About this file

This document is Amendment 0001 to solicitation 1333MH26Q0012, issued by NWS Field Delegates (National Weather Service) on August 6, 2026. The amendment provides consolidated responses to six questions and clarifications submitted by interested parties regarding air conditioning unit installation services.

The responses clarify key technical and operational requirements: designated HVAC subcontractor certifications are acceptable for satisfying manufacturer authorization and training credential requirements under a prime/subcontractor teaming structure (R1); R-454B refrigerant is acceptable for the Mitsubishi GX Series units, in addition to R-410A (R2); no architectural drawings are available for the plywood false columns, with paint code ECC-53-1 BEHR Mown Hay specified for repairs (R3); existing electrical service includes dedicated breakers and disconnect boxes for the split-unit AC systems, with the contractor responsible for verifying sufficiency (R4); the existing Sanyo AC units utilize gravity condensate drains rather than functional condensate pumps (R5); and excusable, non-compensable schedule extensions will be granted for weather-related delays mandated by the Technical Point of Contact in accordance with FAR 52.212-4(f), recognizing Hilo, Hawaii's frequent high-rainfall conditions and the 90-day period of performance requirement (R6). Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Air conditioning system replacement - Hilo, HI, newest first.
File Type Posted
Sol_1333MH26Q0012.pdf PDF
WD_2015-5691_rev_27.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

KATY REANO

See continuation page

NWS Field Delegates

601 EAST 12TH STREET SUITE 1746

KANSAS CITY MO 64106

NWS-FD

1333MH26Q0012

08/06/2026

08/06/2026

1 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

1333MH26Q0012/0001

Amendment 0001

The purpose of this amendment is to provide

Responses to Questions received.

The following questions and or clarifications requests were received from various interested parties. All questions and clarifications have been consolidated. Questions are denoted by “Q” and the response is denoted by “R.”

Q1: Prime/Subcontractor Teaming and

Manufacturer Authorization: The Addendum to RFO

52.212-1, Section 6, Item 2 requires the

"Quoter" to provide written documentation from the air conditioning manufacturer stating the

Quoter’s authorization to install the equipment and eligibility to obtain the manufacturer's warranty. Additionally, SOW Section 3.4 requires the "contractor" to be certified by the AC manufacturer. Under a

Prime/Subcontractor teaming structure where the

Prime provides complete administrative, compliance, and contract management oversight, will the Government accept the manufacturer authorization, certifications, and training credentials of our designated technical HVAC subcontractor to fully satisfy these requirements?

R1: Yes, the designated HVAC subcontractor / installers certifications are acceptable.

Q2: Refrigerant Compatibility and EPA Phase-Out

Compliance: SOW Section 2.2(a) specifies the preferred equipment as the Mitsubishi GX Series

MUZ-GX30NL/MSZ-GX30NL (or equivalent). The

Mitsubishi GX Series operates natively on

R-454B refrigerant, yet the subsequent SOW requirement states that the "Refrigerant shall be R-410A or other that is commonly acceptable". Given the ongoing Federal EPA phase-out of R-410A in new residential and light commercial split-system air conditioners, will the Government clarify if R-454B is acceptable and preferred for the new units to ensure long-term regulatory compliance and maximize system efficiency?

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

R2: R454-B refrigerant is acceptable.

Q3: Structural and Architectural Details for

False Columns: SOW Section 2.2(b) notes that all refrigerant lines must run through exterior chases in false columns, requiring the contractor to open, re-enclose, and repair these columns to match their original condition. Are architectural drawings or structural detail sheets available for these false columns? Additionally, can the Government provide any specific material, stucco, or paint matching requirements to ensure repairs meet the facility's structural and aesthetic standards?

R3: No architectural drawings are available for the false columns which are constructed of plywood. See picture in solicitation. Paint code is ECC-53-1 BEHR Mown Hay, exterior, semi gloss.

Q4: Existing Electrical Infrastructure

Capacity: SOW Section 2.2 requires the contractor to verify the existing electrical service to ensure a proper and safe installation of the new AC units. To prevent latent site challenges, can the Government confirm if the existing electrical panel has sufficient spare breaker spaces and rated amperage to support the dual 208V, 60Hz, single-phase 30,000 BTU systems without requiring an electrical service or panel upgrade? If an upgrade is determined necessary, will that be treated as a Government responsibility or within the contractor's scope?

R4: There are dedicated breakers for the existing split unit ACs in the circuit breaker panel. There are service disconnect boxes for each unit outside. See picture in solicitation.

Q5: Condensate Management and Drain

Configuration: SOW Section 2.2(b) states that the contractor must provide and install a condensate pump with a high-water level switch

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

"(if necessary)". To help offerors construct precise and equitable pricing, can the

Government clarify if the existing Sanyo SOW units utilize gravity condensate drains, or if they are currently equipped with functional condensate pumps?

R5: The existing Sanyo ACs utilize a gravity condensate drain.

Q6: Weather Delays and Period of Performance

Adjustments: SOW Section 3.1 states that installations may not be permitted during upcoming weather events, and Section 4.0 establishes a strict 90-day Period of

Performance. Given that Hilo, Hawaii experiences frequent high-rainfall weather, if severe weather events or operational stand-downs are mandated by the Technical Point of Contact (TPOC), will the Government grant excusable, non-compensable schedule extensions in accordance with FAR 52.212-4(f)?

R6: Yes

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .