Sol_1305M325Q0253_Amd_0001.pdf
PDF 271 KB Posted
- Attached to
- Fire Detection and Fixed Gas Firefighting System
- Solicitation number
- 1305M325Q0253
About this file
This document is an Amendment (0001) to a solicitation for a fire detection and fixed gas firefighting system for the NOAA Fisheries Southeast Fishery Science Center's R/V Gladys Reese research vessel. The project requires designing, engineering, installing, and commissioning a complete fire protection package, including an addressable Consilium fire detection system and two fixed CO2 suppression systems for the Engine Room and Forward Machinery Space. The systems must meet ABS Marine Vessel Rules and USCG Subchapter T regulations, with key deliverables including system installation, documentation, and on-site commissioning at a shipyard within 50 miles of Pascagoula, Mississippi.
The solicitation specifies detailed technical requirements, such as providing one ABS and USCG-approved fire detection system, two fixed-cylinder CO2 suppression systems, manual actuation with time delays, horn-strobes, and integration with the vessel's general alarm system. Deliverables are scheduled with engineering submittals due 8-10 weeks after award, equipment delivery within 12-14 weeks of Notice to Proceed, and installation completed within 2 weeks of delivery. The solicitation includes attachments for past performance questionnaire, Service Contract Act wage determination, and vessel drawings. The quote response deadline is 3:00 PM Eastern Time on August 26, 2025, with the period of performance from September 15, 2025, to August 31, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| No__3_Vessel_drawings_0001.pdf | ||
| Sol_1305M325Q0253.pdf | ||
| 1305M325Q0253_Attachments_1-2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
AMANDA ROSSITER
See continuation page
WAD-NMFS-Seattle
7600 SAND POINT WAY NE BLDG 1
SEATTLE WA 98115
WAD-NMFS-S
1305M325Q0253
08/18/2025
08/12/2025
1 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
1305M325Q0253/0001
Period of Performance: 09/15/2025 to
08/31/2026
1305M325Q0253 0001
Amendment 0001 to Solicitation 1305M325Q0253 is issued to:
1. Provide revisions to the Statement of Need (SON) contained in the solicitation issued on August 12, 2025, reference Section 3 - Line Items and Attachments. Revisions are attached and are indicated in yellow highlighting.
2. The due date for receipt of quotations remains unchanged: 3:00 PM Eastern Time on August 26, 2025.
3. All other terms and conditions remain unchanged.
Section 3 - Line Items and Attachments
Item/Sub Number Description Quantity Unit Price Total Item
Amount
Fire Detection and Fixed Gas Firefighting System in accordance with the Statement of Need (SON)
U.S. DEPARTMENT OF COMMERCE
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA) FISHERIES, SOUTHEAST FISHERY
SCIENCE CENTER (SEFSC)
STATEMENT OF NEED
FIRE DETECTION AND FIXED GAS FIREFIGHTING SYSTEMS
1. PURPOSE
The purpose of this project is to deliver a complete fire protection package for the R/V Gladys Reese, consisting of an addressable fire detection system and a fixed CO2 fire suppression system. These systems are required to meet compliance with ABS Marine Vessel Rules and USCG Subchapter T regulations, ensuring vessel safety and regulatory certification.
2. MISSION
The SEFSC conducts marine research in support of NMFS's mission to ensure the sustainable use of the nation's living marine resources. Upgrading the fire detection and fixed gas firefighting system is essential for ensuring operational readiness during fisheries and protected species research missions.
3. BACKGROUND
The R/V Gladys Reese is a 134-foot steel-hull research vessel recently acquired and repurposed by SEFSC for the NOAA Fisheries missions in the Gulf of America, South Atlantic, and Caribbean Sea. Originally designed for offshore oilfield work, the vessel is undergoing multiple interior and exterior modifications to support the NOAA Fisheries mission. A complete fire protection system is necessary to enhance fire safety and achieve regulatory certification through the installation of an addressable Consilium Fire Detection and Fixed Gas Firefighting System. This system is essential for safeguarding lives, preserving assets, and ensuring continued operational viability of the vessel.
The vessel is not new, but there are no existing older systems onboard. All fire detection and firefighting systems required under this solicitation shall be new installations.
4. SCOPE OF WORK
The contractor shall provide all design, engineering, equipment, installation, integration, testing, and commissioning required to deliver a fully functional fire detection and fixed gas firefighting system.
4.1 FIRE DETECTION SYSTEM
The contractor shall:
• Design and provide one (1) ABS and USCG-approved addressable Consilium or equivalent Fire Detection System.
• Terminate, test, and commission the system.
• Provide system drawings, battery backup calculations, certifications, component data sheets, and technical manual. For vessel layout drawings, offerors shall reference Attachment No. 3 and https://my.matterport.com/show/?m=aoT5biozHnh.
• Provide one alarm contact for integration with the vessel’s general alarm system.
4.2 FIXED GAS (CO2) FIREFIGHTING SYSTEM
The contractor shall:
• Design and provide two (2) ABS and USCG-approved Kidde or equivalent fixed-cylinder CO2 suppression systems for:
o Engine Room (9,408 cu. ft.)
o Forward Machinery Space and Passageway (7,308 cu. ft.)
• Install, test, and commission both systems.
• Include manual actuation with 60-second time delays and one (1) IMO-approved pull cabinet per zone.
• Provide two 3-pole pressure switches per system for ventilation and engine shutdown (to be wired by shipyard).
• Include four (4) 24VDC multitone horn-strobes.
• Engineering package includes: piping diagrams, CO2 calculations, component data sheets, and technical manual.
4.3 DELIVERABLES
• Fully installed and commissioned addressable Consilium fire detection system.
• Fully installed and commissioned dual-zone CO2 suppression system.
• System documentation, including:
o Engineering submittals (AutoCAD format);
o Certifications and component data; and o User and technical manuals
• Coordination and integration support with the shipyard for interfacing with general alarm, ventilation, and shutdown systems.
5. CERTIFICATION & COMPLIANCE
Project completion shall be defined by the following criteria:
• Successful testing and commissioning of the fire detection system;
• Submission of all required documentation; and
• Written acceptance by the client based on performance per ABS and USCG Subchapter T standards.
6. PLACE OF PERFORMANCE AND ACCEPTANCE
The Main Switchboard will be installed and commissioned aboard NOAA research vessel R/V Gladys Reese at the designated shipyard facility no more than 50 miles from Pascagoula, Mississippi.
https://my.matterport.com/show/?m=aoT5biozHnh
Final shipyard location will be confirmed upon award of the associated shipyard service contract.
Acceptance of the system will occur on-site following successful on-vessel installation, start-up, and commissioning in accordance with contract requirements.
7. SCHEDULE OF DELIVERABLES
The following is a schedule of all deliverables, including administrative deliverables, required during the period of performance of this contract:
Item Description Due Date Deliver to
1. Engineering and Design Submittals 8-10 weeks after award Brandi Noble
2. Equipment Delivery & Mobilization Within 12-14 weeks of Notice to Proceed Brandi Noble
3. Installation & Commissioning Within 2 weeks following delivery Brandi Noble
LIST OF ATTACHMENTS ATTACHMENT
No. 1: Past Performance Questionnaire ATTACHMENT No. 2: Service Contract Act WD # 2015-5147, Rev. No. 27, dated July 8, 2025 No. 3: Vessel drawings – available in Shipyard Solicitation 1305M325Q0206 via https://sam.gov/workspace/contract/opp/9c1870a81edf4741a454e53ca4d6d038/view
List of Attachments
Attachment Number Title
3 Vessel drawings https://sam.gov/workspace/contract/opp/9c1870a81edf4741a454e53ca4d6d038/view
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .