1305M327Q0022_SOW-LIX_WFO_Renovation_(2).docx
DOCX document 889 KB Posted
- Attached to
- MT. ASHLAND (KMAX) NEXRAD ROOF REPLACEMENT
- Solicitation number
- 1305M327Q0022
About this file
This is a Statement of Work (SOW) for interior renovations at the National Weather Service Weather Forecast Office in Slidell, Louisiana. The project encompasses three primary tasks: interior office painting of approximately 9,000 square feet with drywall repairs and texturing; carpet removal and replacement for approximately 2,300 square feet of carpet tiling; and comprehensive restroom renovations for two restrooms including VCT flooring removal, seamless epoxy flooring installation, and replacement of four commercial-grade toilets and four commercial-grade faucets. All work must comply with the Davis-Bacon Act, and the contractor must furnish all labor, materials, equipment, tools, services, and onsite supervision. The standard workday is Monday through Friday, 7:00 A.M. to 5:00 P.M. local time, with project completion required within 120 days of notice to proceed.
The contractor must submit a work schedule, onsite supervisor designation, material samples for paint, carpet, epoxy flooring, and cove base colors, Safety Data Sheets for hazardous materials, and a Safety and Emergency Plan within 10 days of contract award. The contractor shall provide four ADA-compliant portable restrooms during restroom renovation work and must maintain biweekly progress reports to NWS leadership. Manufacturer warranty documentation and maintenance materials—including five carpet tiles in each color, ten feet of cove base and transitions—must be provided upon work acceptance. The contractor must designate a Safety Coordinator and Key Personnel positions (Project Manager and Onsite Manager) prior to project start. The government will provide no materials, equipment, or services; all licenses, permits, and fees are the contractor's responsibility. Standard one-year warranties on materials and workmanship are required, with all debris and excess materials disposed of off-site in an environmentally compliant manner.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DBA_WD_LA20260044_Rev_2_5_18_2026.pdf | ||
| Sol_1305M327Q0022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
NWS WEATHER FORECAST OFFICE (WFO) LIX RENOVATIONS
Background:
The National Oceanic and Atmospheric Administration (NOAA), National Weather Service (NWS) Southern Region (SR), Weather Forecast Office (WFO) located in Slidell, LA. requires interior paint, restroom renovations, and replacement of the office carpet.
SCOPE:
The contractor shall furnish all necessary labor, materials/supplies, equipment, tools, services, and onsite supervision necessary to accomplish this project and all other tasks necessary for the completion of the work set forth in this Statement of Work (SOW). The Davis-Bacon Act will be applicable to this work.
Task 1: Office Painting:
The Contractor Shall:
Make needed repairs to drywall, texturing any areas which require it, and subsequent repainting of the entire interior (approximately 9000 sqft).
· Prior to painting
· Move furniture out from the walls to gain access to the entire wall to paint.
· Some items may be relocated from the room to assist with ease of painting at the Contracting Officer’s Representative’s (COR) approval.
· Cover all furniture in the room to protect from overspray.
· Protect exterior signs, equipment, and lights during cleaning and painting operations.
· Computers, printers, monitors, and similar technology will be moved by Government personnel prior to the start of painting.
· Repair any drywall and retexture to match existing texture.
· Caulk around window frames if needed.
· Remove any rust from metal doorways clean and prime prior to painting.
· Walls and doorway trim colors will be selected by NWS Staff, and contractor should allow for at least 5 different color selections.
· Paint all rooms requiring painting with at least 2 coats, ensuring full opaque coverage.
· Remove any coverings used during painting and return any furniture to its original locations.
· Clean all areas of overspray.
· The Contractor shall perform all work in a manner to minimize disruption of normal operations in all assigned areas. Each time work is completed, the Contractor is responsible for cleaning and removing from each area worked in, all debris, materials and equipment associated with the work performed.
· The Contractor will perform all services in such a manner that no property belonging to the Government is damaged. In the event that damage does occur to property of the Government or any adjacent property by reason of any services performed under this contract, the Contractor shall replace or repair at no cost to the Government.
Task 2: Carpet Removal and Replacement The Contractor Shall:
Provide all labor, materials, equipment, supervision, and incidentals necessary to complete the carpet tiling removal and replacement for the approximately 2,300 sqft as described below.
· Remove all desks, shelves, cabinets, tables, chairs and any other items that are not computers, monitors, or printers, these will be removed by government personnel.
· Remove Cove Base and prep walls.
· Remove existing carpet and prep for new carpet installation.
· Remove adhesive.
· Install new carpet tiling, cove base and transitions to industry standards. Prior to contractor ordering, NWS Staff will pick the type/color of new carpet and cove base.
· Clean/vacuum the carpet once completed.
· Contractor shall return all items that were moved back to their original place.
· Contractor and Government COR will conduct a walk through the area to ensure proper installation.
· Haul removed carpet and construction debris and dispose of off-site.
· Obtain all licenses, permits, and fees required for completing work
Task 3: Restroom Renovations The Contractor Shall Provide all labor, materials, equipment, supervision, and incidentals necessary to complete the restroom renovations for two restrooms as described below.
· Provide four (4) ADA compliant portable restrooms for the duration of the task..
· Protect adjacent finishes, fixtures, and occupied areas from dust, debris, and damage during construction activities.
· Remove and properly dispose of existing VCT flooring and adhesive from both restrooms (approximately 168 sqft each)
· Remove residual adhesive and prepare substrate to receive a new flooring system.
· Dispose of demolition materials in accordance with applicable local, state, and federal regulations.
· Mechanically prepare concrete surface through grinding, shot blasting, or other approved methods to achieve proper adhesion profile.
· Patch and repair damaged substrate areas as necessary to provide a smooth, level surface.
· Furnish and install a commercial grade, seamless epoxy flooring system throughout both restrooms. Flooring color and finish shall be selected by NWS staff prior to installation.
· Epoxy system shall include primer coat, base epoxy coat, slip-resistant aggregate as required for wet environments, and a protective topcoat/sealer suitable for restroom use and frequent cleaning.
· Furnish and install four (4) new commercial-grade toilets. Toilets shall be ADA compliant where applicable and compatible with existing plumbing connections. Contractor shall provide NWS staff options with toilet selection.
· Install new wax rings, supply lines, bolts, and associated hardware. Verify proper operation and leak-free connections after installation.
· Furnish and install four (4) new commercial grade restroom faucets on existing sink basins. Contractor shall provide NWS staff options with faucet selections.
· Make minor plumbing adjustments as necessary for proper fit and function
· Test each faucet for proper water flow, pressure, and temperature control
· Verify leak-free operation at all connection points and adjust as necessary
· Remove and dispose of all replaced fixtures in accordance with applicable regulations.
Images to show the current state of the restrooms are included below.
PROJECT SITE:
National Weather Service Forecast Office 62300 Airport Rd.
Slidell, LA 70460-5243
Standard Workday/Week:
Work shall be accomplished during the standard 8-hour day, 5-day week, Monday through Friday, between the hours of 7:00 A.M. and 5:00 P.M. local time, excluding all Federal legal holidays and non-work days resulting from holidays occurring on weekends.
Project Warranty:
The contractor shall honor the standard manufacturer warranties and provide one (1) year written warranties on material and workmanship.
STANDARD TERMS
A. Compliance.
The Contractor shall comply with all local, state, and Federal environmental, health, and safety regulations while conducting this work. In addition, the Contractor shall ensure that all work is in compliance with the applicable codes and be responsible for all licenses, permits and fees required to complete this project.
B. Disposal.
All excess material must be disposed of according to all Federal and State laws and regulations. The premises shall be kept free at all times from accumulation of waste and/or rubbish resulting from the work. Upon completion of the work, all debris, tools and surplus materials shall be removed and the entire area shall be left in a neat and clean condition. All debris, trash, waste and surplus material shall be properly disposed of off-site in an environmentally friendly manner.
C. Guidelines.
The Project shall follow the guidelines stated in the SOW, site diagrams, blueprint, and/or any contractor provided quoted documents. All modifications must be submitted and approved by the Contracting Officer.
D. Facility Access A Project sign in sheet shall be completed each day for all contractors, contractor employees and sub-contractors on site.
E. Government Contact The Contracting Officer Representative (COR) and/or Local Office Contact (LOC) will serve as the Government’s point of contact for all submissions.
F. Documents The Government does not warrant that any documents provided as attachments to be free from discrepancies, ambiguities, errors, omissions, or changing conditions. It is the responsibility of the Contractor to confirm existing conditions and resolve discrepancies between documents.
G. Project Duration The project shall be completed within one hundred twenty (120) days of notice to proceed.
H. Key Personnel The contractor will provide the following Key Personnel positions prior to the start of the project. These positions can be the occupied by the same person but must be able to fulfill both positions. If Key Personnel changes are made, the CO must be notified in writing prior to the change.
· Project Manager – Must be able to represent the contractor in regards to contract requirements and/issues.
· Onsite Manager – Must be at the location of the project whenever work is being performed by contractor or subcontractors. Communication to NWS COR/POC must be through this position.
I. Progress Reports Provide Weather Forecast Office leadership updates every other day on the project progress via email to the Property Contact and COR.
SAFETY AND EMERGENCY PLAN:
A. The Contractor shall observe and institute all applicable OSHA safety requirements and procedures to prevent accidents and injuries to both Contractor and Government employees including 40 CFR 1926 Subpart M for fall protection requirements.
B. The Contractor shall designate one person as Safety Coordinator for purposes of communication between the Contractor and the National Weather Service COR Primary Contact Marcus Watson – 318-250-5622, marcus.watson@noaa.gov.
C. Contractor shall provide a Safety Plan and Procedure to protect employees from being injured while on the job site. Submit plan to the Contracting Officer for review and approval.
D. Contractor shall provide an Emergency Plan and Procedure to provide immediate care for an employee injured while on the job site. Submit plan to the Contracting Officer for review and approval.
GOVERNMENT PROVIDED MATERIALS AND/OR SERVICES
1. EXCLUSIONS:
Unless otherwise indicated elsewhere in this SOW, the Government will provide no data, materials, equipment and/or services to the Contractor. Any and all research required to fulfill the SOW described herein, shall be the responsibility of the Contractor. The Government retains the right to request the Contractor to acquire additional information on behalf of the Government.
2. WARRANTY:
The Government does not warrant that any documents provided as attachments to be free from discrepancies, ambiguities, errors, omissions, or changing conditions. It is the responsibility of the Contractor to confirm existing conditions and resolve discrepancies between documents.
SUBMITTALS:
The contractor shall provide electronic copy of each required submittal in accordance with the below schedule:
| Deliverable |
| Objective |
| Due |
| Deliver To |
| Work Schedule, with start and completion dates, |
| Coordinate scheduling with NWS Technical POC |
| Within 10 days of awarded contract |
| Contracting Officer’s Representative (COR) & Contracting Officer (CO) |
| Designation of on-site, job-site supervisor and contact information |
| Provide a Primary POC to NWS |
| Contract Award |
| COR & CO |
| Material Samples |
| Provide samples of each type, color and pattern of carpeting, paint, epoxy flooring, color of cove base and transitions for the COR to review and decide on the final color |
| Within 10 days of awarded contract |
| COR |
| Manufacturer Warranty Documentation |
| Warranty parts and labor |
| Upon acceptance of work |
| COR |
| Manufacturer’s Literature |
| Provide the manufacturer’s recommended installation instructions for use alongside the maintenance materials |
| Upon acceptance of work |
| COR |
Safety Data Sheet (SDS)
| List any hazardous material that will be used in performance of this contract. Ref. Revolutionary FAR Overhaul (RFO) 52.223-3 and FED-STD-313E |
| Within 10 days of awarded contract |
| COR |
| Maintenance Materials |
| Provide additional materials five (5) carpet tiles (in each color if applicable), ten (10) ft of cove base and transitions for replacement and maintenance |
| Upon acceptance of work |
| COR |
| Safety Emergency Plan and Procedure & designation of Safety Coordinator |
| Protect employees from being injured while on the job site and prepare procedures to provide immediate care for an employee injured while on the job site |
| Within 10 days of awarded contract |
| COR |
| Sexual Assault and Sexual Harrasment (SASH) Training |
| Complete SASH training and provide documentation in accordance with NAM 1330-52.222-70 |
| Within 30 days of award |
| COR & CO |
| Biobased Report (copy) |
| Report purchases of Biobased products in System for Award Management (SAM). Ref. RFO 52.223-2 |
| Upon acceptance of work |
COR
| Alternative Payment Protection |
| Submit payment protection to cover costs of the requirement |
| Within 10 days of awarded contract |
| COR & CO |