13-RFP 550671 Replacement of Compressors at Russell Ferry Garage.pdf
PDF 511 KB Posted
- Attached to
- Replacement of Air Compressors at Russel Ferry
- Solicitation number
- 550671
- Issued by
- Wayne County, Detroit City, Michigan
About this file
Summary
This is a Request for Proposals (RFP 550671) issued by the City of Detroit Office of Contracting and Procurement on behalf of the Construction and Demolition Department seeking qualified contractors to provide installation and full replacement of the compressed air system at Russell Ferry Garage, located at 5800 Russell Street, Detroit, Michigan. The project involves selective demolition of existing air piping, installation of new duplex compressors and refrigerated air dryer, installation of a new compressed air piping distribution system, and installation of hose reel stations, filter-regulator-lubricator assemblies, and pressure gauges. The RFP is divided into two phases: Phase I (Design and Preconstruction) requiring site assessment, technical reporting, and design development; and Phase II (Construction) requiring full execution of approved designs with all labor, materials, equipment, supervision, and project management. The pre-proposal conference and mandatory site visit are scheduled for December 10, 2026, at 11:00 AM EST. Questions must be submitted by December 18, 2026. Proposals are due December 22, 2026, at 2:00 PM EST through the EUNA Bonfire Supplier Portal. The contract term is two years, with any renewal options requiring Detroit City Council approval and signature by the Chief Procurement Officer.
Respondents must demonstrate a minimum of three years of experience providing similar services on comparable projects. Proposals will be evaluated on a 100-point scale based on relevant experience (30 points), capacity (10 points), strength of proposal (30 points), past performance (20 points), and pricing (10 points). Additional Detroit Equalization Credits are available for prime contractors and subcontractors meeting criteria such as Detroit headquarters (5 points), Detroit residency (5 points), and small or micro-business status (1-2 points). The successful respondent must furnish a payment and performance bond equal to 100% of the contract value. Invoices will be paid according to the City of Detroit Prompt Payment Ordinance with standard NET 30 terms, and a 10% retainage will be held from all payments until substantial completion, when 5% may be released; remaining retainage releases only after receipt of closeout documentation and warranty information. The contractor is responsible for all permits, costs, project management, daily site supervision, and warranty services. The project is currently experiencing reduced air compressor capacity of 100 ft-lbs of torque compared to the required 500 ft-lbs, limiting fleet maintenance operations and creating safety risks.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 9-Attachment D Committed Work Capacity (7).xlsx | XLSX spreadsheet | |
| 12-Attachment F-2 - Payment Bond.pdf | ||
| 11-Attachment F-1 - Performance Bond.pdf | ||
| 7-Attachment B2 Staff Roster (6).xlsx | XLSX spreadsheet | |
| 8-Attachment C Experience References (6).xlsx | XLSX spreadsheet | |
| 6-Attachment B1 Organizational Chart (6).pdf | ||
| 4-Attachment A - Respondent Questionnaire (RFP).pdf | ||
| 5-Attachment B - Respondent Proposal Introduction and Solution Approach.docx | DOCX document | |
| 3-Attachment A1 Leadership Team (7).pdf | ||
| 10-Attachment E Price Proposal (1).xlsx | XLSX spreadsheet | |
| 2-AI Factsheet.pdf | ||
| 1-TEMPLATE Priority Hiring Letter 2026.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Detroit Office of Contracting and Procurement (OCP)
Request for Proposal –RFP 550671 Russell Ferry Compressors
Revised 08/21/2026 Page 1 of 18
CITY OF DETROIT
OFFICE OF CONTRACTING AND PROCUREMENT
REQUEST FOR PROPOSALS
RFP NO. 550671
Replacement of Compressors at Russell Ferry Garage
Buyer: Eric Cooper
EVENT / ACTIVITY DUE DATE / TIME
ADVERTISEMENT DATE 11/24/2026
PRE-PROPOSAL
CONFERENCE
12/10/2026 11 AM EST
Site Visit at 5800 Russell Street, Detroit MI
QUESTIONS DUE 12/18/2026 on or before
All questions must be submitted online in the Supplier Portal as indicated in Section
3.3 of this RFP.
PROPOSAL DUE DATE * 12/22/2026 @ 2 PM EST
In the Supplier Portal as specified in
Section 4.5 of this RFP.
* Respondents must register in EUNA Bonfire to download bid documents and submit bids. The
City cannot guarantee the accuracy of any bid documents obtained from outside of EUNA, and bids submitted outside of EUNA Bonfire will not be accepted. Detailed resources about registering and bidding, including video tutorials and live, virtual office hours, are available at www.detroitmi.gov/suppliersupport.
Questions about the specifics of this RFP must be asked within the EUNA Bonfire Messages interface for the bid on or before the date and time indicated above. Questions asked via phone, email, and/or other means will not be answered.
https://teams.microsoft.com/meet/250002811610820?p=beGrMF2NeiBDkPHtKq https://aka.ms/JoinTeamsMeeting?omkt=en-US https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDUxNjIzYTctMzIwYS00MmExLThlZjktYjRkMmRkZGUxNWQx%40thread.v2/0?context=%7b%22Tid%22%3a%22e154a760-1d2d-4ef6-8fd3-ebc8b4ef31fd%22%2c%22Oid%22%3a%2290574fc0-50a2-4e9a-a90f-f9b6f305b092%22%7d tel:+14699986602,,391342708 https://dialin.teams.cloud.microsoft/d8d2f7a3-2364-4c9b-ab3d-7f613057a66c?id=391342708 https://dialin.teams.cloud.microsoft/usp/pstnconferencing https://detroit.bonfirehub.com/ http://www.detroitmi.gov/suppliersupport
Request for Proposal –RFP 550671 Russell Ferry Compressors
Revised 08/21/2026 Page 2 of 18
Proposals must be uploaded in EUNA Bonfire on or prior to the date and time indicated above.
Late and/or emailed proposals will not be accepted.
Revised 08/21/2026 Page 3 of 18
TABLE OF CONTENTS
Section 1. Project Summary and Background
1.1. PROJECT REQUEST
1.2. BACKGROUND/DESCRIPTION OF ENVIRONMENT
1.3. AWARD CLAUSE INCLUDING RENEWAL OPTIONS
Section 2. Statement of Work
2.1. SERVICES TO BE PERFORMED
2.2. OPERATIONAL INFORMATION
2.3. TECHNICAL INFORMATION
2.4. PAYMENT & PERFORMANCE BOND (Construction)
Section 3. Proposal Evaluation and Selection Process
3.1. MINIMUM QUALIFICATIONS
3.2. ADHERENCE TO TERMS OF PROPOSALS
3.3. QUESTION DEADLINE
3.4. EVALUATION CRITERIA
3.5. EVALUATION PROCEDURE
3.6. ORAL PRESENTATION/DEMONSTRATION
3.7. REJECTIONS, MODIFICATIONS, CANCELLATIONS
3.8. PROTESTS
Section 4. Required Proposal Content and Submission Process
4.1. ACCURACY AND COMPLETENESS OF INFORMATION
4.2. REQUIRED PROPOSAL CONTENT AND FORMAT
4.3. REQUIRED COST PROPOSAL
4.4. ECONOMY OF PREPARATION
4.5. SUBMITTAL INSTRUCTIONS
Section 5. General Conditions and Requirements for RFP
5.1. CONTRACT APPROVAL
5.2. PAYMENT
5.3. INVOICES
5.4. ASSIGNMENT
5.5. MODIFICATION OF SERVICES AFTER CONTRACT APPROVAL
5.6. NEWS RELEASE
5.7. MISCELLANEOUS
5.8. OFFICE OF INSPECTOR GENERAL
RFP Attachments List
Revised 08/21/2026 Page 4 of 18
Section 1. Project Summary and Background
1.1. PROJECT REQUEST
The City of Detroit Office of Contracting and Procurement (OCP) on behalf of Constructing and
Demolition department requests proposals from qualified Respondents to render certain technical or professional services ("Services") as set forth in this RFP to provide installation and full replacement of the compressed air system at Russell Gerry Garage located at 5800 Russell Street, Detroit, MI 48211.
1.2. BACKGROUND/DESCRIPTION OF ENVIRONMENT
The Russell Ferry Garages facility supports the City of Detroit's vehicle maintenance and fleet service operations under the General Services Department. The building houses garage bays and service areas that rely on a centralized compressed air system to support daily maintenance work.
Currently, the air compressor at Russell Ferry is only producing 100 ft-lbs. of torque, compared to the required 500 ft-lbs. This reduced capacity is slowing Fleet Services operations, as staff are forced to perform tasks manually. Replacing the air compressor would improve operational efficiency and significantly reduce the risk of injury. The air compressor is critical for operating tools, installing tires, and performing cleaning tasks.
Improvements will include the following but not limited to:
• Selective demolition of existing air piping
• Installation of new duplex compressors and a refrigerated air dryer
• Installation of a new compressed air piping distribution system
• Installation of hose reel stations, Filter, Regulator, Lubricator assemblies, and pressure gauge
1.3. AWARD CLAUSE INCLUDING RENEWAL OPTIONS
If a contract is awarded as a result of this RFP, it will be a City of Detroit Professional Services
Contract (Attachment E). The term of the contract will be for 2 years. Any renewal option exercised under this contract is effective only after the approval of the Detroit City Council and signed by the Chief Procurement Officer. The City anticipates one or multiple awards as a result of the RFP.
Section 2. Statement of Work
2.1. SERVICES TO BE PERFORMED
SCOPE OF WORK
The scope will require a contractor to complete the necessary replacement needed for indicated building roofs. The selected contractor (Awardee) will be responsible for all aspects of this project as defined in the Scope of Work. The selected awardee will be required to manage the existing air compressor assessment, engineering, and execution of required works to achieve project goals.
Close coordination with CDD staff will be required throughout the process.
Tasks for this project will be divided into two phases (I) Design and Preconstruction Phase; and
(II) Construction phase.
Phase 1 - Design and Preconstruction Phase
Revised 08/21/2026 Page 5 of 18
Assessment
• The Contractor to complete a visual inspection and a walk-thru to assess the site and prepare complete report for the status of the existing premises and services.
• Provide a written technical report supported with photos along with risk assessment to the existing conditions and recommendation on the priority of works that need to be completed to support achieving the project goals.
• Conduct field investigation and review existing mechanical infrastructure as needed.
Design
The selected contractor will be responsible for providing designs to meet or exceed code and contract compliance. The contractor will be asked to find ways to minimize energy consumption, expenses, and maintenance where it’s best fit and within budget.
• Based on approved directions, prepare a complete set of construction documents that are required to obtain permits and to develop a Package for construction.
Permit Services
Trade permits and all City permit requirements are the responsibility of the contractor/subcontractors.
Phase 2 - Construction Phase
During the Construction Phase, the selected contractor will be responsible for renovating and constructing the approved scope to meet or exceed code and contract compliance. The contractor will implement the approved designs, providing all labor, equipment, materials, supervision, and other services that are necessary to complete the scope of work. The major improvement tasks for this project includes by not limited to:
• Selective demo for existing duct work and air system piping (to remove existing equipment)
• Replacing and installing new compressors and refrigerated air dryer
• Install new air distribution system including the necessary fittings and piping
• Install new hose reel stations, FRL assemblies, and pressure gauges
• Disposal if existing system
• Remove and reconnect electrical services to support the air compressor installation
• Remove and reconnect plumbing to support the air compressor installation
• Compressor lead/lag configuration, dryer coordination, leak testing, system pressure adjustments, and full operational check
• Startup, testing, and operator training for City personnel.
General Conditions
Awardee will be responsible and accountable for the below throughout the duration of the contract.
Assessment
• Complete a visual inspection and a walk-thru to assess the site buildings and prepare complete report for the status of the existing roof and associated services.
• Provide a written technical report supported with photos along with risk assessment to the existing conditions and recommendation on the priority of works that need to be completed to support achieving the project goals.
Permits
Revised 08/21/2026 Page 6 of 18
• Provide any required permits and any necessary documents to obtain permits. The awardee is responsible for all permits and the cost should be included in the pricing.
Submittals
• Provide all shop drawings and specifications for the approved scope task. Submittals and all work shall be approved by CDD before construction.
Execution
• Provide Scope Management, Constructability Reviews and Cost Control services throughout the entire project.
• Monitor the project budget throughout the life of the contract.
• Provide a schedule of construction and is responsible for monitoring the progress through project completion.
• Provide the necessary project management and supervisory services as defined by the
Contract Documents and in accordance with the final construction schedule.
• Provide onsite project site supervision for the purposes of daily construction observation, project review and general project oversight.
• Hire any/all subcontractors required including all required trades services/subcontractors to complete the scope of work.
• Provide all necessary staffing and equipment necessary to fully execute the completion of this project.
• Provide construction safety and secure materials throughout the project.
• Provide all necessary dumpsters and tools necessary to maintain the project site and any supporting areas impacted by the work. Keep the site clean and free of any trash or construction debris throughout construction daily. Provide a final clean throughout the entire work site, this includes cleaning out all roof gutters.
• Contractor will be responsible for ensuring that the project site is free of screws/fasteners that could cause injury or property damage.
• Provide any necessary cover to protect the interior from dust and/or water during the installation.
• Coordinate access with CDD for the duration of the project.
Progress Updates
• Conduct regular meetings with the City of Detroit to discuss and coordinate progress.
Host construction project progress meetings and take meeting minutes.
• Provide support and guidance to the City of Detroit throughout the entire project.
• Provide monthly report including but not limited to: Percentage of completed work packages, detailed cost estimate for work packages as per agreed on scope of work.
• Take daily progress photos, dated, and labeled. These will be sent by email to the CCD project manager and filed in a shared drive and/or saved in construction management software.
• Prepare payment and invoice requests, verify accuracy and forward for review and approval and payment.
• A 10% retainage shall be withheld from all items, including but not limited to fees, general conditions, and any services, until the project reaches Substantial Completion, as determined by CDD. Upon Substantial Completion, 5% retainage may be released.
The remaining retainage will be released only after receipt of all closeout documents, the required Certificate of Completion, and warranty information.
Revised 08/21/2026 Page 7 of 18
• Invite and conduct site visits at major milestones, including but not limited to pre assessment walk, rough-in of new equipment, above ceiling rough-ins, during finishes installation, punch list walk.
Close Out
• At the completion of construction, perform all final project walk-throughs with the
CDD project manager, facilities maintenance staff, and building occupant representative for final Owner acceptance of the project.
• Provide the original and digital copy of the certificate of occupancy and/or certificate of completion.
• The Contractor shall participate in a formal project turnover meeting with the owner.
At a minimum, the turnover meeting shall include:
Walkthrough of Close-Out Documentation
• Warranties (labor, materials, and equipment)
• O&M manuals
• As-built drawings
• Final inspection documentation
Formal Turnover Date
• Confirmation of the date Facilities assume operational responsibility
Warranty Period Confirmation
• Warranty start date
• Warranty end date(s)
• Equipment-specific warranty terms with their start date and end date
• The Contractor shall provide complete warranty documentation in an organized and electronic format acceptable to the Owner. Required data includes, at a minimum:
• Warranty start date
• Warranty end date
• Contractor information o Major equipment warranties, including Manufacturer, Model
Number, and Serial Number
• The warranty period shall commence upon Substantial Completion/Final
Acceptance as documented by the Owner and shall remain effective throughout the defined warranty period. The Contractor shall be responsible for all warranty-related labor, materials, and repairs at no additional cost to the Owner. The Contractor shall be required to but not limited to:
• Attend required turnover meetings with Facilities.
• Participate in scheduled 6-month and 11-month warranty walkthroughs post the warranty date with the Owner and Facilities.
• Respond promptly to warranty claims and correct deficiencies within a mutually agreed timeframe
• Provide all spare/extra materials to CDD facility maintenance.
2.2. OPERATIONAL INFORMATION
Awarded Contractor(s) will work closely with City agency staff.
Revised 08/21/2026 Page 8 of 18
The Respondent is expected to provide service in accordance with the terms of the executed contract and under the rules, regulations, and supervision of the City.
2.3. TECHNICAL INFORMATION
City Data Standards
The City is committed to centralizing and warehousing Data for the purpose of improving service delivery and enabling cross departmental analytics. The System must enable Data access, Data interoperability, warehousing of resulting Data, and adherence to City data standards which the City has provided to the Contractor for review.
Specifically, the System requires:
• We require access to all System data for automated data warehousing purposes, provided through at least one of the following machine-readable methods:
o Preferred: Direct database access, or access to a reporting database
(ODBC-compatible) o Alternative: API access providing data in one or more of the following formats: JSON, CSV, or XML
• Full documentation of APIs (including field names and objects) and the database schema used by the application.
• Ability for City to programmatically update data within the System as needed via
API
• Any location-based data or platform utilizes the City’s base units geocoder, Base
Units Database, and/or address Data standards as applicable.
• The ability for the City to use and govern Data as it deems necessary--centralizing it, porting it into other systems, and using it for additional and future organizational needs.
• Data collected, transferred and stored meet minimum standards to ensure confidentiality, integrity and availability.
• Data to meet compliance rules / regulations in order to ensure the sensitive digital assets are guarded against loss, theft and misuse. These rules come in a number of forms including applicable industry compliance / standards (i.e. HIPAA, PII, PCI-
DSS, NIST, ISO), state or federal-level laws or even supra-national regulations.
• The System must have the capacity to store field-level metadata and display it in the user interface when appropriate
• API is able to provide Data in a JSON format.
Specifications, Change of Specification, and Errors or Omission. Specifications which refer to brand names are given for reference. Respondents may quote on equivalent articles, provided that brand name and catalog number(s) and any deviations are noted on the bid form and complete descriptive literature is furnished. Exceptions will state “Do Not Substitute.”
The decision of the City shall be final.
Revised 08/21/2026 Page 9 of 18
2.4. PAYMENT & PERFORMANCE BOND (Construction)
The successful respondent(s) must furnish a payment and performance bond in the amount of
100% of the contract value specified in the contract guaranteeing the contract will be accepted if tendered an award. See Attached Bond Form(s) for requirements.
Section 3. Proposal Evaluation and Selection Process
3.1. MINIMUM QUALIFICATIONS
Proposals will only be accepted from those firms demonstrating a minimum of 3 years of experience providing the services requested in the RFP for projects of similar scope and size.
3.2. ADHERENCE TO TERMS OF PROPOSALS
A proposal once accepted by the City of Detroit, may become a binding contractual obligation of the Respondent. The failure of a successful Respondent to accept this obligation and to adhere to the terms of the Respondent’s proposal may result in rejection of the proposal and the cancellation of any provisional award to the respondent. Respondents are not permitted to take advantage of any errors or omissions in specifications since full instructions will be given should they be discovered before bid submission date.
3.3. QUESTION DEADLINE
All questions regarding the RFP shall be submitted through the Supplier Portal no later than the time and date specified in the solicitation. In the interest of transparency, only written questions will be accepted. Answers to questions will be posted within the Supplier Portal. The
City of Detroit does not guarantee a response to questions submitted after the question deadline.
Should a Respondent be in doubt as to the true meaning of any portion of this RFP or find any patent ambiguity, inconsistency, or omission herein, the Respondent must make a written request for an official interpretation or correction in accordance with the instructions for submitting questions as specified in this RFP.
Respondents are advised that no oral interpretation, information or instruction by an officer or employee of the City of Detroit shall be binding upon the City of Detroit.
Respondents requesting changes to the RFPs terms and conditions, specifications, quantities, etc.;
or if clarifications are needed, must make the request in writing by the stated bid submission deadline.
3.4. EVALUATION CRITERIA
Technical Proposals will be evaluated before Cost Proposals are reviewed.
Proposal Evaluation Criteria Possible
Points
1. Relevant Experience 30
2. Capacity (Key staff, resumes, org chart, equipment) 10
3. Strength of Proposal 30
4. Past Performance 20
5. Pricing 10 http://www.michigan.gov/SIGMAVSS
Revised 08/21/2026 Page 10 of 18
Total Points Possible 100
Detroit Equalization Credits – Prime Contractor Possible
Points
Detroit Headquartered Business 5
Detroit Based Business 2
Detroit Resident Business 5
Construction Workforce Investment Business (Construction over $1M) 3
Construction Workforce Development Business 3
Detroit Small Business 1
Detroit Micro Business Concern 2
Joint Venture 2
Mentor Venture 1
Construction Workforce Development and Construction Workforce Investment credits are applicable to High Impact Construction Projects (over $1M).
Business can only be either a Detroit Small Business or Detroit Micro Business Concern but not both. Business can only be a Joint Venture or a Mentor Venture but not both.
The percentage of work will be determined by the budget allocated to the named CRIO certified contractor as a fraction of the overall project budget.
Detroit Equalization Credits – SubContractor Possible Points
Detroit Headquartered Business 5 x % of work
Detroit Based Business 2 x % of work
Detroit Resident Business 5 x % of work
Construction Workforce Investment Business* 3 x % of work
Construction Workforce Development Business* 3 x % of work
Detroit Small Business 1 x % of work
Detroit Micro Business Concern 2 x % of work
Maximum Points Possible 10
*Applicable to High Impact Construction Projects over $1 million.
3.5. EVALUATION PROCEDURE
Following the receipt of proposals, a City designated Evaluation Committee will evaluate each response. All PROPOSALS, which meet the required format of this RFP, will be evaluated. Any proposals determined to be non-responsive to the specifications or other requirements of the RFP, including instructions governing submission and format, will be disqualified unless the City determines, in its sole discretion, that non-compliance is not substantial or that an alternative proposed by the Respondent is acceptable.
The City may also at its discretion, request oral presentations, make site visits at Respondent’s facility and may request a demonstration of Respondent’s operations. If scheduled, a final determination will be made after the oral presentations and/or demonstrations are complete.
Revised 08/21/2026 Page 11 of 18
The City may also at its sole discretion, elect to rank order the qualified proposals, and negotiate with some limited number of the highest scored qualified respondents. A final determination would include the cumulative inputs of this evaluation procedure. All decisions reached by the Evaluation
Committee will be by consensus.
Any of the additional data specs and standards described in Section 2.3, that are met will be factored positively into the overall score.
3.6. ORAL PRESENTATION/DEMONSTRATION
The City reserves the right, at its own discretion, to request oral presentations regarding proposals submitted in response to the RFP. Failure to make an oral presentation will be grounds for rejection of your proposal. Respondents will be notified by the Office of Contracting and Procurement of the date, time and location for oral presentations.
3.7. REJECTIONS, MODIFICATIONS, CANCELLATIONS
The City of Detroit expressly reserves the right to:
1) accept or reject, in whole or in part, any and all proposals received;
2) waive any non-conformity;
3) re-advertise for proposals;
4) withhold the award for any reason the City determines;
5) cancel and/or postpone the request for proposals, in part or in its entirety, and/or,
6) take any other appropriate action that is in the best interest of the City.
This RFP does not commit the City of Detroit to award a contract, to pay any cost incurred in the preparation of a proposal under this request, or to procure or contract for services.
3.8. PROTESTS
An actual or prospective bidder whose direct economic interest would be affected by the award of a contract, or by the failure to award a contract, has the right to protest any aspect of the solicitation, evaluation, or selection process of this City of Detroit procurement. All protests must be submitted in writing and received by the applicable deadline stated below.
Filing Deadlines
Protest of solicitation terms. A protest challenging the terms of this solicitation must be received by the City no later than 4:00 p.m. EST on the business day prior to the scheduled solicitation closing date. Failure to meet this deadline waives the protester’s ability to challenge the terms of the solicitation.
Protest of contract award. Where this solicitation results in a contract award, a protest challenging the award must be received by the City no later than 4:00 p.m. EST on the fifth (5th) business day after the award. Failure to meet this deadline waives the protester’s ability to challenge the contract award.
How to Submit
All protests must be submitted in writing through the designated procurement portal in which this solicitation was posted. Protests submitted by any other method will not be accepted. The City is not required to consider any material filed after the applicable protest deadline unless the Chief
Procurement Officer specifically requests it.
Revised 08/21/2026 Page 12 of 18
Required Content of a Protest
A protest must be in writing and must contain all of the following:
1. The protester’s contact information (name, business name, address, phone, and email).
2. The solicitation reference number.
3. A concise statement of whether the protester is contesting the terms of the solicitation or the award of the contract, including a description of the specific law, procurement policy, or guiding provision the City is alleged to have violated.
4. A detailed statement of the relevant facts underlying the protest, with supporting documents attached as necessary. This statement must indicate whether the protester is an actual or prospective bidder and must describe facts demonstrating the protester’s direct economic interest in the outcome.
5. Identification of any proposed action the protester recommends be taken, and the protester’s rationale for that action.
6. If submitted by an organization, the signature of an officer of that organization; otherwise, the signature of the individual bidder/protester.
7. The signature described above must appear immediately after the following declaration:
“I declare, under penalty of perjury and pursuant to MCL Section 750.423(s), that this protest is being submitted to protest the solicitation or contract award identified above, and for no other reason, and further, that I have reviewed the facts and circumstances contained within this protest, and they are true and accurate to the best of my information, knowledge and belief.”
Review and Decision
The Chief Procurement Officer (CPO), or as delegated the Deputy CPO, has sole authority to respond to, decide, and act upon supplier protests. The City will render a written response to the protester within ten (10) business days of receipt. This period may be extended upon written notice by the CPO, in the CPO’s sole discretion, and the CPO may require the protester or other bidders to provide additional documentation or statements. The decision of the CPO is the final decision of the City.
Revised 08/21/2026 Page 13 of 18
Section 4. Required Proposal Content and Submission Process
4.1. ACCURACY AND COMPLETENESS OF INFORMATION
All information pertaining to the prospective respondent’s approach in meeting the requirements of the RFP shall be organized and presented in the prospective respondent’s proposal. The instructions contained in this RFP must be strictly followed.
Accuracy and completeness are essential. Omissions and ambiguous or equivocal statements will be viewed unfavorably and may be considered in the evaluation. Since all or a portion of the successful proposal may be incorporated into any ensuing contract, all prospective respondents are further cautioned not to make any claims or statements that cannot be subsequently included in a legally binding agreement.
4.2. REQUIRED PROPOSAL CONTENT AND FORMAT
To be considered responsive, each proposal must, at a minimum, respond to the following RFP sections in their entirety, responses must be uploaded in the Supplier Portal along with the Affidavit of Disclosure Interests Form and Non- Collusion Affidavit found under requirements section of the of RFP#550671:
Required Response Item
1. Attachment A – Respondent Questionnaire
Respondent shall provide their Organization Experience and Capacity/Staffing, per the requirements provided in Attachment A.
2. Attachment B – Proposal Introduction and Solution / Approach
Respondent shall provide their Proposal Introduction and Solution / Approach per the requirements provided in Attachment B.
3. Attachment C – Pricing
Respondent shall provide their Pricing proposal, per the requirements provided in
Attachment C.
4. Attachment D1 – Forms, Affidavits and Documents – Bid Requirements
Respondent shall provide their completed Certificate of Authority, Non-Collusion
Affidavit, and Affidavit of Disclosure of Interests, in Attachment D1.
5. Attachment D2 – Conditions of Award - Award Winners Only
Respondent will be required to provide their completed Forms, Affidavits, Insurance and
Documents, if they are selected as the award winner provided in Attachment D.
6. Attachment E – Model Professional Services Contract
Respondent shall provide their agreement to the Model Professional Services Contract or note any exceptions provided in Attachment E.
7. Attachment F – Payment Bond Form
Attachment F – Performance Bond Form
Respondent must agree to furnish a payment and performance bond in the amount of
100% of the contract value specified in the contract guaranteeing the contract will be accepted if tendered an award (see Section 2.4 Payment & Performance Bond and
Attachment F – Performance Bond Form for requirements).
4.3. REQUIRED COST PROPOSAL
Respondents are requested to make a firm cost proposal to the City of Detroit, through the completion of Attachment C. If a contract is entered into as a result of this RFP, it will be a contract
Revised 08/21/2026 Page 14 of 18 for fees as related to providing all requested services, with a price not to exceed the total price quoted in the proposal. The City of Detroit reserves the right to select proposals from the most responsible Respondents with the most reasonable costs. The City reserves the right to select one or more firms to perform all or separate parts of this function.
4.4. ECONOMY OF PREPARATION
Proposals should be prepared simply and economically providing a straightforward, concise description of the Respondent’s ability to meet the requirements of the RFP. Emphasis should be on the completeness and clarity of content.
4.5. SUBMITTAL INSTRUCTIONS
All proposals must be submitted through the Bonfire/EUNA Procurement Supplier Portal at detroit.bonfirehub.com. Each Respondent is responsible for ensuring that its proposal is received by the City on a timely basis. Faxed or mailed proposals will not be accepted.
Firms shall not distribute their proposals to any other City office or City employee. Proposals received become the property of the City. The City is not responsible for any costs associated with preparation or submission of proposals. All proposals submitted by the due date will be recorded in the Supplier Portal. Responses received will not be available for review. Proposals received will be subject to disclosure under the state of Michigan’s Freedom of Information Act. An officer of the company authorized to bind the company to a contractual obligation with the City must sign the proposals in the Supplier Portal. The successful respondent will receive an award letter.
Respondents who are not awarded will receive a notification that the award decision has been made.
Support Channels for Technical Difficulties and Questions Visit https://detroitmi.gov/suppliersupport for:
- Guides on how to register in EUNA
- Guides on how to submit a response to the solicitation
- FAQs
Contact Bonfire’s technical support in the portal for:
- Technical issues with the e-bidding portal
- Registration problems
- Help submitting responses through the system
Contact the City (eprocurement@detroitmi.gov) for:
- General procurement process questions
- City-specific requirements and policies
For Solicitation/Project-Specific Questions:
- Submit all solicitation-related questions through the Public Q&A tab in the Bonfire/EUNA
Procurement portal. This ensures all vendors receive the same information and maintains transparency in the bidding process. Emails and calls regarding solicitation-specific questions will not receive a response.
https://detroitmi.gov/suppliersupport https://detroit.bonfirehub.com/portal/support mailto:eprocurement@detroitmi.gov
Revised 08/21/2026 Page 15 of 18
Section 5. General Conditions and Requirements for RFP
5.1. CONTRACT APPROVAL
Upon contract award, the City and the successful Respondent shall execute a professional services contract, which shall contain all contractual terms and conditions in a form provided by the City.
No contract shall become effective until the contract has been approved by the required City
Departments and Detroit City Council and signed by the City of Detroit Chief Procurement Officer.
Prior to the completion of this approval process, the successful Respondent shall have no authority to begin work under the contract. The Chief Financial Officer shall not authorize any payments to the successful Respondent prior to such approvals; nor shall the City incur any liability to reimburse the successful Respondent regarding any expenditure for the purchase of materials or the payment of services.
5.2. PAYMENT
All properly executed invoices submitted by the successful Respondent will be paid in accordance with the City of Detroit Prompt Payment Ordinance.
5.3. INVOICES
Vendors must be registered in City of Detroit Vendor Portal and be a registered vendor with the
City of Detroit to submit invoices and receive payments. Go to http://www.detroitmi.gov/Supplier to register.
AUTHORIZATION TO COMMENCE WORK OR SHIP GOODS –
READ CAREFULLY
Contractors may begin work or ship goods upon receipt of the required authorization, which is the
CPA (Contract Purchase Agreement), in addition to SPO (Standard Purchase Order), from
Procurement.
The CPA (City Council Approved and Awarded Contract Purchase Agreement) alone is not authorization to begin work.
**Work commencing without issuance of the Purchase Order is subject to Payment Delays and/or Non-Payment **
Required vendor steps to invoice:
1) Vendors should submit their invoices via City of Detroit Oracle Vendor Portal. Portal invoice amount and creation date must match the date on attached invoice. Please follow the below invoice requirements:
Invoice MUST contain or have as attachment:
• Vendor Name and address on Invoice
• Contact Info on Invoice (Accounts Receivable contact with phone and email)
• Remittance information (MUST be included, or the invoice is subject to rejection
• City of Detroit contact (person who authorized work to commence)
• Invoice Date
• Date of service/delivery http://www.detroitmi.gov/Supplier https://ebkk.login.us8.oraclecloud.com/oam/server/obrareq.cgi?ECID-Context=1.006GbR8nJ1j0zkVay1Na6G001bnV0000sM%3BkXjE
Revised 08/21/2026 Page 16 of 18
• Contract number
• Purchase order number
• Total Invoice amount
• The wording “Goods/Services” (must be noted on every invoice)
Other invoice requirements:
• Invoice must be billed based on Purchase Order/Contract rates
• Total invoice amount must tie to the total supporting documents
• Supporting documentation must be attached to the invoice in the portal
Terms are standard NET 30 Days, unless otherwise negotiated, and start from the invoice receipt date, provided that the invoice is submitted timely to the City's AP department with the necessary supporting documentation.
If you need payment assistance, please contact the Office of Departmental Financial Services
(ODFS) 313-410-7804.
For technical assistance, please visit detroitmi.gov/suppliersupport.
5.4. ASSIGNMENT
The services to be performed by the successful Respondent shall not be assigned, sublet, or transferred, nor shall the successful Respondent assign any monies due or to become due to him under any contract entered into with the City pursuant to these specifications, without prior written approval of the City.
5.5. MODIFICATION OF SERVICES AFTER CONTRACT APPROVAL
The City reserves the right to modify the services provided by the successful Respondent awarded a contract. Any modification and resulting changes in pricing shall be made by amendment to the contract by the successful Respondent and the City.
5.6. NEWS RELEASE
News releases pertaining to these proposal specifications or the provisions to which they relate shall not be made without prior approval of the City and then only in coordination with the City.
5.7. MISCELLANEOUS
It shall be the responsibility of the Respondent to thoroughly familiarize themselves with the provisions of these specifications. After executing the contract, no consideration will be given to any claim of misunderstanding.
The Respondent agrees to abide by the rules and regulations as prescribed herein by the City as the same now exists or may hereafter from time to time be changed in writing.
Contractors are encouraged to contract with small and minority businesses, women's business enterprises, labor surplus area firms and Detroit businesses. The City strongly encourages the hiring of Detroit residents whenever possible by contacting Detroit At
Work for your hiring needs. Visit the Detroit At Work website for specific contact information regarding these opportunities.
https://urldefense.com/v3/__https:/descmiworks.org/business-services/__;!!NcXZSU8rfchoEksI!efgwb7Az7YQ1WNYz08X3skt7ah9Lt0tZnoFrliM4GlUH9iYP4Dtz_l03Xya-8iVDi2esZRdC59m0O9Xl8DlelS4a5w$
Revised 08/21/2026 Page 17 of 18
Contractors are encouraged to employ innovative approaches, including ethically and responsibly leveraging artificial intelligence and advanced technologies, to enhance goods delivery, services, and operational performance. Vendors using AI solutions will be asked to provide information on how the AI solution functions.
5.8. OFFICE OF INSPECTOR GENERAL
5.8.1. In accordance with Section 2-106.6 of the City Charter, this Contract shall be voidable or rescindable at the discretion of the Mayor or Inspector General at any time if a Public Servant who is a party to the Contract has an interest in the Contract and fails to disclose such interest.
5.8.2. This Contract shall also be voidable or rescindable if a lobbyist or employee of the contracting party offers a prohibited gift, gratuity, honoraria or payment to a Public Servant in relation to the Contract.
5.8.3. A fine shall be assessed to the Contractor in the event of a violation of Section 2-106.6 of the
City Charter. If applicable, the actions of the Contractor, and its representative lobbyist or employee, shall be referred to the appropriate prosecuting authorities.
5.8.4. Pursuant to Section 7.5-306 of the City Charter, the Inspector General shall investigate any
Public Servant, City agency, program or official act, contractor and subcontractor providing goods and services to the City, business entity seeking contracts or certification of eligibility for City contracts and person seeking certification of eligibility for participation in any City program, either in response to a complaint or on the Inspector General’s own initiative in order to detect and prevent waste, abuse, fraud and corruption.
5.8.5. In accordance with Section 7.5-310 of the City Charter, it shall be the duty of every Public
Servant, contractor, subcontractor, and licensee of the City, and every applicant for certification of eligibility for a City contract or program, to cooperate with the Inspector
General in any investigation pursuant to Article 7.5, Chapter 3 of the City Charter.
5.8.6. Any Public Servant who willfully and without justification or excuse obstructs an investigation of the Inspector General by withholding documents or testimony, is subject to forfeiture of office, discipline, debarment or any other applicable penalty.
5.8.7. As set forth in Section 7.5-308 of the City Charter, the Inspector General has a duty to report illegal acts. If the Inspector General has probable cause to believe that any Public Servant or any person doing or seeking to do business with the City has committed or is committing an illegal act, then the Inspector General shall promptly refer the matter to the appropriate prosecuting authorities.
For purposes of this Article: “Public Servant” means the Mayor, members of City Council, City Clerk, appointive officers, any member of a board, commission or other voting body established by either branch of City government or the City Charter, and any appointee, employee or individual who provides services to the City within or outside of its offices or facilities pursuant to a personal services contract.
Revised 08/21/2026 Page 18 of 18
RFP Attachments List
The following Attachments are available to download on the Supplier Portal.
Attachment A - Respondent Questionnaire
Attachment A1 – Leadership Team
Attachment B - Proposal Introduction and Solution / Approach
Attachment B1 - Organizational Chart
Attachment B2 – Staff Roster
Attachment C- Experience-References
Attachment D – Committed Work Capacity
Attachment D1&D2 - Forms, Affidavits and Documents
Attachment E – Price Sheet
Attachment E2 - Model Professional Services Contract
Attachment F - Payment Bond Form
Attachment F - Performance Bond Form
| Section 1. Project Summary and Background |
| 1.1. PROJECT REQUEST |
| 1.2. BACKGROUND/DESCRIPTION OF ENVIRONMENT |
| 1.3. AWARD CLAUSE INCLUDING RENEWAL OPTIONS |
| Section 2. Statement of Work |
| 2. |
| 2.1. SERVICES TO BE PERFORMED |
| 2.2. OPERATIONAL INFORMATION |
| 2.3. TECHNICAL INFORMATION |
| 2.4. PAYMENT & PERFORMANCE BOND (Construction) |
| Section 3. Proposal Evaluation and Selection Process |
| 3. |
| 3.1. MINIMUM QUALIFICATIONS |
| 3.2. ADHERENCE TO TERMS OF PROPOSALS |
| 3.3. QUESTION DEADLINE |
| 3.4. EVALUATION CRITERIA |
| 3.5. EVALUATION PROCEDURE |
| 3.6. ORAL PRESENTATION/DEMONSTRATION |
| 3.7. REJECTIONS, MODIFICATIONS, CANCELLATIONS |
| 3.8. PROTESTS |
| Section 4. Required Proposal Content and Submission Process |
| 4. |
| 4.1. Accuracy and Completeness of Information |
| 4.2. REQUIRED PROPOSAL CONTENT AND FORMAT |
| 4.3. REQUIRED COST PROPOSAL |
| 4.4. ECONOMY OF PREPARATION |
| 4.5. SUBMITTAL INSTRUCTIONS |
| All proposals must be submitted through the Bonfire/EUNA Procurement Supplier Portal at detroit.bonfirehub.com. Each Respondent is responsible for ensuring that its proposal is received by the City on a timely basis. Faxed or mailed proposals will not... |
| Section 5. General Conditions and Requirements for RFP |
| 5. |
| 5.1. CONTRACT APPROVAL |
| 5.2. PAYMENT |
| 5.3. INVOICES |
| 5.4. ASSIGNMENT |
| 5.5. MODIFICATION OF SERVICES AFTER CONTRACT APPROVAL |
| 5.6. NEWS RELEASE |
| 5.7. MISCELLANEOUS |
| 5.8. OFFICE OF INSPECTOR GENERAL |
RFP Attachments List
File details come from the government source that posted it. Updated .