Statement of Work: National Weather Service Topeka Snow Removal
This Statement of Work details snow removal services required for the National Weather Service Topeka Weather Forecast Office located at 1116 NE Strait Ave, Topeka, KS 66616-1667. The contract covers a base year from December 14, 2026, through December 13, 2027, with four optional renewal years extending through December 13, 2031. The contractor must provide all personnel, materials, tools, equipment, and supplies necessary to perform snow removal services during peak snow months (November through March), with exact service dates determined at award within a +/- two-week window. Service Contract Labor Standards Act compliance is mandatory.
Snow removal services are triggered when two or more inches of snow falls or upon request by the Meteorologist-In-Charge, with a maximum four-inch accumulation threshold permitted. Response time for removal must be within two hours of request. Required work includes clearing the main facility parking lot and entrance drive (excluding areas with parked vehicles), all paved surfaces, sidewalks to building entry ways, sidewalks to instrument equipment and storage/generator buildings, application of non-harmful ice-melting granules after snow removal, and plowing to ensure trash removal vehicle access to the dumpster. The contractor bears responsibility for all damages, injuries, or losses resulting from its negligent performance. Monthly billing must occur through IPP.gov in arrears. Government points of contact including the MIC, Technical POC, and Invoice Approver POC will be determined at contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Weather Service (NWS) Statement of Work (SOW)
Topeka, KS Weather Forecast Office Snow Removal
Scope:
The Contractor must provide all personnel, materials, tools and supervision for satisfactorily managing and performing programs for snow removal as specified herein. All equipment, materials, and supplies must be furnished by the contractor, unless otherwise specified, and properly stored in the area designated by the Meteorologist-In-Charge (MIC) or designated representative.
Location:
National Weather Service Topeka Weather Forecast Office 1116 NE Strait Ave Topeka, KS 66616-1667
Period of Performance:
** Dates are estimated, exact dates +/- 2 weeks and determined at time of award. Snow removal services are expected between the peak snow months of November through March. **
Base Year: 12/14/2026 – 12/13/2027 Option Year 1: 12/14/2027 – 12/13/2028 Option Year 2: 12/14/2028 – 12/13/2029 Option Year 3: 12/14/2029 – 12/13/2030 Option Year 4: 12/14/2030 – 12/13/2031
Service Contract Labor Standards act applies and is the Contractor’s responsibility to be in compliance with this requirement.
Description of Work:
The Contractor must perform snow removal when two (2) or more inches of snow falls, or upon request by the MIC. The Contractor must not allow snow to accumulate over four (4) inches.
When requested, the snow removal must be performed within two hours of the request. Snow removal must include:
1. The parking lot of the main facility, including entrance drive and all paved surfaces, excluding the locations where vehicles are parked at the time when work is performed. If the Contractor is requested to come and plow, we must request parked vehicles be moved to plowed areas to allow thorough snow removal.
2. The sidewalks to all entry ways of the building. Also, the sidewalk to the instrument equipment and to the storage/generator building.
3. Once snow has been removed from designated sidewalks and around all exterior doors, the Contractor must apply an application of ice melting granules that will not kill grass and/or shrubs or damage concrete and asphalt surfaces.
4. The snow must be plowed to allow trash removal vehicles access to the trash dumpster.
Responsibility for Loss, Damage, Death, or Injury:
Except as otherwise provided by law, the Government will not be responsible for the loss of or damage to the contractor's equipment, or death of or injury to the contractor's personnel, or for the death of, or injury to persons or for damages to property resulting from contractor's negligent performance under this contract. The contractor must be responsible for all damages to persons or properties that occur as a result of his fault or negligence, or the fault or negligence of his employees or agents, while performing the requirements of this contract.
Inspections and Acceptance:
If any of the services do not conform to the contract requirements, the Government may require the contractor to perform the services again in conformity with the contract requirements, at no increase in contract amount. If the defects in services are not corrected by performance, the Government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
If the contractor fails to expeditiously take the necessary action to ensure that further performance will be in conformity with contract requirements, the Government may terminate the contract for default.
Invoicing:
The Contractor must bill in IPP.gov on a monthly basis in arrears for the service provided.
Government Point of Contacts:
MIC: To be determined at award Technical POC (person who will review quotes or can answer questions): To be determined at award Invoice Approver POC: To be determined at award