142060-26-0050_Performance_Work_Statement.docx
DOCX document 39 KB Posted
- Attached to
- Antenna Installation Saipan Federal contract opportunity
- Solicitation number
- 1305M326Q0293
About this file
This is a Performance Work Statement (PWS) for NOAA Weather Radio Antenna Installation at Mount Tapochau, Saipan. The contractor shall install a new NOAA Weather Radio (NWR) antenna system at the specified mountain location to replace the existing aging infrastructure and improve radio coverage across Saipan and surrounding areas. Key objectives include site preparation and assessment, antenna installation and configuration, integration with existing NOAA Weather Radio broadcasting equipment, testing and validation of signal strength and coverage, and documentation of all installation activities. The work requires coordination with NOAA technical personnel and adherence to Federal Communications Commission (FCC) regulations and NOAA technical standards for weather radio operations. The contractor must ensure minimal disruption to existing services during installation and provide as-built documentation and training to NOAA operations staff upon completion. The installation must meet specified performance requirements for signal coverage, frequency accuracy, and operational reliability to support continuous NOAA weather alert broadcasts to the Saipan region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_1305M326Q0293_Amd_0001.pdf | ||
| Sol_1305M326Q0293.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
NATIONAL WEATHER SERVICE
WEATHER FORECAST OFFICE GUAM
NOAA Weather Radio Antenna Installation at Mount Tapochau, Saipan
1. Background The National Oceanic and Atmospheric Administration (NOAA) National Weather Service’s (NWS) mission is to provide weather, water and climate data, forecasts, warnings, and impact-based decision support services for the protection of life and property and enhancement of the national economy. As part of this mission, the NWS operates and maintains the NOAA Weather Radio All Hazards (NWR) network to provide continuous transmissions of recorded weather and appropriate all-hazards warning information to the public.
Weather Forecast Office Guam operates and maintains the Saipan NWR site (WXM86, 162.550 MHz) on Mount Tapochau, Saipan. The communications tower and equipment shelter are managed by the Commonwealth of Northern Mariana Islands (CNMI) Office of Homeland Security & Emergency Management (HSEM). In April 2026, Super Typhoon Sinlaku destroyed the communications tower supporting the NWR antenna. An emergency NWR antenna was mounted to the railings of the Mt. Tapochau lookout. HSEM has contracted the installation of a temporary 100-ft Cellular on Wheels (COW) tower and for the replacement of the 200-ft communications tower.
2. Scope This task will install a temporary NWR antenna on the HSEM COW and remove the emergency antenna installed on the Mt. Tapochau lookout railings. Once the permanent HSEM tower is constructed, this task will install the permanent NWR antenna on the new HSEM tower and remove the temporary antenna installed on the HSEM COW.
3. Codes and Standards The contractor is responsible to review all applicable industry and safety codes, standards, federal and local regulations enforced at the project site:
3.1. National Fire Protection Association, NFPA 70, National Electrical Code.
3.2. National Fire Protection Association, NFPA 780, Standard for the Installation of Lightning Protection Systems.
3.3. IEEE, NESC, The National Electrical Safety Code.
3.4. Telecommunications Industry Association, ANSI/TIA-222, Structural Standard for Antenna Supporting Structures, Antennas and Small Wind Turbine Support Structures.
3.5. Telecommunications Industry Association, ANSI/TIA-322, Loading, Analysis, and Design Criteria Related to the Installation, Alteration and Maintenance of Communication Structures.
3.6. Occupational Safety and Health Administration, Occupational Safety and Health Standards, 29 CFR 1910.
4. Performance Requirements Summary (PRS) This contract includes a Performance Requirements Summary (PRS), see Section 9. The PRS plays an integral role in the administration of the contract. In addition to any applicable inspection clauses or other related terms and conditions contained in the contract, the PRS shall serve as a primary tool for inspection and acceptance of services as facilitated by the COR. Evaluation of the contractor’s overall performance shall be in accordance with the performance standards set forth in the PRS, and will be conducted by the COR. The PRS constitutes a material aspect of the contract and will not be changed or otherwise modified without prior written approval of the CO.
5. Work Requirements/Tasks
5.1. Temporary Antenna Installation on COW
5.1.1. Install a Telewave ANT150F2 antenna (or equivalent) on the HSEM 100-ft Cellular on Wheels (COW) communication tower, at the location identified by HSEM. The antenna shall be mounted at a stand-off distance of 36 inches from the tower using an Andrew S-300 stand-off bracket.
5.1.2. Install an LMR-400 coax transmission line (or equivalent) from the antenna to the existing NWR Polyphaser VHF50D-PGR surge protector in the equipment shelter, approximately 300 ft away. Install the coax in HSEM provided conduits, if available. Terminate the coax, secure to the tower, install weatherproofing, and grounding kits in accordance with the manufacture’s recommendations.
5.1.3. Measure the Voltage Standing Wave Ratio (VSWR) of the installed antenna and coax across the entire frequency range of the antenna. Verify that the VSWR meets the antenna manufacture’s specifications. If not, troubleshoot the installation until the VSWR meets the antenna manufacture’s specifications or until approved by the Technical Point of Contact (TPOC).
5.1.4. Coordinate the cutover of the NWR transmitter from the emergency antenna to the temporary antenna with the TPOC.
5.1.5. Remove the emergency antenna and coax installed on the Mt. Tapochau lookout railing. Dispose of materials as directed by the TPOC.
5.2. Permanent Antenna Installation on New HSEM Tower
5.2.1. Install a Telewave ANT150F2 antenna on the new HSEM communication tower, at approximately the 200-ft elevation, as specified by HSEM. The antenna shall be mounted at a stand-off distance of 36 inches from the tower. Perform a structural analysis to ensure that the antenna installation meets structural codes and standards for the site wind rating. Provide the appropriate stand-off bracket, stiff arm, etc. that meets the structural requirements.
5.2.2. Install Andrew AVA5-50 7/8" Heliax coax transmission line from the existing NWR Polyphaser VHF50D-PGR surge protector in the equipment shelter to the antenna, approximately 250 ft away. Transition from 7/8” Heliax to Andrew FSJ4-50B 1/2" Superflex Heliax before connecting to the antenna. Route the coax using the tower cable management or as specified by HSEM. Terminate the coax, secure to the tower, install weatherproofing, and grounding kits in accordance with the manufacture’s recommendations.
5.2.3. Measure the Voltage Standing Wave Ratio (VSWR) of the installed antenna and coax across the entire frequency range of the antenna. Verify that the VSWR meets the antenna manufacture’s specifications. If not, troubleshoot the installation until the VSWR meets the antenna manufacture’s specifications or until approved by the TPOC.
5.2.4. Coordinate the cutover of the NWR transmitter from the temporary antenna to the permanent antenna with the TPOC.
5.2.5. Remove the temporary antenna and coax installed on the COW tower. Dispose of materials as directed by the TPOC.
6. Contractor Requirements
6.1. Qualified Personnel
The contractor shall provide qualified personnel to perform all requirements specified in this PWS. The contractor shall provide a fully trained workforce to meet the requirements; therefore, personal development training costs and hours are not billable to the Government. The contractor must receive approval from the COR prior to placing any individual working on this contract that does not meet the stated requirements.
6.2. Contractor Furnished Materials
6.2.1. The contractor shall provide all parts, materials, tools, and equipment to complete the task.
6.2.2. The contractor shall verify material quantity/lengths, proper fit, etc. before ordering, cutting, or prefabrication. The contractor shall perform site surveys, as necessary.
6.2.3. All “equivalent” substitutions shall receive prior government approval in writing before ordering/installing.
6.2.4. Materials for the temporary antenna installation on the COW (all or brand name or equivalent):
| Description |
| Manufacture |
| Part Number |
| Quantity |
| Antenna, unity gain omni, 148-174 MHz, 500W |
| Telewave |
| ANT150F2, or equivalent |
| 1 |
| Stand-off bracket, 3 ft, 24 in pipe |
| Andrew |
| S-300, |
or equivalent
| Clamp adapter, for stand-off bracket to tower leg |
| Andrew |
| TBD |
| As required |
| Coax, braided, 0.4 in OD |
| Times Microwave |
| LMR-400 |
| 500 ft |
| Connector, 7/16 DIN Male, for LMR-400 |
| Times Microwave |
| EZ-400-716M-X, |
or equivalent
| Connector, Type-N, for LMR-400 |
| Times Microwave |
| EZ-400-NMH-X, |
or equivalent
| Coax hanger, LMR-400 |
| Times Microwave |
| TBD |
| As required |
| Cable tie, nylon 612, black weather resistant, 0.3 in width, 24.7 in length, 120 lb strength |
| Panduit |
| PLT7LH-C6120, |
or equivalent As required
| Grounding Kit, LMR-400 |
| Times Microwave |
| TBD |
| As required |
| Weatherproofing kit, coax |
| Times Microwave |
| TBD |
| As required |
6.2.5. Materials for the permanent antenna installation on the new HSEM tower (all items are brand name or equal):
| Description |
| Manufacture |
| Part Number |
| Quantity |
| Antenna, unity gain omni, 148-174 MHz, 500W |
| Telewave |
| ANT150F2, or equivalent |
| 1 |
| Stand-off bracket, 3 ft, 24 in pipe |
| Andrew |
| S-300, |
or as determined during the structural analysis
| Clamp adapter, for stand-off bracket to tower leg |
| Andrew |
| TBD |
| As required |
| Stiff arm bracket, 150 in pipe |
| Andrew |
| SA-B12, or as determined during the structural analysis |
| As required |
| Coax, corrugated copper, 7/8 in OD |
| Andrew |
| AVA5-50, or equivalent |
| 300 ft |
| Connector, 7/16 DIN Male, for AVA5-50 |
| Andrew |
| 78EZDM, or equivalent |
| 1 |
| Connector, Type-N Female, for AVA5-50 |
| Andrew |
| 78EZNF, or equivalent |
| 1 |
| Coax hanger, 7/8 in coax |
| Andrew |
| TBD |
| As required |
| Grounding kit, 7/8 in coax |
| Andrew |
| TBD |
| As required |
| Weatherproofing kit, coax |
| Andrew |
| TBD |
| As required |
| Coax, corrugated copper, 1/2 in OD, superflex |
| Andrew |
| FSJ4-50B, |
or equivalent 6 ft
| Connector, Type-N Male, for FSJ4-50B |
| Andrew |
| F4PNMV2-HC, |
or equivalent
| Coax hanger, 1/2 in coax |
| Andrew |
| TBD |
| As required |
7. Other Applicable Conditions and Requirements
7.1. Technical Point of Contact (TPOC) – Grant.Shiroma@noaa.gov (808)725-6037
7.2. Contracting Officer’s Representative (COR) – Edward.David@noaa.gov (671) 472-0921 -IPP Invoicing POC
7.3. Place of Performance
The work to be performed under this contract will be at the following locations:
7.3.1. CNMI HSEM tower site, Mt. Tapochau, Saipan (15.1865, 145.743819).
7.4. Period of Performance
The period of performance is 365 days after award.
The temporary HSEM COW tower is tentatively scheduled to be installed in June 2026. Installation schedule for the temporary antenna to be determined during the kick-off meeting.
The new HSEM communication tower is tentatively schedule to be installed in October 2026. Installation schedule for the permanent antenna to be determined during the kick-off meeting.
7.5. Kick-off Meeting
A kick-off meeting shall be scheduled within seven (7) calendar days after contract award to discuss the scope of the PWS. The contractor shall present a team roster and an overall project schedule. The contractor shall identify issues requiring direction from the government. The kick-off meeting may be held virtually using Google Meet, or equivalent.
7.6. Impromptu Meetings
The government reserves the right to contact the contractor via email, phone, or virtually using Google Meet or equivalent to request status updates, clarifications, etc.
7.7. Product Submittal Package
Provide a product submittal package for approval prior to ordering materials. The installation materials and techniques shall meet applicable codes, standards, and manufacture recommendations. At a minimum, the submittals shall include the following items:
7.7.1. Antenna and mounting bracket with structural analysis (permanent installation only).
7.7.2. Coax cable attachment, grounding, and weatherproofing materials and installation methods.
7.8. Nonionizing Radiation Safety Plan
Nonionizing radiation refers to all radiations originating from radio stations, radar equipment, and other possible sources of electromagnetic radiation such as used for communication, radio navigation, and industrial and scientific purposes as defined in 29 CFR 1910.97. The contractor shall provide a copy of the nonionizing radiation safety plan for this project. The plan shall be provided as soon as possible if transmitter shut downs are required, but no later than 14 days prior to the start of on-site work.
7.9. Certificate of Insurance
The contractor shall provide a certificate of insurance covering the work under this project to include worker’s compensation, general liability, umbrella policies, etc. no later than seven (7) days prior to the start of on-site work.
7.10. Fall Protection and Rescue Plan
The contractor shall provide a copy of the fall protection and rescue plan for this project including proof of climbing certifications for all personnel that will be climbing the tower. The plan shall meet the requirements of 29 CFR 1910.28, 1910.29, 1910.30 and shall be provided no later than seven (7) days prior to the start of on-site work.
7.11. Final Inspection Report
The contractor shall provide a final inspection report within 14 days after the completion of on-site work documenting the installation and including photos, where possible. At a minimum, the report shall cover the following items:
7.11.1. Antenna and mounting bracket installation
7.11.2. Coax cable attachment, grounding, and weatherproofing installation
7.11.3. VSWR measurements
8. Deliverables The contractor must provide all deliverables listed in the table below by the due date indicated. Other deliverables described in the PWS may be due on an as needed basis, but that will not alleviate the contractor for providing the said deliverables by the due date and time required by the government.
| No. |
| Item |
| Quantity |
| Due Date |
| Deliver To |
| Reference |
| 1 |
| Project schedule |
| As required |
| During the kick-off meeting. Revisions provided as required. |
| TPOC, COR |
| PWS Section 7.7 |
| 2 |
| Product submittal package |
| 1 |
| Prior to ordering materials |
| TPOC, COR |
| PWS Section 7.9 |
| 3 |
| Nonionizing radiation safety plan |
| 1 |
| As soon as possible if transmitter shutdowns are required. No later than 14 days prior to the start of on-site work. |
| TPOC, COR |
| PWS Section 7.10 |
| 4 |
| Certificate of Insurance (worker’s compensation, general liability, umbrella, etc.) |
| 1 |
| No later than seven (7) days prior to the start of on-site work. |
| TPOC, COR |
| PWS Section 7.11 |
| 5 |
| Fall protection and rescue plan. Proof of climbing certifications. |
| 1 |
| No later than seven (7) days prior to the start of on-site work. |
| TPOC, COR |
| PWS Section 7.12 |
| 6 |
| Final inspection report |
| 1 |
| Within 14 days after the completion of on-site work. |
| TPOC, COR |
| PWS Section 7.13 |
9. Performance Requirements Summary The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
| Service Output |
| Performance Objective |
| Acceptable Quality Level (AQL) |
| Positive Incentive |
| Negative Incentive |
| Timely submittals, as required |
| 100% Compliance with all requirements of the PWS. |
| Less than 2 late submittals during the project. |
| Timely payments and no delays in project schedule. |
| Corrective action plan submitted to COR for review. |
| Product submittals conform to applicable codes, standards, and manufacture recommendations |
| 100% Compliance with all applicable codes, standards, and manufacture recommendations. |
| All standards and requirements are met. |
| An installation that meets codes, standards, and requirements. |
| Corrective action plan submitted to COR for review. |
| Safety plans and certificate of insurance |
| 100% Compliance with all requirements of the PWS. |
| Provided complete, without errors, and on time. |
| No delays in project schedule and project completed without any injuries. |
| Corrective action plan submitted to COR for review. |
| Temporary and permanent installations |
| 100% Compliance with all requirement of the PWS and product submittals. |
| All standards and requirements are met. |
| An installation that meets codes, standards, and requirements. |
| Corrective action plan submitted to COR for review. |
| Final inspection report |
| 100% Compliance with all requirements of the PWS. |
| Professional quality, without errors, with all requirements met. |
| Timely final payment and close out of project. |
| Withholding of final payment until documentation is complete. |