This request for quote solicits offers for a research and monitoring vessel charter to the Northwestern Hawaiian Islands to support coral reef damage assessment projects. The contractor will provide vessel transportation between islands, berthing and meals for up to 21 scientists, and operational support for scientific diving, small boat operations, and unmanned aerial surveys. The vessel must accommodate recompression equipment, scientific gear, small boats up to 19 feet, and internet access. The charter is for 20 days between July 2020 and September 2021, including mobilization and demobilization. The contractor must safely transport personnel and equipment, abide by permit conditions, and support scientific activities. Offers are due in accordance with FAR 52.212-1 and must be registered in SAM. The Department of Commerce National Oceanic and Atmospheric Administration is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A0002 1305M320QNCNM0039.pdf | ||
| Attachment 2 Past Performance Questionnaire.docx | DOCX document | |
| 1305M320QNCNM0039.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
See Attachment Page.
1 64
1305M320QNCNM00390001 MAY 15, 2020 NCNM7300-20-00987
AJ730004
WESTERN ACQUISITION DIVISION
SOU6
325 BROADWAY
BOULDER CO 80305
1305M320QNCNM0039
MAY 13, 2020
See Schedule x
5/15/2020
Noah Nielsen Contracting Officer
Attachment Page
PAGE 2 OF 64 1305M320QNCNM00390001
The following questions have been received and responses have been provided. Where indicated, the statement of work (SOW) has been updated.
1. Is there a minimum bandwidth that is required and anticipated GB of service?
It would be ideal for a 5 MB/Second upload capacity with the intention to stream some video over YouTube/Facebook, and some capacity for static uploads. At a minimum, there should be a 1.4 MB/sec upload. This is updated in the SOW.
2. Customer Gear to load. To ensure that the vessel has adequate crane capacity, what is the heaviest object that has to be loaded onboard the vessel?
The heaviest single piece of equipment to be loaded is the Chamber (20K lbs); however, this can be done with the Navy Crane at the pier. While Underway the heaviest load will be the loaded Safe Boat at 6600 lbs.
3. Is there a minimum amperage or KVA for the 110V and 3 phase (240V or 480V) loads?
Max amp draw is from the AC unit and is at around 20 amps.
4. PMNM Permit Conditions. Can you please include the permit conditions and Best
Management Practices with the RFQ? We are assuming among other things that there is a no discharge requirement for the vessel while in the Monument.
Please see the below link for details:
https://www.papahanaumokuakea.gov/permit/bestmanagement.html
5. Please provide the NOAA requirements for Coronavirus mitigation on vessels.
There are no NOAA requirements at this time. When the award is made, the Government will work with the contractor to ensure proper protections are put into place in accordance with the proper guidelines at that time.
6. Who is authorized to perform the external hull inspection?
See best management practices from the aforementioned link, but normally this is conducted by the Government team via Scuba dive or ROV. The Government can also review video footage if coming from non-Oahu ports
7. Section B, CLIN 0001 and 0002 require the contractor in input the quantity of charter days and mob/demob days; whereas the price schedule (page 64) only has one CLIN
0001 and requires pricing by the job with a quantity of one. Please clarify how pricing is to be provided.
This has been corrected to show that both charter days and mob/demob days will form collectively CLIN 0001.
PAGE 3 OF 64 1305M320QNCNM00390001
8. The period of performance is 14 months in duration. One of the major cost drivers is the price of fuel which is to be included in the unit price. Right now the price of fuel is at an all-time low and you are asking the contractor to guess the price during this 14 month period. Can the cost of fuel be included as a reimbursable?
The Government has elected to keep the structure as a firm-fixed price. The expectation is that each offeror will factor in the escalation of fuel prices if the charter cannot happen in
2020 and has to be pushed to 2021.
9. Please verify that clause CAR 1352.228-70 does not cover agency personnel while off of the vessel, including operating small boats or while diving.
The requirements are only for during performance of the requirement by the contractor. It would not apply to the Government’s personnel when they are independently operating a Government small boat/diving and the Contractor is not involved with the operations.
10. Does this RFQ and the period of performance cover only one charter event to take place, which will likely occur in the August time frame? Or will there be two charter events?The requirement is for only one charter event that will take place in the August timeframe in either 2020 or 2021, depending upon availability of the offeror’s vessel.
11. Will the contractor be recompensed for any days other than the mobilization/demobilization and underway charter days—for days of reduced operational capability, for example, when the vessel is on stand by for mission support?
If the charter is delayed, a vessel charter day is billable. Any weather or unforeseen delays will result in a change and reduction in the overall survey schedule.
12. Will the contractor be compensated for movement of the vessel to and from its homeport and the charter places of performance?
The contractor will not be compensated for movement of the vessel from its homeport to the meeting point at a pier – designated by the contractor in its offer- in Honolulu, HI. The only compensation provided is what is designated in the price schedule.
PAGE 4 OF 64 1305M320QNCNM00390001
SECTION B – PRICE SCHEDULE
CLIN ITEM PERIOD OF
PERFORMANCE
QTY UNIT
PRICE
TOTAL
0001 Charter Days 07/01/2020 –
12/31/2021
0001 Mobilization and
Demobilization Days
07/01/2020 –
12/31/2021
TOTAL PRICE
Key:
EA=Each
*Quantity amounts for CLINs 0001 and 0002 will depend on the offeror’s vessel’s accommodation and should be included in the offer provided to the government, as described in Section E of this Request for Quote (RFQ).
PAGE 5 OF 64 1305M320QNCNM00390001
SECTION C - CONTRACT CLAUSES
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS -- COMMERCIAL ITEMS
(OCT 2018) (DEVIATION 2017-05) (AUG 2017)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights --
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31
U.S.C.3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The
Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the
Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting
Officer of the cessation of such occurrence.
PAGE 6 OF 64 1305M320QNCNM00390001
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include --
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer— System for Award Management, or
52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C.
3903) and Office of Management and Budget (OMB) prompt payment regulations at 5
PAGE 7 OF 64 1305M320QNCNM00390001
CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt Payment. The Government will make payment in accordance with the Prompt
Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see
52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the
Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under
PAGE 8 OF 64 1305M320QNCNM00390001
this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in
(i)(6)(v) of this clause, and then at the rate applicable for each six-month period at fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the
Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the
Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract
PAGE 9 OF 64 1305M320QNCNM00390001
debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the
Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the
Contractor shall be liable to the Government for any and all rights and remedies provided by law.
If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor
PAGE 10 OF 64 1305M320QNCNM00390001
will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain
Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 10 U.S.C.
2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C.
chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with
Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause.
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t) Reserved
(u) Unauthorized Obligations.
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End Use License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency
PAGE 11 OF 64 1305M320QNCNM00390001
Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(End of Clause)
ADDENDUM TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL
ITEMS
The following clauses are incorporated into 52.212-4 as an addendum to this contract:
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR: https://www.acquisition.gov/far/ http://farsite.hill.af.mil/vfcara.htm
CAR: http://farsite.hill.af.mil/vfcara.htm
FAR 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER
CONTENT PAPER (MAY 2011)
FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
FAR 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE
MAINTENANCE (JUL 2016)
PAGE 12 OF 64 1305M320QNCNM00390001
FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
FAR 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND
VEGETATION (APR 1984)
CAR 1352.201-70 CONTRACTING OFFICER'S AUTHORITY (APR 2010)
CAR 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)
CAR 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
CAR 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)
CAR 1352.242-70 POST AWARD CONFERENCE (APR 2010)
FAR 52.252-4 ALTERATIONS IN CONTRACT (APR 1984)
Portions of this contract are altered as follows:
To be filled out at time of award.
FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR
Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any Department of Commerce Procurement
Memoranda. (48 CFR Chapter 1452) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
CAR 1352.201-72 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (APR 2010)
(a) [TO BE ASSIGNED AT AWARD BY SEPARATE LETTER] is hereby designated as the Contracting Officer's Representative (COR). The COR may be changed at any time by the
Government without prior notice to the contractor by a unilateral modification to the contract.
The COR is located at:
[TO BE ASSIGNED AT AWARD BY SEPARATE LETTER]
PAGE 13 OF 64 1305M320QNCNM00390001
(b) The responsibilities and limitations of the COR are as follows:
(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.
(2) The COR is not authorized to make any commitments or otherwise obligate the
Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the
COR. No such changes shall be made without the express written prior authorization of the
Contracting Officer. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.
CAR 1352.228-70 INSURANCE COVERAGE (APR 2010)
(a) Workers Compensation and Employer's Liability. The contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in states with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
(b) General liability. (1) The contractor shall have bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) When special circumstances apply in accordance with FAR 28.307–2(b), Property Damage
Liability Insurance shall be required in the amount of $0.
(c) Automobile liability. The contractor shall have automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.
(d) Aircraft public and passenger liability. When aircraft are used in connection with performing the contract, the contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
PAGE 14 OF 64 1305M320QNCNM00390001
(e) Vessel liability. When contract performance involves use of vessels, the Contractor shall provide, vessel collision liability and protection and indemnity liability insurance as determined by the Government.
CAR 1352.228-72 DEDUCTIBLES UNDER REQUIRED INSURANCE COVERAGE—
FIXED PRICE (APR 2010)
When the Government is injured, wholly or partially as a result of the contractor's actions and such actions are covered by the insurance required by 1352.228–70, Insurance Coverage, the
Government is entitled to recover from the contractor the full amount of any such injury attributable to the contractor regardless of a deductible. The Contracting Officer may offset the amount of recovery against any payment due to the contractor.
CAR 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)
(a) The Contracting Officer or the duly authorized representative will accept supplies and services to be provided under this contract.
(b) The place of acceptance will be:
On Contractor’s vessel
CAR 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)
(a) The base period of performance of this contract is from 07/10/2020 through 09/30/2021. If an option is exercised, the period of performance shall be extended through the end of that option period.
(b) The option periods that may be exercised are as follows:
N/A
(c) The notice requirements for unilateral exercise of option periods are set out in FAR 52.217–9.
(End of clause)
NAM 1330-52.203-70 SCIENTIFIC INTEGRITY AND RESEARCH MISCONDUCT
(a) Definitions. As used in this provision –
Scientific activities mean activities that involve inventorying, monitoring, observations, experimentation, study, research, integration, modeling, and scientific assessment.
PAGE 15 OF 64 1305M320QNCNM00390001
Scientific integrity means the condition resulting from adherence to professional values and practices when conducting and applying the results of science that ensures objectivity, clarity, and reproducibility, and that provides insulation from bias, fabrication, falsification, plagiarism, interference, censorship, and inadequate procedural and information security.
Presentation of scientific activities results includes the analysis, synthesis, compilation, or translation of scientific information and data into formats for the use of the Department of
Commerce or the United States of America.
Scientific and Research Misconduct means fabrication, falsification, or plagiarism in proposing, performing, or reviewing scientific and research activities, or in the products or reporting of the results of these activities. It specifically includes intentional circumvention of the integrity of the scientific and research process and actions that compromise that process, but does not include honest error or differences of opinion.
Investigation is formal collection and evaluation of information and facts to determine if scientific or research misconduct can be established, to assess its extent and consequences, and to recommend appropriate action.
(b) General Guidelines
Maintaining Integrity. The Contractor shall maintain the scientific integrity of research performed pursuant to this contract award including the prevention, detection, and remediation of research misconduct, and the conduct of inquiries, investigations and adjudication of allegations of research misconduct.
In performing or presenting the results of scientific activities under the contract, and in responding to allegations of scientific and research misconduct, the Contractor shall comply with the provisions herein and NOAA Administrative Order (NAO) 202-735D, Scientific Integrity, and its Procedural Handbook, including any amendments thereto.
Primary Responsibility. The Contractor shall have the primary responsibility to prevent, detect, and investigate allegations of scientific and research misconduct. Unless otherwise instructed by the contracting officer, the Contractor shall promptly conduct an initial inquiry into any allegation of such misconduct and may rely on its internal policies and procedures, as appropriate, to do so.
By executing this contract, the Contractor provides its assurance that it has established an administrative process for performing an inquiry, investigating, and reporting allegations of scientific and research misconduct; and that it will comply with its own administrative process for performing an inquiry, investigation and reporting of such misconduct.
The Contractor shall insert the substance of this requirement in subcontracts at all tiers that involve research being performed under this contract.
(c) Investigating Misconduct Research
PAGE 16 OF 64 1305M320QNCNM00390001
1. Initiating Investigation. If the Contractor determines that there is sufficient evidence to proceed to an investigation, it shall notify the contracting officer and, unless otherwise instructed, the Contractor shall:
a. Promptly conduct an investigation to develop a complete factual record and an examination of such record leading to either a finding of scientific and research misconduct and an identification of appropriate remedies or a determination that no further action is warranted.
b. If the investigation leads to a finding of scientific and research misconduct, obtain adjudication by a neutral third party adjudicator. The adjudication must include a review of the investigative record and, as warranted, a determination of appropriate corrective actions and sanctions.
2. Finalizing Investigation. When the investigation is complete, the Contractor shall forward to the contracting officer a copy of the evidentiary record, the investigative report, any recommendations made to the Contractor’s adjudicating official, the adjudicating official’s decision and notification of any corrective action taken or planned, and the subject’s written response (if any).
(d) Findings and Corrective Actions
1. If the Contractor finds that scientific and research misconduct has occurred, it shall assess the seriousness of the misconduct and its impact on the research completed or in process and shall:
i. Take all necessary corrective actions, which includes, but are not limited to, correcting the research record, and, as appropriate, imposing restrictions, controls, or other parameters on research in process or to be conducted in the future, and
ii. Coordinate remedial action with the contracting officer.
(e) Department of Commerce Actions
1. The Department of Commerce may accept the Contractor’s findings or proceed with its own investigation, in which case the Contractor shall fully cooperate with the investigation. The contracting officer will inform the Contractor of the Department’s final determination.
2. The Department of Commerce reserves the right to pursue such remedies and other actions as it deems appropriate, consistent with the terms and conditions of the contract and applicable laws and regulations. Such remedies and actions may include, but are not limited to, disallowance of costs, recoupment of contract payments, and suspension or debarment.
PAGE 17 OF 64 1305M320QNCNM00390001
NAM 1330-52.203-71 NOTICE OF POST-GOVERNMENT EMPLOYMENT
RESTRICTIONS (OCT 2015)
By submission of an offer in response to a NOAA solicitation or acceptance of a contract, the contractor acknowledges the restriction on current NOAA employees regarding contact with offerors regarding prospective employment and the corresponding obligations for contractors who engage them. The contractor further acknowledges that it has provided notice to former
NOAA employees who will provide service to NOAA under the contract of post-Government employment restrictions that apply to them. Such restrictions include, but are not limited to, those set forth in:
(a) 41 U.S.C. § 2103 regarding contacts between a federal employee working on a procurement and an offeror about prospective employment;
(b) 18 U.S.C. § 207 regarding the restrictions on former federal employees having contact with a federal agency on behalf of another person or entity concerning a specific party matter with which the former employee was involved as a federal employee or for which the former federal employee had official responsibility;
(c) 18 U.S.C. § 207 regarding the restrictions on former senior employees and senior political employees from having contact with his former federal agency on behalf of another person or entity concerning any official matter; and
(c) 41 U.S.C. § 2104 regarding the restrictions on a former federal employee involved in an acquisition over $10,000,000 from accepting compensation from a contractor.
NAM 1330-52.222-71 NOAA SEXUAL ASSAULT AND SEXUAL HARASSMENT
PREVENTION AND RESPONSE POLICY APPLICABLE TO CREW MEMBERS OF
VESSELS UNDER NOAA CONTRACT OR ORDER (MAY 2018)
(a) General Policy.
In accordance with NOAA Administrative Order (NAO) 202-1106, NOAA Sexual Assault and
Sexual Harassment Prevention and Response Policy, it is the policy of NOAA to maintain a work environment free from sexual assault and sexual harassment. NAO 202-1106 prohibits sexual assault and sexual harassment by or of any employee, supervisor, manager, contractor, vendor, affiliate, or other individual with whom NOAA employees come into contact by the virtue of their work for NOAA. The NAO includes NOAA’s mandatory requirements for completion of sexual assault and sexual harassment prevention and response training.
It is the responsibility of the contractor to ensure that contractor employees maintain the highest degree of conduct and standards in performance of the contract or order. In support of this, NOAA urges its contractors to develop and enforce comprehensive company policy addressing sexual assault and sexual harassment prevention.
(b) Applicability.
PAGE 18 OF 64 1305M320QNCNM00390001
The policy set forth in NAO 202-1106 applies to all contractor employees identified as crew members on vessels secured for use under a NOAA contract or order. Prior to performance, the contractor shall provide all contractor employee crew members an awareness briefing on the requirements of the NAO and a copy of or access to a copy of the NAO. All contractor employee crew members must comply with the NAO, which includes completion of the mandatory training provided by NOAA as described in (d) below.
The contractor shall include wording substantially the same as this solicitation and contract language in every subcontract for services involving the use of vessels so that it is binding on each subcontractor.
(c) Definition.
Contractor Employees - As used this solicitation and contract language, refers to employees of the prime contractor or its subcontractors, affiliates, consultants, or team members.
(d) Mandatory Training.
1. Completion of initial mandatory sexual assault and sexual harassment prevention and response training is required for all contractor employees identified as crew members in performance of this contract or order, in accordance with NAO 202-1106. This training will be provided by NOAA.
a. The training will include by-stander intervention training and specific steps on how to prevent and report sexual assault and sexual harassment, as well as training on drug and alcohol awareness in the workplace. The training will typically be provided within two (2) hours of the vessel’s departure from port.
b. A copy of NAO 202-1106 will be provided to each crew member upon initial boarding of the vessel. Each crew member must sign a form managed by the vessel’s Commanding
Officer/Operations Officer verifying they have received and will comply with the NAO in its entirety.
2. For vessels at sea for more than 12 months, annual sexual assault and sexual harassment training, provided by NOAA, will be required pursuant to NAO 202-1106. The specific format of the training will depend on the availability of resources (e.g. internet access).
(e) Reporting Incidents of Sexual Assault/Sexual Harassment.
Contractor employee crew members should refer to NAO 202-1106, Section 6, Reporting
Incidents of Sexual Harassment or Sexual Assault, at .07, Reporting from Remote Locations, when reporting incidents of sexual assault or sexual harassment.
(f) Remedies.
In addition to other remedies available to the Government, contractor employee violations of
NAO 202-1106 or other Federal requirements (e.g., law, statutes, executive orders, code, rules, or regulations) applicable to sexual assault and sexual harassment may result in:
1. Requiring the Contractor to remove a contractor employee or employees from the performance of the contract;
2. Requiring the Contractor to terminate a subcontract;
PAGE 19 OF 64 1305M320QNCNM00390001
3. Suspension of contract payments until the Contractor has taken appropriate remedial action;
4. Termination of the contract for default or cause, in accordance with the termination clause of this contract;
5. Suspension or debarment; or
6. Other appropriate action.
NAM 1330.52.237-71 NOAA GOVERNMENT-CONTRACTOR RELATIONS – NON-
PERSONAL SERVICES CONTRACT (SEPT 2017)
(a) The Government and the contractor understand and agree that the services to be delivered under this contract by the contractor to the Government are non-personal services as defined in
FAR Part 37, Service Contracting, and the parties recognize and agree that no employer-employee relationship exists or will exist under the contract between the Government and the contractor’s personnel. It is, therefore, in the best interest of the Government to afford both parties an understanding of their respective obligations.
(b) Contractor personnel under this contract shall not:
1. Be placed in a position where they are under relatively continuous supervision and control of a Government employee.
2. Be placed in a position of command, supervision, administration, or control over
Government personnel or over personnel of other contractors performing under other NOAA contracts.
(c) The services to be performed under this contract do not require the contractor or the contractor’s personnel to exercise personal judgement and discretion on behalf of the
Government. Rather, the contractor’s personnel will act and exercise personal judgement and discretion on behalf of the contractor.
(d) Rules, regulations, directives, and requirements that are issued by the Department of
Commerce and NOAA under its responsibility for good order, administration, and security are applicable to all personnel who enter the Government installation and facilities, who are provided access to Government systems, or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.
(e) Both parties are responsible for monitoring contract activities for indications of improper employee-employer relationships during performance. In the event a situation or occurrence takes place inconsistent with this contract language, the following applies:
1. The contractor shall notify the contracting officer in writing within 5 business days from the date of any situation or occurrence where the contractor considers specific contract
PAGE 20 OF 64 1305M320QNCNM00390001
activity to be inconsistent with the intent of this contract language. The notice must include the date, nature and circumstance of the situation or occurrence, the name, function and activity of each Government employee or contractor employee involved or knowledgeable about the situation or occurrence, provide any documents or the substance of any oral communications related to the activity, and an estimated date by which the
Government is recommended to respond to the notice in order to minimize cost, delay, or disruption of performance.
2. The contracting officer will review the information provided by the contractor, obtain additional information (if needed), and respond in writing as soon as practicable after receipt of the notification from the contractor. The contracting officer’s response will provide a decision on whether the contracting officer determines the situation or occurrence to be inconsistent with the intent of this contract language and, if deemed necessary, will specify any corrective action(s) to be taken in order to resolve the issue.
(End of solicitation and contract language)
NAM 1330.52.242-70 SUBMITTAL OF INVOICES (FEB 2011)
The Contractor shall prepare and submit an invoice to the COR for approval [with a copy to the contracting officer for information]. All invoices shall be submitted by the 10th day of the subsequent month.
To constitute a proper invoice, the contractor’s invoice shall be prepared in accordance with, and contain all elements specified in, the paragraph titled, “Contractor’s Invoice,” of the applicable prompt payment provision of the contract (e.g., FAR 52.232-25, Prompt Payment; FAR 52.232-
26, Prompt Payment for Fixed-Price Architect Engineer Contracts; or FAR 52.232-27, Prompt
Payment for Construction Contracts). For contracts and orders for commercial items and services, paragraph (g) of FAR 52.212-4, titled, “Invoices,” applies.
If the invoice does not comply with the applicable prompt payment provision of the contract, the
COR will return it to the contractor within seven days after the date the designated office received the invoice along with a statement as to the reasons why it is not a proper invoice.
NAM 1330-52.243-70 REQUESTS FOR EQUITABLE ADJUSTMENT (OCT 2017)
(a) The amount of any request for equitable adjustment to contract terms shall accurately reflect the contract adjustment for which the Contractor believes the Government is liable. The request shall include only costs for performing the change. All indirect costs included in the request shall be properly allocable to the change in accordance with applicable acquisition regulations.
(b) Any request for equitable adjustment to contract terms that exceeds the simplified acquisition threshold shall bear, at the time of submission, the following certificate executed by an individual authorized to certify the request on behalf of the Contractor:
PAGE 21 OF 64 1305M320QNCNM00390001
I certify that the request is made in good faith, and that the supporting data are accurate and complete to the best of my knowledge and belief.
(Official’s Name)
(Title)
(c) The certification in paragraph (b) of this clause requires full disclosure of all relevant facts, including:
(1) Certified cost or pricing data, if required, in accordance with subsection 15.403-4 of the Federal Acquisition Regulation (FAR); and
(2) Data other than certified cost or pricing data, in accordance with subsection 15.403-3 of the FAR, including actual cost data and data to support any estimated costs, even if certified cost or pricing data are not required.
(d) The certification requirement in paragraph (b) of this clause does not apply to:
(1) Requests for routine contract payments; for example, requests for payment for accepted supplies and services, routine vouchers under a cost-reimbursement type contract, or progress payment invoices; or
(3) Final adjustments under an incentive provision of the contract.
(End of Solicitation and Contract Language)
NAM 1330-52.270-304 NOAA ACQUISITION AND GRANTS OFFICE OMBUDSMAN
(OCT 2016)
(a) The NOAA Acquisition and Grants Office (AGO) Ombudsman is available to organizations to promote responsible and meaningful exchanges of information. Generally, the purpose of these exchanges will be to:
1) Allow contractors to better prepare for and propose on business opportunities.
2) Advise as to technologies and solutions within the marketplace that the Government may not be aware of, or is not fully benefiting.
3) Identify constraints in transparency.
(b) The AGO Ombudsman will objectively, reasonably, and responsibly collaborate with parties and recommend fair, impartial, and constructive solutions to the matters presented to him/her.
PAGE 22 OF 64 1305M320QNCNM00390001
Further, the AGO Ombudsman will maintain the reasonable and responsible confidentiality of the source of a concern, when such a request has been formally made by an authorized officer of an organization seeking to do business with, or already doing business with NOAA.
(c) Before consulting with the AGO Ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations with the respective contracting officer for resolution. However, direct access to the AGO Ombudsman may be sought when an interested party questions the objectivity or equity of a contracting officer’s decision, or when there is a bona fide reason to believe that reasonable, responsible, and objective consideration will not be received from an assigned contracting officer.
(d)There are several constraints to the scope of the AGO Ombudsman’s authority, for instance:
Consulting with the AGO Ombudsman does not alter or postpone the timelines of any formal process (e.g., protests, claims, debriefings, employee employer actions, activities involving A76 competition performance decisions, judicial or congressional hearings, or proposal, amendment, modification or deliverable due dates).
The AGO Ombudsman cannot participate in the evaluation of proposals, source selection processes, or the adjudication of protests or formal contract disputes.
The AGO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .