Perchloric Acid Fume Hood Mechanical Repairs
Solicitation number
1305M225Q0201
Issued by

About this file

This document is an Amendment (001) for Solicitation 1305M225Q0201 for Fume Hood Repairs at NOAA/HML (National Oceanic and Atmospheric Administration/Hydrometeorological Laboratory). The amendment extends the solicitation closing date to August 27, 2025 at 12:00pm EST and provides a Questions and Answers attachment. Key technical requirements include continuous stainless steel welding for ductwork due to prior perchloric acid usage, with strict safety protocols mandating at least two qualified personnel on-site for installation—one for welding and one for fire watch/safety support. The project involves sliding new fabricated duct sections from the roof to the hood, with comprehensive documentation including mechanical, hood, and plumbing schematics attached to the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 001 - 08/19/2025

This amendment is being issued to provide the full Questions and Answers attachment, along with any applicable additional comments, drawings, specifications, etc.

No further questions are being accepted with the issuing of this amendment.

The closing date of this solicitation is extended to August 27, 2025 at 12:00pm EST to allow for quotes to be submitted.

1305M225Q0201 Fume Hood Repairs – Questions / Answers

1. Is there a print of the Hood?

Answer: Attached are Mechanicals, Hood Documents, and Plumbing Schematics, etc.

2. Is there a print of the Duct System?

Answer: Attached and Perchloric Acid Hood is on Pg. 4 or Drawing M1.23.

3. Does this require full welding, or can flourosilicone be utilized for gasket flange connections?

Answer: Because this fume hood has been used with heated perchloric acid, the ductwork must be made of continuously welded stainless steel. Gasketed or flanged joints—even with fluoroelastomer gaskets—are not allowed because they can trap residues, leak under pressure, or degrade, creating severe safety hazards. This is a strict safety requirement. Although the Hood has now been deemed safe for repairs by a contracted decontamination company, we wish to maintain stainless steel welding due to its future use once the Hood is fully operational again.

4. Does NOAA require 2 people to install? This is relatively easy job for one person.

Answer: Yes, NOAA/HML requires at least two qualified personnel on site for this work.

One to perform the welding/installation, and one as fire watch/safety support. This is consistent with OSHA hot work rules, NFPA perchloric Hood standards, and NOAA’s facility safety policies. A one-person installation would not meet safety compliance. The scope requires sliding new fabricated duct sections down from the roof to the Hood.

Even if “mechanically easy,” safe handling per OSHA lifting guidelines requires at least two workers for positioning and securing.