and Components
• VMC to have a chip removal system
• VMC to have an automatic coolant refill system
• VMC to have high intensity work lighting
• VMC to have a coolant tank oil skimmer
• VMC to have non-contact tool probing package for tool length and diameter.
• VMC to have a programmable coolant nozzle
• VMC to have a minimum of a 40-gallon coolant tank with at least a 1/2 HP pump
• VMC shall include operation manual, maintenance manual, complete parts list, a 3-
D “.stp file” of assembled unit, and electrical schematics
5. INSTALLATION
Page 4 of 7 March 15, 2019
The contractor shall complete installation of the VMC within 180 days of award. NIST will supply any required air and electrical service as specified by Contractor. These specifications must be included with proposal. All transportation, rigging, and setup shall be the sole responsibility of the successful Contractor. The machine shall be delivered and installed in Building 304 Rm 128 at NIST, Gaithersburg, Maryland.
6. TRAINING
Initial training shall be provided by the Contractor, for up (2) NIST Technicians on the VMC. The training shall include instructions on
a) Machine construction
b) Routine maintenance
c) Use of Controller
d) Job Preparation
e) Programming of the machine
f) Sample test cuts of material
Initial training will be in Building 304 at NIST and completed within 30 days of installation.
The vendor will also make available an advanced training session for 2 NIST technicians either onsite or at a vendor training site within the USA. The Contractor shall submit a program of instruction for their proposed training with their response to this RFQ.
7. WARRANTY
The Control, Drives and Motors shall be warranted for a period of not less than 720 days after final acceptance of the machine by the Government. Machine Parts and Labor shall be warranted for a period of 365 days after final acceptance. The warranty period shall commence only after the machine has passed the performance tests and evaluations set forth in this document and the machine has been accepted by the Government. All parts, labor, travel, and other expenses required to repair any machine equipment shall be borne by the Contractor, and all repairs performed at no cost to the Government. Any repairs made by the Contractor to resolve any equipment problems discovered during the warranty period shall be warranted for an additional 365 days. 180 Days
8. PERFORMANCE TESTS
As part of the machine installations, the Contractor shall check and verify the accuracy of the machine and make any required adjustments or repairs to ensure compliance with the listed performance specifications.
Page 5 of 7 March 15, 2019
The Government reserves the right to perform such performance tests and evaluations as deemed appropriate by the Government to verify specified machine performance in accordance with the standards listed in this document within 30 days after final installation. Such tests and evaluations, if performed, will be conducted within the environment that the machine is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.
Contractor-specified values for performance parameters submitted as part of their response to the RFQ shall be subject to testing in accordance with ANSI/ASME B5.57 or ISO 230 standards, where applicable. VDI 3441 Standards
9. OPERATION TESTS
The machines shall be operated by the Contractor in accordance with the Contractor’s standard operating test procedure for warm-up and run-off checks within 30 days of completed installation. The run-off checks shall include tests of all mechanical and electrical functions of the machine and controls to determine proper functioning in each mode of operation provided. The machine shall be cycled continuously for a period of not less than four hours to check response to commands for all numerically controlled machine functions and auxiliary functions. The commands shall include positioning of each axis separately and in combination, feed rate changes, and checks of manual overrides. Should a malfunction occur, the cycle shall be restarted until a full four-hour cycle is successfully completed.
10. FAILURE OF TESTING/EVALUATION
The Contractor shall make repairs and adjustments to the machine should it fail any testing and evaluations. Repairs, adjustments, or modifications of the machine shall be completed within 30 days of initial testing. The 30 day evaluation period mentioned in Section 8 will restart after these repairs, adjustments, or modifications. The Government reserves the right to duplicate the tests specified above to determine acceptance.
11. SUMMARY OF DELIVERABLES
Deliverable Submission Deadline VMC Installation 180 days after award VMC Operational Testing 30 days after installation, 180 days after award VMC Training 30 days after installation, 180 days after award
12. GENERAL INFORMATION
Page 6 of 7 March 15, 2019
Security: NIST is a restricted campus. An identification badge is required for access for entry into buildings and shown to the armed Security Police when entering the campus.
Because of heightened security, Contractors who are planning to deliver, set-up, test and train the NIST staff shall provide the technical point of contract 48 hours prior to coming onto campus with the following information:
1) Company name
2) Names of all individuals
3) Country of Citizenship of all individuals* *For non-US Citizens, the following additional information will be required:
1) Title
2) Employer/Sponsor
3) Address
Failure to register will result in individuals being denied access to NIST, and subsequently, rescheduling the delivery, set-up, testing and training.
Contractors must pick up a Visitor's Badge at the Visitor's Registration Center located at the Main Gate (Gate A, off Bureau Drive). Please ensure all individuals bring photo identification or they will be denied access to the facility.
Under the REAL ID Act of 2005, agencies, including NIST, can only accept a state-issued driver’s license or identification card for access to federal facilities if issued by states that are REAL ID compliant or have an extension. Only Enhanced Driver’s Licenses (EDL) issued by the states of Michigan, Minnesota, New York, Vermont and Washington will be accepted for access to the NIST campus. These drivers’ licenses are easily identifiable by the American Flag on the face of the license. NIST currently accepts other forms of federally issued identification in lieu of a state-issued driver’s license, such as a valid:
Passport; Passport Card; DOD’s Common Access Card (CAC); Veterans ID; Federal Agency HSPD-12 IDs; Military Dependents ID; Transportation Workers Identification Credential (TWIC)
Identification Badges: Contractor employees shall comply with NIST identification and access requirements. The Contractor employee is responsible for absences due to expired identification and access documents. Each Contractor employee shall wear a visible identification badge provided by the NIST Security Office. The badge must show the full name, title, and if required by NIST, the words “Contractor” in front. The Contractor employee shall turn in the NIST identification badge and vehicle pass to the TPOC, COR, or Contracting Officer (CO) upon termination of their services under this contract.
Page 7 of 7 March 15, 2019
Vehicle Registration: All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver’s license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the NIST Security Office, at which time a NIST vehicle pass will be issued. The pass shall be displayed on the vehicle’s rearview mirror in accordance with instructions. The Contractor employee shall follow NIST procedures for removal and turn-in of the vehicle pass upon termination of services under this contract.