This is a Statement of Work (SOW) for carpet replacement services at two National Weather Service Weather Forecast Offices operated by the National Oceanic and Atmospheric Administration (NOAA). The contractor shall remove and replace approximately 1,500 square feet of carpet at each location: the Ruskin, Florida office (2525 14th Ave SE, Ruskin, FL 33570) and the Jacksonville, Florida office (13701 Fang Drive, Jacksonville, FL 32218). Work scope includes removal of office furniture and existing carpet tiling, cove base, and transition strips; surface preparation; installation of new carpet tiling, cove base, and transitions to industry standards; cleanup; and hauling away of construction debris. The contractor must obtain all required licenses and permits, provide a designated Safety Coordinator, and submit a Safety Plan and Emergency Plan within 10 days of contract award. The period of performance is 120 days from contract award, with Jacksonville as the first priority and requested start date of January or as soon as possible after award.

Work shall be performed Monday through Friday, 7:00 A.M. to 5:00 P.M. local time, excluding federal legal holidays. The contractor shall provide manufacturer warranties on materials and one year written warranties on workmanship, plus maintenance materials consisting of five carpet tiles in each color, ten feet of cove base, and transition strips. Required submittals include a work schedule, material samples, Safety and Emergency Plans, Safety Data Sheets for hazardous materials, SASH training documentation, biobased product reports, and bi-weekly progress reports. All submittals become the property of the U.S. Government. The contractor must comply with OSHA safety requirements, sign in and out daily, and ensure all employees carry a REAL ID on their person at all times.

View the file

Other files

File Type Posted
DBA_WD_FL20260202_Rev_2_5_18_26_for_JAX.pdf PDF
Sol_1305M327Q0043.pdf PDF
DBA_WD_FL20260208_Rev_1_5_18_26_for_TBW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

NWS WEATHER SERVICE OFFICE

TBW and JAX WFO’s Ruskin, FL 33570 and Jacksonville, FL 32218

Carpet Replacement Project

Background:

The National Oceanic and Atmospheric Administration (NOAA), National Weather Service (NWS) Southern Region (SR), Weather Forecast Offices (WFO) TBW and JAX located in Ruskin and Jacksonville, FL require replacement of the office carpets, cove bases and transition strips.

Tasks:

The contractor shall provide all labor, materials, equipment, supervision, and incidentals necessary to complete the carpet tiling removal and replacement for the approximately 1,500 sqft at the Ruskin WFO and 1,500 sqft at the Jacksonville WFO as described below.

The Contractor Shall:

· Remove all desks, shelves, cabinets, tables, chairs and any other items that are not computers, monitors, or printers. Computers, monitors, and printers will be removed before work by Government personnel.

· Remove Cove Base and prep walls.

· Remove existing carpet and prep for new carpet installation.

· Remove adhesive and replace.

· Install new carpet tiling, cove base and transitions to industry standards.

· Clean/vacuum the carpet once completed.

· The contractor shall return all items that were moved back to their original place.

· Contractor and Government TPOC will conduct a walk through the area to ensure proper installation.

· Haul removed carpet and construction debris and disposed of off-site.

· Obtain all licenses, permits, and fees required for completing work.

Security:

The contractor(s) will be required to sign in each morning and sign out each evening. All contractor employees shall carry a REAL ID on their person at all times.

Place of Performance:

· National Weather Service Office 13701 Fang Drive Jacksonville , Florida 32218

· National Weather Service Office 2525 14th Ave Se Ruskin , Florida 33570

Period of Performance:

The period of performance shall be completed within one hundred twenty (120) days from contract award date. Jacksonville location is first priority and is requested to start in January or as soon as possible after award.

Standard Workday/Week:

Work shall be accomplished during the standard 8-hour day, 5-day week, Monday through Friday, between the hours of 7:00 A.M. and 5:00 P.M. local time, excluding Federal legal holidays and non-work days resulting from holidays occurring on weekends.

LEGAL HOLIDAYS

New Year’s Day 1 January Martin Luther King Day Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Juneteenth Day 19 June Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

Project Warranty:

The contractor shall honor the standard manufacturer warranties and provide one (1) year written warranties on material and workmanship.

SAFETY AND EMERGENCY PLAN:

A.The Contractor shall observe and institute all applicable OSHA safety requirements and procedures to prevent accidents and injuries to both Contractor and Government employees including 40 CFR 1926 Subpart M for fall protection requirements.
B.The Contractor shall designate one person as Safety Coordinator for purposes of communication between the Contractor and the National Weather Service TPOC Primary Contact Michael Hicks - 682-304-7794 or michael.hicks@noaa.gov.
C.Contractor shall provide a Safety Plan and Procedure to protect employees from being injured while on the job site. Submit a plan to the Technical Point of Contact (TPOC) for review and approval.
D.Contractor shall provide an Emergency Plan and Procedure to provide immediate care for an employee injured while on the job site. Submit a plan to the TPOC for review and approval.

GOVERNMENT PROVIDED MATERIALS AND/OR SERVICES

A. EXCLUSIONS:

Unless otherwise indicated elsewhere in this SOW, the Government will provide no data, materials, equipment and/or services to the Contractor. Any and all research required to fulfill the SOW described herein, shall be the responsibility of the Contractor. The Government retains the right to request the Contractor to acquire additional information on behalf of the Government.

B. WARRANTY:

The Government does not warrant that any documents provided as attachments to be free from discrepancies, ambiguities, errors, omissions, or changing conditions. It is the responsibility of the Contractor to confirm existing conditions and resolve discrepancies between documents.

SUBMITTALS

The contractor shall provide electronic copy of each required submittal in accordance with the below schedule:

Deliverable
Objective
Due
Deliver To
Work Schedule, with start and completion dates,
Coordinate scheduling with NWS Technical POC
Within 10 days of awarded contract
Technical Point of Contact (TPOC) & Contracting Officer (CO)
Designation of on-site, job-site supervisor and contact information
Provide a Primary POC to NWS
Contract Award
TPOC & CO
Material Samples
Provide samples of each type, color and pattern of carpeting, color of cove base and transitions for the TPOC to review and decide on the final color
Within 10 days of awarded contract
TPOC
Manufacturer Warranty Documentation
Warranty parts and labor
Upon acceptance of work
TPOC
Manufacturer’s Literature
Provide the manufacturer’s recommended installation instructions
Upon acceptance of work
TPOC

Safety Data Sheet (SDS)

List any hazardous material that will be used in performance of this contract. Ref. Revolutionary FAR Overhaul (RFO) 52.223-3 and FED-STD-313E
Within 10 days of awarded contract
TPOC
Maintenance Materials
Provide additional materials - five (5) carpet tiles (in each color if applicable), ten (10) ft of cove base and transitions for replacement and maintenance
Upon acceptance of work
TPOC
Safety Emergency Plan and Procedure & designation of Safety Coordinator
Protect employees from being injured while on the job site and prepare procedures to provide immediate care for an employee injured while on the job site
Within 10 days of awarded contract
TPOC
Sexual Assault and Sexual Harrasment (SASH) Training
Complete SASH training and provide documentation in accordance with NAM 1330-52.222-70
Within 30 days of award
TPOC & CO
Biobased Report (copy)
Report purchases of Biobased products in System for Award Management (SAM). Ref. RFO 52.223-2
Upon acceptance of work

TPOC

Alternative Payment Protection
Submit payment protection to cover costs of the requirement
Within 10 days of awarded contract
TPOC & CO
Progress Reports
Update the TPOC on the current status of the project, the work completed so far and the work to be completed upcoming.
Every other week
TPOC

***All submittals shall become the property of the U.S. Government***

END OF STATEMENT OF WORK