This is a Questions and Answers document for solicitation 1305M327Q0027 regarding Central Illinois snow removal services for a NOAA facility.
The Government seeks snow removal and ice management services at 1362 State Route 10 in Central Illinois for the winter season (November through March) under a Total Small Business set-aside (NAICS 561790). The contract includes a base year (12/01/2026–11/30/2027) plus four option years and a six-month extension, with all periods evaluated together for pricing purposes. Services include snow plowing to maintain parking lot and driveway access, sidewalk clearing, and ice melt application using magnesium chloride or calcium magnesium acetate. The Government requires a two-hour response time when notified, with services activated by Government notification rather than automatic dispatch at two-inch accumulation thresholds. Multiple site visits during prolonged snowstorms may be required to prevent accumulation from exceeding four inches, though timing is negotiable based on time of day. Preventative ice treatment during freezing rain or icy conditions independent of snowfall is also required. Pricing must be quoted on a per-removal basis using estimated annual snow removal incidences during winter months; additional services beyond estimates will be compensated through Purchase Order modifications. No dedicated on-site storage for contractor equipment is available, and snow piling must occur in designated grassy areas on-site without off-site hauling. The facility operates 24 hours daily, and service access is required around the clock, including weekends and holidays. The government has not provided site dimensions or historical snowfall data; site visits are strongly recommended. Past performance from both prime contractors and named performing subcontractors may be credited toward the experience factor, clearly identifying the responsible party. Clause 52.219-14 has been added with amendments, establishing a limitation on subcontracting requirement applicable to this Total Small Business set-aside.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_1305M327Q0027_Amd_0002.pdf | ||
| Price_Schedule_1305M327Q0027_0001.xlsx | XLSX spreadsheet | |
| Sol_1305M327Q0027_Amd_0001.pdf | ||
| Sol_1305M327Q0027.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1305M327Q0027 Central IL Snow Removal Services Q&A
1. Experience factor — subcontractor experience. The solicitation asks for the quoter's background and past performance on the same or similar requirements within a 2-year period. As prime contractor, we would perform the work through a subcontractor with snow-removal experience. May a subcontractor's past experience on the same or similar work be included and credited toward the Experience factor, and if so, how should it be presented?
a. Past Performance of the Prime and specific Subcontractor may be considered- specify who has the experience
2. Due time. Please confirm that quotes are due at 5:00 PM Pacific Time on Monday, November 16, 2026.
a. Please see the due date and time as specified on the most recent amendment to the solicitation.
3. Wage determination classification. Wage Determination 2015-5053, Rev. 33 does not list a snow-removal-specific occupation. Which classification(s) does the Government expect for snow-plow and shoveling labor — for example, Laborer, Grounds Maintenance (11210), Laborer (23470), or Heavy Equipment Operator (23440) — or should a conformance request be submitted?
a. You will use whichever classification applies to the service as you are quoting
it. If you are quoting a Heavy Equipment Operator- that is the classification you use, If you are quoting a laborer, that is the classification you use, and so on.
4. Operational Billing & Pricing Structure: Section 3 and the SOW specify monthly billing in arrears for the Base Year and Option Years 1–4, noting active operational months as November through March. Does the Government require a fixed flat monthly rate billed across the 5 active winter months (or 12 calendar months), or should offerors quote a per-push / per-event unit rate that is billed monthly based on actual snowfall events?
a. The Combined Synopsis/Solicitation has been updated to reflect requested pricing on a per removal basis, utilizing an estimate of average snow removal incidences annually, during the winter months when service is performed. The POP is annual due to the unknown actual dates of future snowfall. Any additional service provided in excess of the estimates will be compensated by a modification to the Purchase Order.
5. Ice Melt Chemical Specifications & Application Scope: SOW Description of Work Item 3 mandates the application of ice melting granules that will not damage concrete/asphalt surfaces or harm adjacent grass and shrubs. Does the Government have specific chemical composition requirements (e.g., Calcium Magnesium Acetate vs. Sodium Chloride) or EPA Safer Choice standards? Additionally, is chemical de-icing required across the entire main parking lot and entrance drive, or strictly on building entry sidewalks and equipment access paths?
a. Magnesium chloride or Calcium Magnesium Acetate (CMA) are OK.
6. On-Site Equipment Staging and Storage Facilities: The SOW Scope indicates that contractor equipment, tools, and supplies shall be stored in an area designated by the Meteorologist-In-Charge (MIC). Will dedicated, secure on-site space at 1362 State Route
10 be provided for staging plows, spreaders, and bulk ice melt granules throughout the November–March operating window, or must equipment be remobilized off-site after each storm event?
a. No. There is not room dedicated for the storage of contractor equipment, tools, or supplies.
7. Standing After-Hours & Weekend Site Access Protocol: Provision NAM 1330-52.237-72 establishes a default 72-hour advance written notice requirement for facility access outside normal work hours, whereas the SOW mandates a strict 2-hour physical response SLA upon callout or 2 inches of snow depth. Will the Government issue standing, pre-approved facility access authorization for designated contractor personnel to guarantee compliance with the 2-hour SLA during unannounced evening or weekend storms?
a. A 72-hour notice is not required. The office will reach out to the contractor as soon as services are expected, trying to give the contractor early notification.
8. Designated Snow Piling Areas & Off-Site Hauling: SOW Item 4 requires plowing snow to maintain unhindered access for waste removal trucks around the trash dumpster. Are there designated snow piling locations on the property, and is off-site snow relocation/hauling required if blizzard conditions exceed on-site storage capacity?
a. Off-site relocation is not necessary. There are large grassy areas where snow can be piled.
9. NOAA SASH Training Portal Access: Provision NAM 1330-52.222-70 mandates that all contractor and subcontractor personnel complete NOAA Sexual Assault and Sexual Harassment (SASH) prevention training. Will NOAA provide direct access to an online Learning Management System (LMS) portal for contractor staff to complete this requirement, or is the contractor expected to furnish a self-developed training curriculum compliant with NOAA Workplace Violence Program Manager standards?
a. NOAA will not provide direct access to our internal training. The contractor is expected to provide affirmation that contractor staff has completed training that is compliant with the requirements of 1330-52.222-70.
10.Service Area: Could the Government provide a site map or approximate square footage of the parking lot, entrance driveway, sidewalks, and other paved areas requiring snow removal?
a. I don’t have that information readily available. It is highly suggested that potential quoters perform a site visit.
11.Historical Snowfall: Since this is a new contractual requirement, could the Government provide an estimated number of snow removal events per season or historical service frequency?
a. Please see answer to Question #4
12.Service Activation: Should the contractor automatically dispatch personnel whenever snowfall reaches two inches, or will the Government notify the contractor when services are required?
a. The contractor will be notified when services are needed. Do not automatically dispatch.
13.Response Time: Does the two-hour response requirement apply only to Government-requested services, or to every snowfall event reaching the two-inch threshold?
a. Every two-inch snowfall when the office requests service.
14.Continuous Snowfall: During prolonged snowstorms, is the contractor expected to perform multiple visits to prevent accumulation from exceeding four inches?
a. Yes. But it can be negotiated based on time of day.
15.Snow Disposal: Will snow be stored in designated areas on-site, or should the contractor include off-site snow hauling and disposal in its pricing?
a. On-site.
16.Ice-Melting Materials: Does the Government have any approved products, specific material requirements, or estimated application quantities for ice-melting granules?
a. Magnesium chloride or Calcium Magnesium Acetate (CMA) are OK. An estimate of quantity is not available.
17.Pricing and Invoicing: Should contractors provide a fixed monthly price billed throughout all 12 months of each contract year, including months without snowfall, or should payments be limited to the anticipated November–March service season?
a. Please see answer to Question #4
18.Additional Services: Are ice treatment and snow removal services requested independently of snowfall accumulation included in the fixed contract price, without additional compensation?
a. Please see answer to Question #4. Should there be additional services requested beyond the estimated number of incidents, additional compensation at the based on the quoted per service incident pricing.
19.Previous Contract: Could the Government provide the previous award information or pricing for the same snow removal services, if available?
a. Previously, these services were purchased on an as needed basis.
20.24/7 Availability: Does the 2-hour response requirement apply around the clock, including weekends and holidays?
a. Yes. The facility is staffed 24 hours a day and access is required by employees.
21.Service Frequency: Is the contract expected to cover unlimited snowfall events throughout the season, or is there an anticipated number of service visits?
a. Please see answer to Questions #4 and 18.
22.Ice Management: Will preventative salting and treatment during freezing rain or icy conditions be required independently of snowfall?
a. Yes 23.Section 6 asks for the quoter's similar contracts within the last two years. May a small-business prime use a named performing subcontractor's relevant projects, supported by the prime's management/quality-control plan, to meet this experience factor?
a. See answer to Question #1 24.Please confirm any prime self-performance/subcontracting limit. We did not identify
52.219-14 in the provided clause list.
a. 52.219-14 has been added with this amendment. This is a Total Small Business set aside under the SAT.
25.The base and options run December–November, while the SOW anticipates
November–March service and requests monthly and annual prices. Should vendors price a fixed annual amount including any required early/late snow events, billed in 12 equal monthly installments, or only the five anticipated snow-service months? Please confirm any required pricing format.
a. Please see answers to questions # 4 and 18.
26.Set-aside: The solicitation text states this acquisition is set aside for small business concerns (NAICS 561790) and includes FAR 52.219-6. The SF-18's set-aside line is ambiguous in the posted copy.
Please confirm this is a Total Small Business set-aside.
a. See answer to Question # 24.
27.Site dimensions: The statement of work does not state sizes for the areas to be serviced. Can you provide the approximate square footage of the parking lot, entrance drive and other paved surfaces, and of the sidewalks (including the sidewalk to the instrument equipment area), or a site map showing the areas to be maintained?
a. That information is not readily available. It is highly recommended that a site visit be completed.
28.Evaluated price: The solicitation asks for monthly and annual pricing for the base and each option year. How is the evaluated price calculated — base year plus all four option years? Does the evaluation include the six-month extension under FAR 52.217-8?
a. Evaluation will include all four option years plus the 6-month extension.
Please see answer to question # 4 for the updated pricing structure.
29.Quote contents: Beyond the signed SF-18 with monthly and annual pricing, is anything else required with the quote (for example a technical approach or past performance)? The solicitation states that vendors who do not provide all evaluation criteria will not be accepted and references RFO 52.212-2, but the criteria themselves are not reproduced in the document.
a. See Section 6- Instructions to Offerors 30.Period of performance: CLIN 0001 states a period of "date of award
- 11/30/2027," while Section (iv) states a base period of 12/01/2026-11/30/2027. Which start date should we plan on?
a. CLIN 0001 amended to state 12/01/2026 31.Wage classification: Wage Determination 2015-5053 (Rev. 33) does not list a snow-removal occupation. Which SCA occupation classification applies to the plow/equipment operator and to sidewalk hand labor for this requirement (e.g., Tractor Operator 11270, Laborer Grounds Maintenance 11210), or will a conformance be required after award?
a. See answer to question #3 32.Insurance and bonding: We found no insurance or bonding requirement in the solicitation. Please confirm none is required.
a. Clause 52.228-5 has been included with this amendment
33.Funding: FAR 52.232-18 (Availability of Funds) is included in the clause list. Will funding for the base year be available at the time of award? Yes
34.The SOW requires a two-hour response and snow accumulation below four inches. The access clause on printed page 34 requires 72 hours' advance notice for after-hours access. Will standing storm-response access be arranged for nights, weekends and holidays, and what access procedure applies during a weather closure?
a. Every two-inch snowfall when the office requests service. The contractor will be notified when services are needed. Do not automatically dispatch. The facility is staffed 24 hours a day and access is required by employees.
35.Can you provide a site plan or measured parking, drive and sidewalk areas, plus any historical or estimated annual snow-removal callout counts?
a. Information not available, it is highly recommended to conduct a site visit.
Please see the Pricing Schedule for estimated callout counts.
36. Please also confirm whether the annual fixed price must cover all required visits with no event limit, including any needed outside the anticipated November–March season.
a. See PRicing Schedule for estimated call outs 37.For the two-year past-experience requirement, may a quoter use similar work performed by a named subcontractor that will carry out the snow removal, or must the experience be in the prime contractor's name?
a. Prime and subcontractor experience may be evaluated. Show whom has the experience.
38.We do not see FAR 52.219-14 in the clause list. Is the estimated value of this ordinary small-business acquisition, including options, at or below the simplified acquisition threshold? Please identify any limitation on subcontracting that applies to this solicitation.
a. See Answer to Question # 24