9 1305M322RNRMJ0011_Amendment 01.pdf
PDF 129 KB Posted
- Attached to
- Keeling Building Addition, Mauna Loa Project 2 Federal contract opportunity
- Solicitation number
- 1305M322RNRMJ0011
About this file
This document is an amendment to a federal solicitation for the Keeling Building Addition project. The solicitation is seeking proposals to construct an addition to the Keeling Building located at the Mauna Loa facility. The amendment replaces the original building drawings attachment with revised drawings. Proposals are due by June 1st, 2022. The solicitation is being conducted by the Department of Commerce National Oceanic and Atmospheric Administration Western Acquisition Division. The selected contractor will be awarded a contract to complete the construction project according to the revised specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 9 1305M322RNRMJ0011_Amendment 02.pdf | ||
| 9c 1305M322RNRMJ0011 Attachment 2 Past Performance Questionnaire.docx | DOCX document | |
| 9f 1305M322RNRMJ0011 Attachment 5 Banned Construction Materials List.pdf | ||
| 9g 1305M322RNRMJ0011 Attachment 6 DB WD HI20220001 Mod 8.pdf | ||
| 9d 1305M322RNRMJ0011 Attachment 3 Non-Disclosure Agreement.docx | DOCX document | |
| 9a 1305M322RNRMJ0011_SF1442.pdf | ||
| 9b 1305M322RNRMJ0011 Attachment 1 Statement of Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)
Darrin Moore, Contracting Officer
15B. Contractor/Offeror 15C. Date Signed 16B. United States of America
(Signature of Contracting Officer)
16C. Date Signed
(Signature of person authorized to sign)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code Page of Pages
1 1
2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)
01 14 June 2022 N/A
6. Issued By Code AJ730004 7. Administered By (If other than Item 6) Code SEE BLOCK 6
WESTERN ACQUISITION DIVISION SOU6
325 BROADWAY
BOULDER, CO 80305
8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.
X
1305M322RNRMJ0011
9B. Date (See Item 11)
01 June 2022 10A., Modification of Contract/Order No.
10B. Date (See Item 13)
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 01 incorporates the following changes to solicitation 1305M322RNRMJ0011:
a. Replaces 9e 1305M322RNRMJ0011 Attachment 4 Keeling Building Drawings with 9e. 1305M322RNRMJ0011 Attachment 4 – Building Drawings Rev 1.