This is a Statement of Work (SOW) for snow removal services at the National Weather Service Chicago/Romeoville Weather Forecast Office located at 250 George J Michas Drive, Romeoville, Illinois. The contract period runs from December 1, 2026 through November 30, 2027 as the base year, with four option years extending through November 30, 2031. Services are anticipated during November through April of each year. The contractor must provide all personnel, materials, tools, equipment, and supplies necessary to perform snow removal operations.

Snow removal shall be performed when two or more inches of snow accumulates or upon request by the Meteorologist-In-Charge, with a maximum four-inch accumulation threshold. When requested, work must be completed within two hours. Services include plowing the main facility parking lot and entrance drive (excluding areas with parked vehicles), clearing sidewalks to building entry ways and exterior equipment locations, applying ice-melting granules that are safe for vegetation and concrete/asphalt surfaces, and plowing access to trash dumpsters. The contractor is responsible for all damages resulting from negligent performance. Nonconforming services must be corrected at no additional cost, with potential contract price reduction or termination for default if defects persist. Monthly invoicing shall be submitted through IPP.gov in arrears. Government points of contact include Eric Lenning (MIC and Technical POC) and Dorothy Wash (Site Visit POC), both reachable at 815-834-0600.

View the file

Other files

File Type Posted
Sol_1305M327Q0046.pdf PDF
WD_2015-5019_Rev_34_17_August_2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Weather Service (NWS) Statement of Work (SOW) Chicago/Romeoville Weather Forecast Office Snow Removal

Scope:

The contractor shall provide all personnel, materials, tools and supervision for satisfactorily managing and performing programs for snow removal as specified herein. All equipment, materials, and supplies shall be furnished by the contractor, unless otherwise specified, and properly stored in the area designated by the Meteorologist-In-Charge (MIC) or designated representative.

Location:

National Weather Service Chicago/Romeoville Weather Forecast Office 250 George J Michas Drive Romeoville, IL 60446

Period of Performance:

Anticipated months of service are November – April of each year.

Base Year: 12/01/26 – 11/30/27 or as soon as possible Option Year 1: 12/01/27 – 11/30/28 Option Year 2: 12/01/28 – 11/30/29 Option Year 3: 12/01/29 – 11/30/30 Option Year 4: 12/01/30 – 11/30/31

Description of Work:

The contractor shall perform snow removal when two (2) or more inches of snow falls, or upon request by the MIC. Contractor shall not allow snow to accumulate over four (4) inches. When requested, the snow removal shall be performed within two hours of the request. Snow removal shall include:

1. The parking lot of the main facility, including entrance drive and all paved surfaces, excluding the locations where vehicles are parked at the time when work is performed. If the contractor is requested to come and plow, we shall request parked vehicles be moved to plowed areas to allow thorough snow removal.

2. The sidewalks to all entry ways of the building. Also, the sidewalk to the instrument equipment and to the storage/generator building.

3. Once snow has been removed from designated sidewalks and around all exterior doors, the Contractor shall apply an application of ice melting granules that will not kill grass and/or shrubs or damage concrete and asphalt surfaces.

4. The snow shall be plowed to allow trash removal vehicles access to the trash dumpster.

Responsibility for Loss, Damage, Death, or Injury:

Except as otherwise provided by law, the Government will not be responsible for the loss of or damage to the contractor's equipment, or death of or injury to the contractor's personnel, or for the death of, or injury to persons or for damages to property resulting from contractor's negligent performance under this contract. The contractor shall be responsible for all damages to persons or properties that occur as a result of his fault or negligence, or the fault or negligence of his employees or agents, while performing the requirements of this contract.

Inspections and Acceptance:

If any of the services do not conform to the contract requirements, the Government may require the contractor to perform the services again in conformity with the contract requirements, at no increase in contract amount. If the defects in services are not corrected by performance, the Government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.

If the contractor fails to expeditiously take the necessary action to ensure that further performance will be in conformity with contract requirements, the Government may terminate the contract for default.

Invoicing:

Vendor shall bill in IPP.gov on a monthly basis in arrears for the service provided.