About this file

This document is Amendment 2 to a Request for Quote (RFQ) for federal contract 1333MF26Q0087, issued by NOAA NMFS Field Delegates. Amendment 2, effective August 20, 2026, clarifies that the scope requires replacement of an Automatic Transfer Switch (ATS) controller only—not the switch itself—and extends the offeror due date from September 7, 2026 to September 11, 2026, both at 4:30 PM EDT. A mandatory site visit is scheduled for September 8, 2026 at 2:00 PM CST at the NOAA NMFS Southeast Fisheries Science Center, Galveston Laboratory (4700 Avenue U, Galveston, Texas 77551), with attendance confirmation required via michael.cordova@noaa.gov. Questions must be submitted to contracting officer shawana.randolph@noaa.gov by 10:00 AM EST on September 9, 2026.

The Statement of Work (Version 9.4.26) specifies that the contractor shall remove and replace the defective Eaton ATC 300+ controller (Model ATC3C2X40400XDU, Serial 044447) with a new 400-amp, 480-volt ATS controller rated for the facility's electrical service. The work includes equipment removal and disposal, electrical connections and integration with utility power and generator systems, component installation, comprehensive testing and commissioning, and on-site staff training. All work must comply with National Electrical Code (NEC), OSHA standards, and local codes; be performed at the Galveston Laboratory; and be completed by December 31, 2026. The contractor is responsible for permits, inspections, and associated fees. Eaton is the preferred manufacturer. The contractor must submit invoices through the U.S. Department of Treasury's Invoice Processing Platform (IPP) at https://www.ipp.gov, with all payments submitted in arrears per 31 U.S.C. § 3324. Contractor personnel require REAL ID-compliant identification or acceptable alternatives for facility access and may need NOAA Personal Identity Verification (PIV) credentials for unescorted access.

View the file

Other files for this federal contract opportunity

Other files attached to Galveston Automatic Transfer Switch Replacement, newest first.
File Type Posted
Sol_1333MF26Q0087_Amd_0001.pdf PDF
Sol_1333MF26Q0087.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1333MF26Q0087 Amendment 2 provides an updated Statement of Work (Version 9.4.26) that clarifies the scope is to replace the transfer switch controller and not the switch itself, a schedule site visit is added and questions and answers are uploaded. The offeror due date is changed from Sep 07, 2026 4:30 PM EDT to Sep 11, 2026 4:30 PM EDT Statement of Work changes are highlighted in yellow.

The CLIN description is also updated to notate the controller is being replaced.

Site Visit Site visit is scheduled for Wednesday September 8, 2026 at 2:00pm CST. Prospective site visit attendees need to contact michael.cordova@noaa.gov to confirm attendance prior to arrival. Meet at NOAA, NMFS Southeast Fisheries Science Center, Galveston Lab campus located at: 4700 Avenue U, Galveston, Texas 77551 . Attendees should arrive at least 10 minutes prior to start time. The site tour will begin promptly at 2:00pm and should be less than 60 minutes.

Attendees must park along the Maintenance Building in unmarked spaces near the fence. All personnel should arrive 10 minutes prior to sign-in at bldg 307.

Prospective attendees shall not ask any questions during the site visit, but should capture all questions and email them to the Contracting Officer, shawana.randolph@noaa.gov, by 10am EST 9/9/2026. Questions received after this time can not be answered. Any substantial Q&A will be posted as an Amendment to the solicitation. Vendors should monitor SAM.gov for any updates.

Questions and Answers 1333MF26Q0087

Responses are in blue:

1. If you wish us to quote the actual part, we would need a part number, please. Or a picture of the nameplate of the existing unit would be extremely helpful as well.

Make: Eaton ATC 300+ Model #: ATC3C2X40400XDU Serial Number #: 044447

2. There is no detail in the attachment about the ATS itself. Can you please provide the amperage, voltage, cabinet, bypass/non-bypass, SER rated, etc.?

AMPS: 400

Volts: 480 Cabinet # 478C642H01

3. I will need more details on what is existing to be able to provide pricing. Do you have the serial # off of the existing ATS that is being replaced? Are there any one-lines or specifications available?

Make: Eaton ATC 300+ Model #: ATC3C2X40400XDU Serial Number #: 044447

Line drawings or blue prints indicating routing of power lines into the campus are not provided. They have details about the critical infrastructure on the campus and require security review and approval.

4) Please confirm the required ATS configuration, including transition type, service-entrance rating, and whether a 3-pole or 4-pole switched-neutral arrangement is required.

5) The RFQ states that the contractor shall remove and dispose of the existing ATS and “associated switchgear.” Please clarify which equipment is included in this scope and identify what must be removed, replaced, modified, or reconnected.

The contractor will remove the defective transfer switch and remove from the campus all packing material, defective parts that will be replaced (defective switch gear) that is associated with the project.

6) Please provide the maximum allowable electrical shutdown duration, any required outage windows, and whether temporary power is required during the replacement.

The transfer switch that is to be replaced provides power to the Maintenance Building, Boiler and AC Control Room. When power is cut for the replacement of the defective equipment the campus will be without Air Conditioning. Coordination with the Campus POC (Michael Cordova) will have to be made in advance so that staff members can be diverted from the campus. Ideally work can be accomplished either during after hours (starting at 5:00pm, weekend or non-campus work day. With coordination the interruption of the day to day work can be minimalized.

10) If not shown on the available drawings, please provide the available fault-current information at the ATS location so the appropriate SCCR/WCR can be selected. See provided/uploaded pictures

11) Please confirm whether the existing power feeders and control wiring are to be reused, modified, or replaced. All existing serviceable items can be reused if determined to be serviceable

12) Please confirm whether the awarded contractor is responsible for permits, inspections, and associated fees. Contractor must coordinate all permits, inspections, and associated fees

13) Please provide available generator information, including manufacturer, model number, kW/kVA rating, voltage/phase, and control/interface requirements.

Generac Generator data tags attached provided/pictures uploaded

14) Please provide photographs of the existing ATS and associated equipment, including: All provided/pictures uploaded

- Full front view of the ATS/switchgear

- ATS nameplate

- ATS interior, if safely accessible and permitted

- Conduits/cables entering and leaving the equipment

- Wider electrical room/equipment arrangement

- Generator nameplate

15) Please provide any available electrical drawings, one-line diagrams, equipment schedules, or other documentation for the existing ATS, associated switchgear, generator interface, and electrical distribution system. See provided/pictures uploaded

16) Is there a preferred manufacturer, basis-of-design, or approved manufacturer list for the new ATS and associated equipment?

Eaton is preferred

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

SHAWANA RANDOLPH

See continuation page

NMFS Field Delegates

601 EAST 12TH STREET SUITE 1746

KANSAS CITY MO 64106

NMFS-FD

1333MF26Q0087

08/20/2026

08/20/2026

1 7

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

1333MF26Q0087/0002

NOTICE: THE GOVERNMENT DOES NOT ACCEPT

RESPONSIBILITY FOR NON-RECEIPT OF QUOTES. IT

IS THE CONTRACTOR’S RESPONSIBILITY TO REQUEST A

CONFIRMATION OF THE QUOTE RECEIPT.

Vendor SAM UNIQUE ENTITY ID

CAGE CODE ____________

OFFEROR MAY SUBMIT THE QUOTE ON THIS SF-18 FORM

OR THEIR OWN COMPANY FORM.

See 52.228-13 Alternative Payment Protections, a Irrevocable Letter of Credit WILL BE REQUIRED

UNLESS YOUR QUOTE IS UNDER $35K.

Change Item 0001 to read as follows(amount shown is the obligated amount):

0001 Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary to remove and replace the existing Automatic Transfer Switch

(ATS) controller at the NOAA NMFS Galveston

Laboratory in accordance with the revised

Statement of Work dated 09.04.2026

Period of Performance

The period of performance shall be from date of award through 12/31/2026. All work shall be coordinated with the Technical Project Lead.

Place of Performance

All work shall be performed at:

NOAA NMFS Galveston Laboratory

4700 Avenue U.

Galveston, TX

1333MF26Q0087 0002

Amendment 2 provides an updated Statement of Work (Version 9.4.26) that clarifies the scope is to replace the transfer switch controller and not the switch itself, a schedule site visit is added and questions and answers are uploaded. The offeror due date is changed from Sep 07, 2026 4:30 PM EDT to Sep 11, 2026 4:30 PM EDT Statement of Work changes are highlighted in yellow. The CLIN description is also updated to notate the controller is being replaced.

I. Site Visit Site visit is scheduled for Wednesday September 8, 2026 at 2:00pm CST. Prospective site visit attendees need to contact michael.cordova@noaa.gov to confirm attendance prior to arrival.

Meet at NOAA, NMFS Southeast Fisheries Science Center, Galveston Lab campus located at: 4700 Avenue U, Galveston, Texas 77551 . Attendees should arrive at least 10 minutes prior to start time. The site tour will begin promptly at 2:00pm and should be less than 60 minutes. Attendees must park along the Maintenance Building in unmarked spaces near the fence. All personnel should arrive 10 minutes prior to sign-in at bldg 307.

Prospective attendees shall not ask any questions during the site visit, but should capture all questions and email them to the Contracting Officer, shawana.randolph@noaa.gov, by 10am EST 9/9/2026.

Questions received after this time can not be answered. Any substantial Q&A will be posted as an Amendment to the solicitation. Vendors should monitor SAM.gov for any updates.

Section III - Description/Specifications

Summary of Clause Changes:

Clause STATEMENT OF WORK is incorporated as follows:

STATEMENT OF WORK (SOW)

STATEMENT OF WORK

Version 9.4.26 National Oceanic and Atmospheric Administration (NOAA)

NOAA FISHERIES

Southeast Fisheries Science Center (SEFSC) Galveston Laboratory Automatic Transfer Switch (ATS) Controller Replacement http://sam.gov/

I. Background/Overview:

The NOAA NMFS Galveston Laboratory, located at 4700 Avenue U., Galveston, TX, supports mission-critical fisheries research, data collection, and laboratory operations essential to NOAA Fisheries’ mission. Continuous electrical power is required to sustain laboratory systems, protect sensitive equipment, preserve scientific samples, and maintain safe working conditions.

The existing Automatic Transfer Switch (ATS) controller has reached the end of its service life and requires replacement to ensure reliable transition between utility power and emergency generator power. Failure of this system could result in disruption of operations, loss of research data, and potential damage to critical infrastructure.

This requirement is being pursued to replace the existing ATS controller with a modern, fully functional system that meets current electrical codes, safety standards, and operational requirements.

II. Scope of Work The Contractor shall provide all labor, materials, equipment, tools, supervision, and technical expertise necessary to remove and replace the existing Automatic Transfer Switch (ATS) controller at the NOAA NMFS Galveston Laboratory. The work includes installation, integration, testing, commissioning, and training to ensure a fully operational system that provides seamless transition between utility and generator power and supports uninterrupted facility operations.

III. Tasks

• Task 1 – Equipment Removal and Installation

The Contractor shall remove and properly dispose of the existing Automatic Transfer Switch (ATS) controller in accordance with applicable regulations and environmental requirements. The Contractor shall supply and install a new ATS controller that is properly sized and rated to match the facility’s existing electrical service requirements. All installation activities shall be performed in accordance with manufacturer specifications, industry standards, and applicable codes to ensure safe and reliable operation.

• Task 2 – Electrical Connections and Integration

The Contractor shall complete all necessary electrical connections between the ATS controller and the facility’s utility power source, emergency generator system, and load distribution system. The Contractor shall install and integrate a three-position selector switch (OFF/MANUAL/AUTO) to allow for operational flexibility and manual control when required. All wiring, terminations, grounding, and bonding shall comply with the National Electrical Code (NEC) and all applicable local and federal requirements to ensure safe and proper system functionality.

• Task 3 – Component Installation

The Contractor shall install all required components necessary for the proper operation of the ATS system. This includes, but is not limited to, control logic boards, solenoid mechanisms, protective enclosures, and safety covers. All components shall be installed, configured, and tested to ensure compatibility with the overall system and to provide safe, efficient, and reliable performance under normal and emergency operating conditions.

• Task 4 – Site Requirements and Compliance

The Contractor shall verify that the installed ATS controller meets the amperage and capacity requirements of the facility’s existing electrical service. All work shall be performed in full compliance with the National Electrical Code (NEC), local building and electrical codes, OSHA safety standards, and any other applicable regulations. The Contractor shall maintain a safe work environment at all times and ensure that all personnel follow appropriate safety procedures throughout the duration of the project.

• Task 5 – Testing and Commissioning

The Contractor shall perform comprehensive testing and commissioning of the installed ATS system to ensure proper functionality. This shall include verification of automatic transfer operations, generator start and stop functionality, and proper load transfer between power sources. The Contractor shall also verify the operation of all system protection features, including low oil pressure shutdown, high coolant temperature shutdown, and overspeed protection. All testing results shall be documented, and any deficiencies identified during testing shall be corrected prior to final system acceptance.

• Task 6 – Documentation and Training

The Contractor shall provide complete operation and maintenance manuals for the installed ATS system, including all manufacturer documentation and system-specific information. The Contractor shall also provide on-site training to Government maintenance personnel to ensure proper understanding of system operation, controls, and basic troubleshooting procedures. Additionally, the Contractor shall provide written reports identifying any defective, damaged, or non-compliant equipment discovered during installation or testing.

IV. Period of Performance The period of performance shall be from date of award through 12/31/2026. All work shall be coordinated with the Technical Project Lead (identified below).

V. Place of Performance All work shall be performed at:

NOAA NMFS Galveston Laboratory 4700 Avenue U.

Galveston, TX

VII. Deliverable Schedule Deliverable Description Quantity/Media Completion Due Date

Installation Completion Fully installed ATS Controller 1 Within PoP

Testing Report Functional and safety testing results PDF Upon completion

O&M Manuals Manufacturer manuals and system documentation Electronic + Hard Copy At project closeout

Training On-site training for staff 1 session Prior to acceptance Deficiency Report Report of identified issues PDF As required

VIII. Government-Furnished Resources The Government will provide access to the facility, coordination for scheduling and outages, and any available existing system documentation. The Contractor shall provide all labor, materials, tools, and equipment required to perform the work. Contractor personnel will perform work on-site and will require access to NOAA facilities and may be subject to escort or badging requirements.

IX. Security Requirements Contractor personnel performing work under this requirement will require physical access to NOAA facilities. All contractor personnel must comply with Department of Commerce and NOAA security policies governing access to Federal facilities.

In accordance with the REAL ID Act of 2005, beginning May 7, 2025, individuals seeking access to certain Federal facilities must present a REAL ID-compliant driver’s license or identification card, or an acceptable alternate form of identification such as a U.S. passport, military identification card, or other federally approved identification credential.

State-issued identification that is not REAL ID compliant may not be accepted for access to Federal facilities requiring identification after this enforcement date.

Contractor personnel must present valid identification that meets Federal security requirements when entering NOAA facilities. Personnel who do not possess a REAL ID-compliant credential must provide an acceptable alternate identification document as defined by Federal security policy.

Contractor personnel may also be required to obtain a NOAA facility access badge or Personal Identity Verification (PIV) credential in accordance with Department of Commerce identity proofing procedures prior to being granted unescorted access to Federal facilities.

Failure to comply with identification and credentialing requirements may result in denial of facility access.

X. Applicable Standards All work shall comply with applicable industry standards, including the National Electrical Code (NEC), OSHA regulations, local building codes, and manufacturer installation requirements.

XI. CONTRACTORS INVOICE

INVOICES MUST BE SUBMITTED ONCE ALL SERVICES ARE COMPLETED

Per NAM 1330-52.232-71 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (FEB 2023) The Contractor must submit payment requests electronically through the U.S. Department of the Treasury's Invoice Processing Platform System (IPP). The Contractor must use the IPP website to register, access, and submit payment requests. The IPP website address is https://www.ipp.gov.

"Payment request" means any request for contract financing payment or invoice payment to the Contractor. To be considered proper, invoices must be prepared in accordance with, and contain all elements specified in, the contract payment clause (e.g., FAR 52.212-4(g), FAR 52.232-25(a)(3), FAR 52.232-26(a)(2), FAR 52.232-27(a)(2)). All invoices are to be submitted in arrears per 31 U.S.C. § 3324.

Advance payments are prohibited by 31 U.S.C. § 3324, which provides that, except as provided by a specific appropriation or other law, “a payment under a contract to provide a service or deliver an article for the United States Government may not be more than the value of the service already provided or the article already delivered.” The primary purpose of 31 U.S.C. § 3324 is to protect the Government against the risk of nonperformance (or refusal to refund moneys) by the contractor after receipt of payment. See 22 Comp. Gen. 834, 835 (1946). In its simplest terms, the statute prohibits the Government from paying for goods before they have been received or for services before they have been rendered.

https://www.ipp.gov/

The Contractor must include the following documents as attachments to payment requests submitted through the IPP: NONE If the Contractor is unable to comply with the requirement to submit payment requests through the IPP due to a threat to national security; a matter of unusual or compelling urgency; or because the political, financial, or communications infrastructure of a foreign country does not support access to the IPP, the Contractor must request an exception in writing. Contact the Contracting Officer for more information about requesting an exception. (End of Clause)

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .