1305M225Q0115 Questions-Answers.pdf
PDF 103 KB Posted
- Attached to
- 1305M225Q0115 - NGSTTC FIRE SYSTEM INSTALLATION
- Solicitation number
- 1305M225Q0115
About this file
This document is a Questions and Answers (Q&A) file for Solicitation Number 1305M225Q0115, related to a fire system installation project for the National Geodetic Survey Testing and Training Center. The Q&A addresses technical details about the project, including building specifications and installation requirements. Key details include: the project involves installing a fire alarm system in an 8,000 sq. ft. warehouse in Woodford, VA, with a building height of 9 feet and partial drop ceilings. The timeline is flexible, with a preference for system installation within 60 days after award, and permits to be obtained through Caroline County.
The document clarifies several technical aspects of the project, such as the building use groups (office building classified as group B, warehouse as group S), the absence of an existing operable sprinkler system, and specific installation requirements. Contractors are informed that cable installation must be secured properly and approved by the Chief and Contracting Officer's Representative (COR), and that the project involves installing two completely separate systems without interconnecting cables between buildings. The local fire inspector will serve as the Authority Having Jurisdiction (AHJ), and no existing fire alarm system drawings are available for the warehouse.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0VAE068_14001071 - office.pdf | ||
| 0VAE068_14001068 - warehouse.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1305M225Q0115 – Questions / Answers
1. Requesting building layouts or Fire Alarm designs (New or Past designs) to ensure the devices are correct.
• Answer: See attached building layouts
2. We are interested in obtaining the drawing for the fire alarm system of the warehouse mentioned.
• Answer: There is not a drawing of the fire alarm system
3. Does it need DEB approval? –
• Answer: This should be included in the permit
4. Is the AHJ local county inspector or 3rd party inspector?
• Answer: The local fire inspector
5. What is the use group of the building?
• Answer: Unsure of what is being asked – this is an office building for employees and training (group B) and warehouse is for surveying equipment (group S)
6. Is there existing fire sprinkler system?
• Answer: There is a fire system that is not operable, no sprinkler system
7. The timeline is 30 days after award, but it also states that permits must be obtained prior to starting work. Is this a hard timeline? Permitting often takes 2 weeks or longer, depending on the AHJ. Do you know who the approving authority will be?
• Answer: Permits will need to be applied for through Caroline County. There is not a hard timeline but we would like the system installed no later than 60 days after the award.
8. Are there any requirements for cable to be installed in raceway, or is free air cable acceptable (installed neatly and secured)?
• Answer: Yes, but it has to be secured properly and approved prior to installation by Chief and COR.
9. Are both the warehouse/garage and building 11 to be included in the quote?
• Answer: Warehouse/garage and not building 11
10. Who is providing the underground raceway between buildings, not included in the scope?
• Answer: The objective is to install 2 completely separate systems eliminating the need to run cable between the buildings
11. Can you tell me what the height of the building is, and is there any drop ceilings?
• Answer: 9 feet and half of the building has drop ceilings.