13. JRL Elevator Maintenance Price Schedule.docx
DOCX document 15 KB Posted
- Attached to
- JRL Elevator Maintenance Services
- Solicitation number
- W912DR-24-Q-0015
About this file
This request for quotation from the Department of the Army Corps of Engineers Engineering District Baltimore solicits offers for elevator maintenance services at the Jennings Randolph Lake Intake Control Tower. The performance work statement requires the contractor to provide all labor, equipment, materials and quality assurances necessary to perform elevator inspections, maintenance, repairs and testing in accordance with safety codes and manufacturer specifications. The base period is one year with four one-year option periods exercisable through 2029. Offerors must demonstrate technical and past performance capabilities for similar elevator services. Price quotes are due by February 29, 2024 and award will be made to the lowest priced technically acceptable offeror.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.04.03 Wage Determination.txt | TXT text file | |
| USACE_Past Performance Questionnaire.pdf | ||
| W912DR24Q0015 JRL Elevator Maintenance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jennings Randolph Lake Elevator Maintenance Quote Sheet
ITEM NO
SUPPLIES/SERVICES
QUANITY
UNIT
UNIT PRICE QUARTLEY
AMOUNT
0001 Base Year 3/1/2024 – 2/28/2025
| Provide elevator safety inspections and maintenance in the Intake Control Tower |
| 1 |
| QU |
| $ |
| $ |
0002 Base Year 03/01/2024 – 02/28/2025 Machine Seals and Bearings
1. Completely disassemble the elevator-hoisting machine.
2. Clean and prepare all mating surfaces.
3. Apply new specific duty seals and gaskets to all mating surfaces.
4. Install new bearings
5. Re-Assemble the hoisting machine.
6. Add new specific duty gear lubricant
7. Test machine and inspect any leakage
8. Perform a full load safety test in accordance with A17.1 Code requirements
| 1 |
| QU |
| $ |
| $ |
1001 Option Year 1 3/1/2025 – 2/28/2026
| Provide elevator safety inspections and maintenance in the Intake Control Tower |
| 1 |
| QU |
| $ |
| $ |
2001 Option Year 2 3/1/2026 – 2/28/2027
| Provide elevator safety inspections and maintenance in the Intake Control Tower |
| 1 |
| QU |
| $ |
| $ |
3001 Option Year 3 3/1/2027 – 2/28/2028
| Provide elevator safety inspections and maintenance in the Intake Control Tower |
| 1 |
| QU |
| $ |
| $ |
4001 Option Year 4 3/1/2028 – 2/28/2029
| Provide elevator safety inspections and maintenance in the Intake Control Tower |
| 1 |
| QU |
| $ |
| $ |
NET AMT
File details come from the government source that posted it. Updated .