About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Vessel Support Services, newest first.
File Type Posted
Amendment_0001.pdf PDF
RFQ.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vessel Support for Current Meter Deployments in the

New York / New Jersey Harbor

Background The National Oceanic and Atmospheric Administration (NOAA) is one of several bureaus of the U.S. Department of Commerce, a cabinet level agency of the executive branch of the United States of America. Since the mid-1800’s NOAA’s National Ocean Service (NOS) Center for Operational Oceanographic Products and Services and its predecessors have been collecting tidal current information to maintain and update the predictions in U.S. Tidal Current Tables. Mariners rely on this information to plan for safe and efficient maritime transportation. Every year CO-OPS deploys dozens of current meters in multiple locations around the country. In the summer / fall of 2019, NOAA will be measuring currents in the New York / New Jersey Harbor (NY/NJ) region (Map 1). Vessel support is requested for both the deployment and recovery of bottom-mounted ADCP current meters at stations in NY/NJ Harbor (Table 1).

To conduct this current observation work, NOAA seeks the services of a vessel, captain and crew to be available to deploy and recover the scientific instruments based upon the timeline provided below (Table 2).

REQUIREMENTS

Vessel

Due to the relatively small geographic survey region and its proximity to a major metropolitan region, the vessel may make several trips to deploy all locations. However, the vessel shall be large enough to carry the mooring platforms and instrumentation for at least three stations at once to mitigate time spent in transit. A typical mooring will require at least 40 square feet on deck. The vessel shall also have the space for safe movement around all mooring equipment. The vessel shall be USCG safety inspected, provide the name of the USCG inspector, and the captain must provide proof of licensure.

The minimum requirements are, the vessel shall:

· Be equipped with navigational (functional GPS and VHF radio), depth sounding, and medical safety equipment, as prescribed by the U.S. Coast Guard.

· If possible, GPS data (NMEA format) should be available via serial cable.

· Have a valid USCG safety inspection

· Have at least 1 deck hand plus the captain/skipper

· Have safety equipment on-board (fire extinguisher, EPIRB, etc.)

· Have an A-frame, crane, boom, or similar lifting device/structure with a safe dynamic working load of at least 2000 lbs.

· Have a winch, capstan or other device with the capability to haul 5/16” spectra line, or similar line with a length 60 m (three times the length of the deepest station in Table 1).

· Have sufficient unobstructed deck space to perform operations in a safe manner with multiple (3 or more) mooring platforms on deck.

· A working head in a lockable bathroom.

· Be 50 to 100 feet in length, larger vessels are acceptable but not necessary.

· Have at least 375 square feet of unobstructed deck space.

· Have space to accommodate at least four (4) NOAA personnel during operations.

· A supply of potable drinking water.

· A work area for computer use and paperwork.

The vessel Captain shall

· Possess knowledge of the study areas and deployment and recovery operations.

· Be U.S. Coast Guard Certified for the vessel to be used.

Locations

There are 19 stations that will be deployed and then recovered. Table 1 provides the list of stations indicating each station id, name, latitude, longitude, depth, and mount type. Figure 1 shows the station locations and the general location of the staging area in a map of the harbor.

NOAA CO-OPS retains the right to adjust the station locations within the region if deemed necessary. NOAA CO-OPS is determining our base of operations (staging area) during the survey which will be in the general area of the Upper Bay near either at the USACE base in Jersey City, NJ or the USCG ATON base in Bayonne, NJ. Other ports may be proposed in the proposal and will be considered.

NOAA CO-OPS anticipates all operations, including loading and transit for each cruise period, to require between six (6) to eight (8) days depending on weather, seas and vessel size, as described in Table 2. Routes should be planned to optimize the timing of deployments and recoveries to take place near slack water. The final schedule is up to the discretion of the vessel captain, pending NOAA approval. NOAA CO-OPS is aware that weather and other events can change timing. Some stations are in shallow water and may require a deployment/recovery during times of high-water based upon vessel draft.

Period of Performance The Captain, crew, and vessel shall be available for deployment operations commencing in early August 2019 with all station deployments completed by mid-August 2019. Final recoveries shall be conducted during the last two weeks of October 2019. A tentative schedule is described in Table 2. This schedule is subject to change based on scheduling with the vessel and NOAA personnel. Final schedule will be determined during the kick-off meeting with the vessel operator. Table 1 provides a planned station deployment list, slight changes in the mounts may arise as recovered stations will be used at another site in the second round of deployments. Two stations on the list were added after site reconnaissance in June / July 2018. Water depth and bottom type were determined from charts and will be updated during before work begins.

Table 1 – Stations

Station I.D.
Name
Lat (°) N
Lon (°) W
Depth (M)
Mount
NYH 1901
Sandy Hook, 0.6NM NE of
40.48725
-073.9931
14
mTRBM
NYH 1903
Ambrose Channel
40.5176
-073.9747
11
TRBM
NYH 1904
Rockaway Inlet Jetty 1NM SW of
40.53266
-073.96053
16
mTRBM
NYH 1905
Rockaway Inlet
40.5688
-073.93616
12
mTRBM
NYH 1908
Arthur Kill Tremley Point
40.58896
-074.20586
12
mTRBM
NYH 1909
Arthur Kill Gulfport
40.62957
-074.20347
16
mTRBM
NYH 1910
North of Shooters Island
40.64746
-074.1611
18
ES-2
NYH 1914
Constable Hook Approch
40.65086
-074.0641
20
ES-2
NYH 1917
Gowanus Bay Ent
40.66242
-074.01815
13
ES-2
NYH 1920*
Brooklyn Bridge
40.706
-073.9975
17
TRBM
NYH 1921*
Corlears Hook
40.7097
-073.97613
19
TRBM
NYH 1923*
Hell Gate
40.7783
-73.9383
14
TRBM
NYH 1924*
Middle Ground
40.7917
-073.91297
13
TRBM
NYH 1926
Hudson River Entrance
40.708
-074.025
19
ES-2
NYH 1927
Hudson River, Pier 92
40.7705
-074.00306
18
ES-2
NYH 1928
Hudson River, Grants Tomb
40.8138
-073.9682
19
ES-2
NYH 1929
Rockaway Bay Channel
40.5729
-073.885017
13
mTRBM
NYH 1933**
Hudson / Harlem River Entrance North
40.8791
-073.92873
~18
(ES-2)
NYH 1934**
Newtown Creek Entrance
40.7376
-073.9604
~10
mTRBM

Notes:

* These four stations are located in the East River and deployment and recovery should be planned to be near as possible to low flow. Operations will coordinate with vessel crew to best optimize operations these locations.

** These two stations were added during after the reconnaissance was completed and the location will be assessed during first deployment using the NOAA small boat.

Table 2 – General Timeline

Cruise Dates
Operations
Aug. 5 - 17
Deploy: 19 stations on contract vessel
Oct. 17 – Oct. 29
Recovery: All stations

Attachment:

Platform types (current meter mounts)

Figure 1 - Map of Stations

Table 3 – All stations (red font stations are planned for NOAA vessel deployment)

Station I.D.
Name
Lat (°) N
Lon (°) W
Depth (M)
NYHR 1901
Sandy Hook, 0.6NM NE of
40.48725
-073.9931
14
NYHR 1902
Chapel Hill Channel, south end
40.475935
-074.04975
12
NYHR 1903
Ambrose Channel
40.5176
-073.9747
11
NYHR 1904
Rockaway Inlet Jetty 1NM SW of
40.53266
-073.96053
16
NYHR 1905
Rockaway Inlet
40.5688
-073.93616
12
NYHR 1906
Ward Point Bend
40.50425
-074.25665
12
NYHR 1907
Arthur Kill Port Socony
40.54932
-074.24942
12
NYHR 1908
Arthur Kill Tremley Point
40.58896
-074.20586
12
NYHR 1909
Arthur Kill Gulfport
40.62957
-074.20347
16
NYHR 1910
North of Shooters Island
40.64746
-074.1611
18
NYHR 1911
Bergen Point
40.64414
-074.14783
18
NYHR 1912
Port Richmond
40.644
-074.13
19
NYHR 1913
Middle Reach Newark Bay
40.67625
-074.135
16
NYHR 1914
Constable Hook Approch
40.65086
-074.0641
20
NYHR 1915
Robbins Reef Light 0.6 NM E of
40.65569
-074.05053
17
NYHR 1916
Claremont Terminal Channel Ent.
40.66991
-074.05417
12
NYHR 1917
Gowanus Bay Ent
40.66242
-074.01815
13
NYHR 1918
Red Hook
40.67416
-074.02179
13
NYHR 1919
Dimond Reef
40.69668
-074.01248
15
NYHR 1920*
Brooklyn Bridge
40.706
-073.9975
17
NYHR 1921*
Corlears Hook
40.7097
-073.97613
19
NYHR 1922
Newtown Creek
40.7371
-73.9639
9
NYHR 1923*
Hell Gate
40.7783
-73.9383
14
NYHR 1924*
Middle Ground
40.7917
-073.91297
13
NYHR 1925
Harlem River, South entrance
40.7856
-073.93773
8
NYHR 1926
Hudson River Entrance
40.708
-074.025
19
NYHR 1927
Hudson River, Pier 92
40.7705
-074.00306
18
NYHR 1928
Hudson River, Grants Tomb
40.8138
-073.9682
19
NYHR 1929
Rockaway Bay Channel
40.5729
-073.885017
13
NYHR 1930
Raritan River Entrance
40.50868
-074.29068
11
NYHR 1931
Plum Island, Shrewbury River
40.3963
-073.97896
7
NYHR 1932
Jamaica Bay
40.6267
-073.8833
11
NYHR 1933**
Hudson / Harlem River Entrance North
40.8791
-073.92873
~18
NYHR 1934**
Newtown Creek Entrance
40.7376
-073.9604
~10

Notes: for Table 1 apply to Table 3

Figure 2 Chart showing all stations