130-CGB71-77_505_1_1_-_-.pdf

PDF 286 KB Posted

Attached to
Exhaust Piping Cleaning for USCG Cutter PATOKA — New Orleans, LA
Solicitation number
70Z02925QNEWO085A
Issued by

About this file

The document is a detailed technical drawing (engineering plan) from Coastal Technical Services Co. for Engine & Boiler Exhaust Piping, specifically for ARGO, L.A.M. The drawing (DWG NO.831-P8) provides comprehensive schematic details of exhaust piping systems, including multiple sectional views (Sections A-A, B-B), partial plan hold diagrams, and various technical details labeled as Details 1-C through 1-D. The drawing includes a comprehensive list of materials and revision tracking, with precise measurements and technical specifications for exhaust system components.

The drawing appears to be directly related to the U.S. Coast Guard solicitation (70Z02925QNEWO085A) for exhaust piping cleaning and inspection on the Coast Guard Cutter PATOKA in New Orleans, LA. The technical drawing would likely serve as a critical reference document for vendors bidding on the cleaning and inspection contract, providing the exact specifications and layout of the exhaust piping systems that will need to be serviced.

View the file

Other files

File Type Posted
CGC Patoka SOW Exhaust Cleaning.pdf PDF
75E-WLR_4000_4_1_-_D.pdf PDF
SF1449-21 PATOKA EXHAUST.pdf PDF
SFLC-Std-Spec-0000-(2020).pdf PDF
SFLC-Std-Spec-6310-(2022).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JGPrasch stinfo

File details come from the government source that posted it. Updated .