This Statement of Work outlines requirements for servicing and installing a Bauer dive compressor and bank system for NOAA's Marine Operations Center - Atlantic in Norfolk, VA. The contractor must service an existing Bauer Model IMVT120II/AP-460-E3 compressor (manufactured 2/2008), connect it to 230V three-phase power, and install a new three-cylinder bank system with fill station capable of filling both SCBA and SCUBA bottles to 5000 psi with regulated fill rates.

The scope includes installing three HC5000-3 5000psi type K cylinders with wall mounting, a basic fill panel with two fill positions, TRI-FILL/2 position station with quick connects, and associated fittings and valves. The contractor must also service/replace filters, service the oil/water separator, perform manufacturer-recommended maintenance, and connect water drain and fresh air lines. Period of performance is within one week of contract award, with flexibility of +/- 2 weeks by mutual agreement. The SOW includes detailed specifications for all required parts and components, including part numbers and quantities for items like gauges, valves, filters, and fittings from the OEM Bauer Compressors.

View the file

Other files

File Type Posted
Sol_1333MK25Q0040.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bauer Dive Compressor and Bank System Marine Operations Center – Atlantic

Statement of Work

November 26, 2024

Presented by:

LTJG Matthew Chonka

Deputy Chief of Operations Marine Operations Center – Atlantic

1. Introduction

Marine Operation Center – Atlantic (MOC-A) is a federal facility owned by the National Oceanic and Atmospheric Administration. The East and Gulf Coast Operations for the NOAA Fleet is located at this facility along with Atlantic Hydrographic Branch.

2. Scope

The purpose of this Statement of Work (SOW) is to detail requirements for the service and hook up to power one Bauer compressor. Supply and install a 3-cylinder bank system with fill station that will fill both SCBA and SCUBA bottles. When contract is completed, the facilities Bauer Compressor and Bank system should be ready to pump breathable air into SCUBA and SCBA cylinders at a max of 5000psi and a regulated fill rate.

3. Period of Performance:

The period of performance is within a week of awarding the contract.

Alternate dates for period of performance shall not exceed 2 weeks before or after the dates given here, except by mutual agreement. Contract may be canceled by KO without penalty due to lack of appropriated federal funds, unusual/unplanned operational needs. KO will provide notice of any changes at least 24 hours in advance.

4. Supplies, Services and Performance Standards

Service existing compressor and hook up to power (electricity).

Current Compressor is:

Bauer Compressor Model -IMVT120II/AP-460-E3 Serial # - 66101 Block # - F/7035/07 MFG Date – 2/2008 Phase – 3 Volts – 230 (the motor has been rewired for 230 volts)

Hook up to Electricity:

Three phase power is currently stubbed out into the compressors control panel and switched off at the both breakers. Electricity lines need to be hooked up.

Supply parts, install, service and hook up bank and manifold system.

A three-cylinder bank system to fill SCBA and SCUBA bottles need to be supplied and installed to operate with the current compressor.

This will include:

• 3x HC5000-3 – 5000psi- type K style cylinders (wall mounted) (3 X 5000 PSI UN STORAGE

CYLINDERS TO BE INSTALLED IN CONJUNCTION WITH A BFP PANEL WALL

MOUNTED WITH UNISTRUT & CLAMPS.)

o Basic fill panel BFP-2/4CASCADE - with two (2) fill positions.

Includes all necessary fittings, bank gauges, bank control valves, and 1/4" NPT female inlet connections for four cascade banks* o TRI-FILL/2 POSITION

TRI-FILL, high/low/SCUBA, quick connect fill station+ CFS5.5-2 ONLY

• PLU-0004

o PLU,HX HD PIPE;1/4"NPTM,ST,PLT.

Service/install needed:

• Mount filter tower and pipe into system o Replace filter o Service and install purification filter and coalesce.

o Replace filter tower if date of manufacture exceeds life expectancy of housing

• Service oil/water separator

• Service compressor according to manufactures recommended interval (which should include, belt, intake air filter, oil, etc.)

• Connect and route water drain line into approved collection container

• Connect and route fresh air hose to exterior of room

Ending product should be a functional SCBA and SCUBA fill station with two fill whips for SCUBA bottles with quick disconnects to adapt to fill SCBA bottles. The fill station will also include three bank cylinders, a manifold, fill station panel, air purification and the serviced Bauer compressor. This system should be able to fill a tank to 5000psi of breathable air with a regulator to regulate fill rates of each cylinder.

Reference pictures:

If a unit needs to be replaced a fair market quote will be given for the same or similar unit.

5. Contracting Officer and Technical Representative:

The Contracting Officer (KO) is the sole person authorized to make or approve any changes in any of the requirements of this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price.

6. Technical Point of Contact

The Contracting Officer may communicate through, and delivery of services will be coordinated through, the Technical Point of Contact. Close coordination is required to ensure timelines are corrected against any last minute updates. If changes are needed, please contact the Technical Point of Contact as soon as possible. The Technical Point of Contact will be:

Item Quantity

1.00000

002 1.00000

1.00000

1.00000

The Follow list of part was supplied to us from the OEM , Bauer Compressors, as to what is needed to get the compressor unit installed, serviced and have a bank system installed.

This list may not included all parts and service that is needed. This list may also included more parts that are needed and may need to be eliminated.

Default TRI-FILL/2 POSITION Rev NS

U/M EA

TRI-FILL, high/low/SCUBA, quick connect fill station+ Default

FEE-0014

U/M EA

SERVICE LABOR

Facility / Part / Rev / Description / Details Default HC5000-3 Rev NS

U/M EA

3 X 5000 PSI UN STORAGE CYLINDERS TO BE

INSTALLED BY BAUER IN CONJUNCTION WITH A

BFP PANEL WALL MOUNTED WITH UNISTRUT &

CLAMPS.

Default BFP-2/4CASCADE Rev NS

U/M EA

Basic fill panel with two (2) fill positions.

Includes all necessary fittings, bank gauges, bank control valves, and 1/4" NPT female inlet connections

005 1.00000

006 1.00000

2.00000

1.00000

1.00000

Default PLU-0004 Rev 00

U/M EA PLU,HX HD PIPE;1/4"NPTM,ST,PLT

Default A-120II-F7-AB1 Rev 000

U/M EA 1000 HOUR MAINTENANCE KIT

Default 080145 Rev 00

U/M EA

CBR,SEC;27",6000 PSI,4:1

Default

FEE-0015

U/M EA

SERVICE PARTS

Maintenance Kit A-120II-F7-AB1 QTY 1 Purification Chamber 080145 QTY 1 Purification Filter 060037 QTY 1 ACD Rebuild Kit 064009-V001/V002-A1 QTY 1 ACD Solenoid N27099 QTY 1 ACD Coil N27288 QTY 1 Gasket N04616 QTY 1 Gasket N02320 QTY 1 Final Separator 079416 QTY 1 Label LBL-0887 QTY 1 Condensate Filter ELM-0210 QTY 1 Oil Pressure Switch SWT-0256/SET-36 QTY 1 Press.

Gauge GAG-0006W QTY 2 Press. Gauge GAG-0008W QTY 1 Press. Gauge GAG-0009W QTY 2 Check Valve VAL-0007 QTY 2 Gasket N04499 QTY 5 Plug PLU-0004 QTY 1

PMV VAL-0053/SET-2200 QTY 1

Final Press. Switch SWT-0282 QTY 1 1st RV

081802 QTY 1

2nd RV 072935 QTY 1 Final RV

VAL-0169/SET (4800 PSI) QTY 1

Default FREIGHT Rev 000

U/M EA FREIGHT/SHIPPING

Customer Part : .00

1.00000

1.00000

1.00000

1.00000

1.00000

1.00000

1.00000

1.00000

1.00000

1.00000

020 Default GAG-0006W Rev A

U/M EA 200PSI/BAR,2.5",1/4"CBM,SILC

2.00000

Default LBL-0887 Rev B

U/M EA LBL,CAUTION,OIL/WATER SEP 079416

Default ELM-0210 Rev 00

U/M EA ELM,FLR,WIRE MESH;COND SEP

Default SWT-0256/SET-36 Rev -

U/M EA SWT,PRES;25-125 PSI,SET TO 36 PSI

Default N04616 Rev 00

U/M EA

GKT,FTG;21.5X28.7X2.5,R1/2,NBR

Default N02320 Rev 00

U/M EA

RNG,O;21.95X1.78,FKM,75DURO

Contract Name GSA CONTRACT GS 07FDefault 079416

U/M EA

SEP,OIL/WATER;COALESC,420BAR

Default N27099

U/M EA

VAL,2WAY;60 BAR,NO,RP1/2F,W/O COIL

Default N27288

U/M EA

COIL,110-115VOLT;60BAR,

Default 060037A Rev F

U/M EA CTG,SECURUS;MS/MS/AC/MS/HP27" (BCI)

Customer Part : 060037

Default 064009-V001/V002-A1 Rev 000

U/M EA MAINTENANCE KIT,64009 ACD VAL V1/2

2.00000

2.00000

5.00000

1.00000

1.00000

1.00000

1.00000

1.00000

4.00000

1.00000

Default ADP-0020 Rev 00

U/M EA ADP,PIPE;BSPP3/8"M X 1/4"NPTF,STEL

Default CON-0278 Rev 00

U/M EA CON;8MM S TUBE X RP3/8"M

Default 072935

U/M EA

SAFETY VALVE, 60 BAR

Default VAL-0169/SET-4800 Rev -

U/M EA VAL,SAFETY;SET AT 4800PSI WITH TAG

Default SWT-0282 Rev 000

U/M EA SWT,PRES;SOLID STATE,0-6K,1/4NPT

Default 081802

U/M EA

VAL,SAFETY;9.9 BAR

Default VAL-0007 Rev 00

U/M EA VAL,CHECK;1/4NPTF IN X 1/4NPTM

Default N04499 Rev 00

U/M EA

GKT,FTG;16.7X24X1.5,R3/8",NBR

Contract Name-GSA CONTRACT GS-07F- 195GA E Dt 12 31 2024Default VAL-0053/SET-2200 Rev -

U/M EA VAL,PMV;SET AT 2200PSI WITH TAG

Default GAG-0008W Rev A

U/M EA 1500PSI/BAR,2.5",1/4"CBM,SILC

Default GAG-0009W Rev B

U/M EA 10000PSI/BAR,2.5",1/4"CBM,SILC

1.00000

1.00000

035 Default

OIL-0024/GAL

1 GAL OF SYNTHETIC

OIL

Re v

00 U/M GAL

1.00000

036 Default CON-0030

CON;1/4" TUBE X 1/4"

NPTM

Re v

00 U/M EA

1.00000

037 Default BLT-0078

BOLT,U;VIBRATION

DAMP,3-1/2" PIPE

U/M EA

1.00000

038 Default TUB-R-0094

TUB,RND 316SS;1/4"OD X

.049" WALL

Re v

A U/M IN

420.00000

039 Default UNN-0003

UNN,TUBE;1/4"

Re v

00 U/M EA

4.00000

Default CON-0041 Rev 00

U/M EA CON;6MM S TUBE X RP1/4"M MGS HLOK

Default MTS-0373 Rev A

U/M EA MTS,PURIFIER CHAMBER;SNGII-LT

Default N01316 Rev 00

U/M EA

GKT,COPPER;13X20X1.5,DIN 7603,G1/4

Contract Name-GSA CONTRACT GS-07F- 195GA E Dt 12 31 2024

Parts list.pdf
Table 1

File details come from the government source that posted it. Updated .