This document is an Amendment (001) to a solicitation for a Dock Power Distribution Panel, Disconnect, Troughs and Transformer Replacement project. The solicitation (1305M225Q0202) includes several key clarifications from site visits: the transformer is 112 KVA with a rain hood, all hardware must be outdoor-rated for harsh salt water environments, and specific material requirements include marine-grade stainless steel panels, marine-grade aluminum frames with corrosion inhibitors, and Schedule 80 wiring tubes. The solicitation closing date has been extended to August 27, 2025 at 12:00pm EST. Additionally, the amendment addresses a licensing question, confirming that contractors with electrical licenses from outside Florida will be accepted, provided all work complies with Florida Code.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 001 - 08/20/2025
This amendment is being issued to provide the full Questions and Answers attachment, along with any applicable additional comments/clarifications originating from the site visits.
No further questions are being accepted with the issuing of this amendment, and no further site visits will be accepted.
The closing date of this solicitation is extended to August 27, 2025 at 12:00pm EST to allow for quotes to be submitted.
1305M225Q0202
Dock Power Distribution Panel, Disconnect, Troughs and Transformer Replacement Clarifications and Questions / Answers
1. The following information is provided as clarification to questions/comments raised during the site visits:
• The transformer is a 112 KVA and should include a rain hood.
• All installed hardware and materials shall be outdoor rated for harsh salt water environment.
• Panels and hardware should marine-grade stainless steel (such as 4X).
• The frame (stands) shall be marine-grade aluminum with corrosion inhibitors.
• All wiring tubes should be Schedule 80.
• Clarification for Section 5 e of the SOW "Install associated wiring and equipment..."
refers to all hardware, conduits and fittings.
2. Additionally, the following question is answered:
• SOW reference: “The contractor shall hold a minimum qualification as a licensed/insured electrical contractor in the State of Florida”.
• Question: Can you make considerations for contractors who hold a Master Electrical License outside the state of Florida?
• Answer: A current license outside of the state of Florida will be allowed;
however, all work must be completed in accordance with Florida Code.