USCG_Station_Juneau_Industry_Day_06032026.pdf

PDF 4 MB Posted

Attached to
INDUSTRY DAY_NOAA/USCG Recapitalization Project (Design-Build)
Solicitation number
1305M226NOAAUSCG
Issued by

About this file

This is an informational industry day presentation for the United States Coast Guard Cutter STORIS Homeport Project in Juneau, Alaska.

The project involves designing and building a resilient, mission-ready waterfront facility to serve as the homeport for USCGC STORIS (WAGB-21) and support other visiting Coast Guard vessels and national security operations in Alaska. The facility must accommodate three berths minimum, provide simultaneous cutter support, and achieve a 50-year service life for all marine systems. The contract is structured as a Design Build Firm Fixed Price agreement with an anticipated cost range of $125 million to $200 million and an expected award in Q4 FY 2026. The base scope includes five contract line items: CLIN 0001 (Design/Engineering/Permitting Support), CLIN 0002 (Demolition/Site Civil), CLIN 0003 (Waterfront Facilities), CLIN 0004A (On-Site Utilities), and CLIN 0004B (Off-Site Utility Upgrades). Optional CLINs include CLIN 0005 (Renovation of three existing buildings, approximately 23,493 square feet) and CLIN 0006 (Covered Small Boat Mooring/Floating Pier). The design build contractor is responsible for site verification, geotechnical confirmation, coastal analysis, all design and construction, cost/schedule risk management, and maintaining USCG access to facilities throughout construction.

The project faces significant technical challenges including 20-25+ foot tidal variation, 70+ mph Taku winds, seismic hazards, saltwater corrosion, tsunami risk, and extreme winter conditions. The waterfront scope encompasses demolition, new fixed wharf, heavy-duty floating pier, fender and mooring systems, utility upgrades requiring 6,400 amp net electrical increase with shore power capability for simultaneous cutter operations, backup generators, lighting, CCTV, access control, and building renovations. Critical constraints include maintaining USCG Station Juneau's operational status during construction, accommodating active cruise ship operations, and implementing phased execution with temporary utilities and moorings. NOAA (represented by Contracting Officer Jana Kolb and Contracting Specialist Amy McLiverty) serves as contract administrator, while the USCG (represented by Program Manager CDR Kyle Ensley and Project Manager LCDR Tyler Viera) functions as mission owner and primary stakeholder responsible for environmental permitting. Design phase deliverables include concept design workshop, 35%, 65%, 95% design submittals, and issued-for-construction documents, each with basis of design, calculations, drawings, schedule, risk register, QC certification, and renderings.

View the file

Other files

File Type Posted
Sign-In Sheet_060326.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

INFORMATIONAL

UNITED STATES COAST GUARD CUTTER STORIS

Homeport Project

Industry Day Presentation LOCATION: 345 Egan Dr, Juneau, AK 99801

June 3rd 2026

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Introduction

Project & Acquisition Team:

• Contracting Officer: Jana Kolb: jana.kolb@noaa.gov

• Contracting Specialist: Amy McLiverty: amy.l.mcliverty@noaa.gov

• NOAA Project Sponsor: Timothy Calohan, PE: timothy.calohan@noaa.gov

• USCG CG-SHORE-A-MASI Program Manager: CDR Kyle Ensley, PE, CFM

• USCG Project Manager: LCDR Tyler Viera, PE

Assistant Commandant - Shore PEO & Chief Engineer (CG-SHORE)

Assistant Commandant – Shore PEO & Chief Engineer (CG-SHORE)

USCGC Storis Homeporting Project – Industry Day

Welcome Industry Partners

CG-SHORE-A-MASI Program | CDR Ensley June 2026

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Strategic Mission Importance

• Supports all Coast Guard missions in Alaska

• Homeport for USCGC STORIS

(WAGB-21)

• Supports National Security Cutters (NSCs) and Offshore Patrol Cutters (OPCs) visiting cutters

• Enables readiness for:

̶ Expanded Arctic Operations/Presence ̶ Search & Rescue ̶ Living Marine Resources &

Maritime Security ̶ Fisheries enforcement ̶ Environmental response ̶ Homeland security ̶ National defense readiness ̶ Support to Alaska Native Communities

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

The US Coast Guard , the Arctic & Juneau

CGC Storis Homeport, Juneau, AK

CG Cutter Storis CGC STORIS Characteristics

Length: 360 ft

Beam: 80 ft

Draft: 30 ft

NAV Draft: 36 ft

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Existing Conditions

• Aging waterfront infrastructure is beyond useful life

• Structural deterioration and corrosion

• Insufficient shore power capacity

• Utility constraints

• Operational limitations

• Reduced resilience to seismic, wind, and environmental loads

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Existing

USCG

Small Boat Facilities

Potown Area

Red line indicates shoreside project areas

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Project Vision

• Three (3) total berths minimum

• Simultaneous cutter support

• Properly sized and resilient utilities

• Safe all-tide access

• Long-term durability

• 50-year service life for all marine systems

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

(Drawing credit: Huna Totem Corporation and PND Engineers)

Existing

USCG

Small Boat Facilities

Deliver a resilient, mission-ready waterfront facility

CONCEPT

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Contract Type:

Design Build Firm Fixed Price

Project Overview

Roles and Responsibilities

• NOAA: Contract, Project Management, Oversight, and Administration

• USCG: Mission Owner, Primary Stakeholder, Environmental Permitting

Cost Range:

$125M - $200M

Project Timeline:

Anticipated Award Q4 FY 2026

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Waterfront Scope Highlights

• Demo

• New fixed wharf

• Heavy-duty floating pier

• Fender and mooring systems

• Gangways / Trestle

• Site civil improvements

• Upgraded Utilities to support the site and new waterfront

• Corrosion protection systems

• Backup generators

• Lighting / CCTV / Access Control

• Building renovations or new

• New covered small boat floating pier and mooring

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Base Scope Overview

• CLIN 0001 – Design / Engineering / Permitting Support

• CLIN 0002 – Demolition / Site Civil

• CLIN 0003 – Waterfront Facilities

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

• CLIN 0004A – On-Site Utilities

• CLIN 0004B – Off-Site Utility Upgrades

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Optional CLIN Opportunities

• Optional CLIN 0005 - Renovation of 3 Existing Buildings (~23,493 SF)

• Optional CLIN 0006 - Covered Small Boat Mooring / Floating Pier

Offerors should be ready to price and integrate Options

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Unique Technical Design Drivers

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

• 20-25+ ft Tidal Variation

• Challenging Logistics

• 70+ MPH Taku winds

• Storm Surges

• Extreme Cold

• Dense Fog

• Tsunamis and Seiches

• Seismic Hazards

• Freeze / Thaw conditions

• Snow Loading

• Saltwater Corrosion

• Heavy Cutter berthing Forces

• Vehicular + Crane loads

• Towable/Removable Floating Systems

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Utilities / Power Requirements

• Critical Infrastructure Expectations ̶ Electrical 6,400 AMP net increase Shore power for simultaneous cutter ops Transformers / switchgear / feeders Backup generators

̶ Utility Systems Water Sewer Fire protection Stormwater Fiber / Communications

• Advanced Metering Required

• Compatibility with existing Coast

Guard DAS systems required.

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Active Installation Constraints

• USCG Station Juneau remains operational during construction.

• Active cruise ship operations

• Offerors shall plan for:

̶ Phased execution ̶ Temporary utilities ̶ Temporary moorings ̶ Safe access routes ̶ Security controls/fencing ̶ 24/7 response operations ̶ Minimal disruption to Coast Guard operations

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Contractor Responsibilities

The SOW places responsibility on the Design Build Team for:

• Site condition & utility verification

• Geotech confirmation

• Coastal Analysis

• Design

• Constructability

• Logistics planning

• Permit compliance coordination

• Construction

• Cost/schedule risk management

• Quality Control

• Maintain USCG access to the main building and small boat pier

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Design Phase Expectations

• Required Milestones ̶ Concept Design Workshop ̶ 35% Design ̶ 65% Design ̶ 95% Design ̶ Issued for construction (IFC)

• Each submission includes:

̶ Basis of Design ̶ Calculations ̶ Drawings ̶ Schedule ̶ Risk Register ̶ Track changes from the previous version ̶ QC Certification ̶ Renderings

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Additional Contractor Support Requirements

• Included in CLIN 0001 ̶ Owner’s Job Office Trailer ̶ Provide and maintain trailer for NOAA / USCG team including:

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

5 private offices 1 workstation 12-person conference room

Internet / utilities Furniture Weekly janitorial service

U.S. Department of Commerce • National Oceanic and Atmospheric Administration • Office of Marine and Aviation Operations

Slide Number 1
Slide Number 2
USCGC Storis Homeporting Project – Industry Day��Welcome Industry Partners
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13
Slide Number 14
Slide Number 15
Slide Number 16
Slide Number 17
Slide Number 18
Slide Number 19
Slide Number 21