v1.6_FEBRUARY2021
SOLE SOURCE JUSTIFICATION
DC/DC CONVERTERS
PR 1300924837
DESCRIPTION OF REQUIREMENT:
The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT), requires DC-DC Converters to fix major line replaceable units (LRUs) in
The DC-DC Converters have a 72-week lead-time with the required delivery date of 1 December 2022. Anticipated total value is
Requirement:
Task Cost Schedule Development Effort
MFG Part Number Description / Title Quantity G608321-1 Rev. F DC/DC Power Convertor 20 each G608321-2 Rev. F DC/DC Power Convertor 10 each G608321-3 Rev. F DC/DC Power Convertor 10 each G608321-4 Rev. F Ripple Attenuator Module 20 each
SOLE SOURCE JUSTIFICATION:
The DC-DC Converter is a sub-component of the Power Supply, Power Module which is a Raytheon manufactured part, number G608321. Assurance Technology Corporation (ATC) Power Systems is the original equipment manufacturer (OEM) of the DC-DC Converter which are the direct replacement parts to support repair of SubHDR mast LRU CCAs. ATC is the only qualified and approved source of supply listed on Raytheon controlled drawing # G608321. The part has limited applications due to the unique nuclear hardening requirements that the supplier has designed and certified the parts to.
In order to release a competitive Request for Quote, NUWCDIVNPT, would have to collaborate with Raytheon and to certify/approve additional vendors to produce this part, which is crucial for SubHDR’s uninterrupted operation. Based on previous obsolescence related design tasks under taken by Raytheon, the Government estimates that the certification / approval process will take forty-eight (48) months and cost , as detailed in the table below. The additional costs and time associated with qualifying additional vendors for this timesensitive acquisition would be impractical to pursue.
v1.6_FEBRUARY2021
2 18 months Supplier Lead time and lot charges
3 3 months Prototype fabrication and Mast LRU integration (Qty 3) 4 6 months Environmental/shock testing at component level 5 3 months Nuclear survivability testing & certification 6 6 months Modification of technical drawing, configuration management processes, and logistics documentation to support material changes
1 12 months Development of hardware to meet space, weight, power, environmental, and functional requirements. Conduct Preliminary Design and Critical Design Reviews
7 6 months Laboratory regression testing to validate SubHDR performance
48 months Total
RESELLERS:
ATC Power Systems is the only source of supply for the required DC-DC Converters.
Requiring Department:
Based on the above, I recommend this acquisition be conducted on a Sole Source basis. I certify the technical data which form the basis of this justification are complete and accurate.
APPROVAL:
Contracting Officer:
Based on the above, I have determined that the circumstances of the contract action deem only one source reasonably available. I certify that this justification is accurate and complete to the best of my knowledge and belief.