This is a technical specification document for Hillsborough County's LED Sports Lighting Retrofit and Installation Term Contract B, establishing comprehensive standards for converting existing metal halide sports lighting systems to LED or installing new LED lighting systems across the county's athletic facilities. The project encompasses multiple venue types including baseball/softball fields ranging from 125 to 300 feet, football fields, soccer fields, basketball courts, and tennis courts, with specifications requiring IES Class III lighting levels guaranteed for 25 years on new pole installations and 10 years on existing pole retrofits. The contract is a four-year term with an estimated total project value of $8,000,000, allocated per individual work orders and facility requirements. Contractors must demonstrate qualifications through documentation of at least five similar LED sports field projects completed within the preceding five years, while lighting system manufacturers must provide evidence of ten years of LED sports lighting production and ten similar projects shipped within the previous five years.
The specifications mandate comprehensive performance guarantees including maintained illumination levels with specified uniformity ratios, environmental light control to minimize spill and glare, energy-efficient operation with remote monitoring and control capabilities via web-based platforms, and full maintenance coverage including parts and labor for the warranty period. All equipment must comply with 2017 National Electrical Code, NFPA 780 lightning protection standards, and achieve DLC listing with minimum efficacy of 105 lumens per watt. Contractors are responsible for all permitting, TECO power company coordination, demolition and disposal of existing systems, and structural pole design by Florida-licensed professional engineers. Pricing shall include labor, materials, equipment, trenching, grounding systems, surge protection, control cabinet installation with cellular communications, and 10 or 25 years of active remote monitoring and system management with communication costs included. The specification document provides detailed line-item descriptions for 59 separate work categories including demolition, pole retrofit or new installation, electrical service configurations, surge protection, and supplemental lighting components.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HILLSBOROUGH COUNTY
LED SPORTS FIELD LIGHTING RETROFIT AND INSTALLATION
TERM CONTRACT B
TECHNICAL SPECIFICATIONS
HILLSBOROUGH COUNTY – LED SPORTS LIGHTING
RETROFIT AND INSTALLATION TERM CONTRACT B
-TECHNICAL SPECIFICATION
GENERAL SCOPE OF WORK DESCRIPTION
The following specification has been established by Hillsborough County for the purposes of executing a term contract for specified duration with a qualified contractor to furnish and install LED Sports Lighting Systems, including but not limited to, LED Sports Lighting Luminaires, Poles, Control Cabinets, Controls, Power Distribution, and associated testing, for various selected sports fields and courts, as defined herein. The minimum lighting performance standards have been established as described below and shall be met by all contractors submitting bids.
TABLE OF CONTENTS
DIVISION 26 Electrical 26 0500 Electrical Methods and Requirements 26 0519 Wires and Cables 26 0526 Grounding 26 0529 Supporting Devices 26 0530 Electrical Connections for Equipment 26 0533 Raceways 26 0535 Electrical Boxes and Fittings 26 0553 Electrical Identification 26 2200 Dry Type Transformers 26 2416 Panelboards 26 2616 Circuit and Motor Disconnects 26 2726 Wiring Devices 26 2813 Overcurrent Protective Devices 26 4113 Lightning Protection System 26 4313 Surge Protection Devices 26 5668 LED Sports Field Lighting Systems Appendix 1 Example Sports Field and Court Photometric Calculations
SECTION 26 0500 - ELECTRICAL METHODS AND REQUIREMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 specification sections, apply to work of this section.
B. Furnish and install all electrical wiring, systems, equipment and accessories in accordance with the specifications and drawings. Capacities and ratings of motors, cable, panelboards, etc., and arrangement for specified items in general are shown on drawings.
C. All ampacities herein specified or indicated on the drawings are based on copper conductors, with the conduit and raceways accordingly sized. Aluminum conductors are not permitted.
1.2 MINIMUM REQUIREMENTS
A. References to the National Electrical Code (NEC), Underwriters Laboratories, Inc. (UL), Florida Building Code, and National Fire Protection Association (NFPA) are a minimum installation requirement standard. Design drawings and other specification sections shall govern in those instances where requirements are greater than those specified in NEC.
B. The rules and regulations of the Federal, State, local, civil authorities and utility companies in force at the time of execution of the contract shall become a part of this specification. In addition, the following codes and standards shall apply:
1. Florida Building Code (FBC) 7th Edition (2020):This code includes the 2020 FBC Building, Mechanical, Plumbing, Energy Conservation, Fuel Gas, Accessibility, and Test Protocols volumes. Further, see "Referenced Standards" in the FBC Building Chapter 35; FBC Mechanical Chapter 15; FBC Plumbing Chapter 14; FBC Energy Conservation Chapter 6; and FBC Fuel Gas Chapter 8) (Effective December 31, 2020).
2. 7th Edition of the Florida Fire Prevention Code (FFPC): This code also includes the Florida versions of NFPA 1 and NFPA 101. (Effective December 31, 2020).
3. 2017 National Electric Code.
C. No work shall be done unless the Superintendent of the Contractor is on the job site.
Work shall be properly protected, all rubbish removed promptly, and exposed work shall be carefully cleaned prior to final acceptance.
D. The term "provide" shall include labor, materials, and equipment necessary to furnish and install, complete and operable, the item or system indicated.
E. In decisions arising from discrepancies, interpretation of Drawings and Specifications, substitutes, and other pertinent matters, the decision of the Owner's representative's approval shall be final.
1.3 SPECIFICATIONS AND DRAWINGS
A. Plans show location of fixtures and equipment and are intended to depict the general intent of the work in scope, layout and quality of workmanship. They are not intended to show in minute detail every or all accessories intended for the purpose of executing the work, but it is understood that such details are a part of this work.
B. Where Drawings and Specifications conflict, it shall be the responsibility of this Contractor to bring such conflict to the attention of the Architect/Engineer for clarification. All changes from the Drawings necessary to make the work conform with the building as constructed and to fit the work of other trades or to conform to the rules of authorities having jurisdiction, shall be made by the Contractor at his own expense.
C. Keep a record of the locations of concealed work and of any field changes in Contract Drawings and Specifications for each trade and, upon completion of the job, supply "As- Built" Drawings and Specifications showing in pencil on sepia reproducible, any deviations from the original Drawings, indicating in the Specifications each manufacturer's name underlined or inserted whose product was used on the job. These Drawings shall indicate dimensions of buried utility lines from building walls. One set of sepia reproducible of the original tracings will be furnished upon request for this purpose.
1.4 STANDARDS
A. All material and equipment shall be listed, labeled or certified by Underwriters Laboratories, Inc., where such standards have been established. Equipment and material which are not covered by UL Standards will be accepted provided equipment and material is listed, labeled, certified or otherwise determined to meet safety requirements of a nationally recognized testing laboratory. Equipment of a class which no nationally recognized testing laboratory accepts, certifies, lists, labels, or determines to be safe, will be considered if inspected or tested in accordance with national industrial standards, such as NEMA, or ANSI. Evidence of compliance shall include certified test reports and definitive shop drawings.
B. Definitions:
1. Listed: Equipment is "listed" if of a kind mentioned in a list which:
a. Is published by a nationally recognized laboratory which makes periodic inspection of production of such equipment.
b. States that such equipment meets nationally recognized standards or has been tested and found safe for use in a specified manner.
2. Labeled: Equipment is labeled if:
a. It embodies a valid label, symbol, or other identifying mark of a nationally recognized testing laboratory such as Underwriters Laboratories, Inc.
b. The laboratory makes periodic inspections of the production of such equipment.
c. The labeling indicates compliance with nationally recognized standards or tests to determine safe use in a specified manner.
3. Certified: Equipment is "certified" if:
a. Equipment has been tested and found by a nationally recognized testing laboratory to meet nationally recognized standards or to be safe for use in a specified manner.
b. Production is periodically inspected by a nationally recognized testing laboratory.
c. It bears a label, tag, or other record of certification.
4. Nationally recognized Testing Laboratory: A testing laboratory, which is approved, in accordance with OSHA regulations, by the Secretary of Labor.
1.5 QUALIFICATIONS (PRODUCTS AND SERVICES)
A. Manufacturers Qualifications: The manufacturer shall regularly and presently produce, as one of the manufacturer's principal products, the equipment and material specified for this project, and shall have manufactured the item for at least five years, unless otherwise noted elsewhere in the specifications or on the drawings.
B. Product Qualification:
1. Manufacturer's product shall have been in satisfactory operation on three installations of similar size and type, as this project, for approximately three years.
2. The Owner reserves the right to require the contractor to submit a list of installations where the products have been in operation before approval of said products.
C. Service Qualifications: There shall be a permanent service organization maintained or trained by the manufacturer which will render satisfactory service to this installation within four hours of receipt of notification that service is needed. Submit name and address of service organizations.
1.6 MANUFACTURED PRODUCTS
A. Materials and equipment furnished shall be of current production by manufacturers regularly engaged in the manufacture of such items, for which replacement parts should be available. Items not meeting this requirement, but which otherwise meet technical specifications, and merits of which can be established through reliable test reports or physical examination of representative samples, will be considered.
B. When more than one unit of the same class of equipment is required, such units shall be the product of a single manufacturer.
C. Equipment Assemblies and Components:
1. All components of an assembled unit need not be products of the same manufacturer; however, the assembled unit shall be the responsibility of a single manufacturer and warranted as such.
2. Manufacturers of equipment assemblies, which include components made by others, shall assume complete responsibility for the final assembled unit.
3. Components shall be compatible with each other and with the total assembly for the intended service.
4. Constituent parts which are similar shall be the product of a single manufacturer.
D. All factory wiring shall be identified on the equipment being furnished and on all wiring diagrams.
1.7 EQUIPMENT REQUIREMENTS
A. Equipment voltage ratings shall be in accordance with the requirements indicated on the drawings or as specified.
B. Prior to bid, written approval shall be obtained by the Contractor for any equipment that differs from those specified on the drawings and specifications. The Contractor shall be prepared to submit samples of the equipment when requested at no cost to the Architect/Engineer.
1. The Contractor shall furnish drawings showing all installation details, shop drawings, technical data and other pertinent information as required to determine that the equipment is equivalent in quality and function to the equipment specified.
2. Approval by the Architect/Engineer of the equal equipment does not relieve the Contractor of the responsibility of furnishing and installing the equipment at no additional cost to the Owner.
3. Any other items required for the satisfactory installation of the equal equipment shall be furnished and installed at no additional cost to the Owner. This includes but shall not be limited to additions or changes to branch circuits, circuit protective devices, conduits, wire, feeders, controls, panels and correlation with other work, subject to the jurisdiction and approval of the Architect/Engineer.
C. Catalogue numbers, where given, are intended to give a basis for design, quality and function. Any other incidental equipment needed for a complete and functional installation shall be provided at no additional cost.
1.8 EQUIPMENT PROTECTION
A. Equipment and material shall be protected during shipment and storage against physical damage, dirt, moisture, cold and rain.
B. During installation, equipment, controls, controllers, circuit protective devices, etc., shall be protected against entry of foreign matter; and be vacuum cleaned both inside and outside before testing, operating and painting.
C. Damaged equipment shall be, as determined by the Architect/Engineer, placed in first class operating condition or be returned to the source of supply for repair or replacement.
D. Painted surfaces shall be protected with factory installed removable heavy kraft paper, sheet vinyl or equal.
E. Damaged paint on equipment and materials shall be refinished with the same quality of paint and workmanship as used by the manufacturer so repaired areas are not obvious.
1.9 WORK PERFORMANCE
A. Arrange, phase and perform work to assure electrical service for other buildings at all times.
B. New work shall be installed and connected to existing work neatly and carefully.
Disturbed or damaged work shall be replaced or repaired to its prior conditions.
C. Coordinate location of equipment and conduit with other trades to minimize interferences.
D. Obtain and pay for all required installation inspections and deliver certificates approving installations to the Owner unless directed otherwise.
1.10 EQUIPMENT INSTALLATION AND REQUIREMENTS
A. Equipment location shall be as close as practical to locations shown on the drawings.
Where architectural features govern location of work, refer to architectural drawings.
B. Working spaces shall not be less than specified in the National Electrical Code for all voltages specified.
C. Inaccessible Equipment:
1. Where the Owner/Architect/Engineer determines that the Contractor has installed equipment not conveniently accessible for operation and maintenance, equipment shall be removed and reinstalled as directed at no additional cost to the Owner.
2. "Conveniently accessibility" is defined as being capable of being reached without the use of ladders, or without climbing or crawling under or over obstacles such as motors, pumps, belt guards, transformers, piping, and duct work.
D. Equipment and Material:
1. New equipment and material shall be installed, unless otherwise specified.
2. Equipment and material shall be designed to assure satisfactory operation and operating life for environmental conditions where being installed. NEC and other code requirements shall apply to the installation in areas requiring special protection such as explosion-proof, watertight and weatherproof construction.
E. Utility Services, Costs, and Permitting:
1. Contact the power company as necessary for each project. Make application as required by the power company procedures and policies. Coordinate all scheduling of the power company work such that it coincides with overall project schedule.
Refer to Special Conditions for how the TECO/Power Company costs are to be handled.
2. Make permit application and pay for permit fees. Refer to Special Conditions for how the permit fee costs are to be handled.
F. Continuity of Service:
1. No service shall be interrupted or changed without permission from the Engineer and the Owner. Written permission shall be obtained before any work is started.
2. When interruption of services is required, all persons concerned shall be notified and a prearranged time agreed upon.
G. Concrete Work:
1. Provide all cast-in-place concrete shown on the documents unless noted otherwise.
2. Provide all anchor bolts, metal shapes and templates required to be cast in concrete or used to form concrete for support of electrical equipment.
1.11 EQUIPMENT IDENTIFICATION
A. In addition to the requirements of the National Electrical Code, install an identification nameplate which will clearly indicate information required for use and maintenance of items such as switchboard, panelboards, cabinets, safety switches, separately enclosed circuit breakers, motor starters, communications systems cabinets, control devices and other significant equipment.
B. Nameplates shall be laminated white phenolic resin with a black core with engraved lettering, a minimum of 3/16-inch high. Nameplates that are furnished by manufacturer as a standard catalog item, or where other method of identification is herein specified, are exceptions. Handwritten marker is not acceptable.
1.12 SUBMITTALS
A. The Architect/Engineer's approval shall be obtained for all equipment and material before delivery to the job site. Delivery, storage or installation of equipment or material which has not had prior approval will not be permitted at the job site. Submittals shall be made for all equipment and systems as indicated in the respective specification section.
B. All submittals shall include adequate descriptive literature, catalog cuts, shop drawings and other data necessary for the Architect/Engineer to ascertain that the proposed equipment and materials comply with specification and drawing requirements. Catalog cuts submitted for approval shall be legible and clearly identify equipment being submitted.
C. Submittals for individual systems and equipment assemblies which consist of more than one item or component shall be made for the system or assembly as a whole. Partial submittals will not be considered for approval. Submittals shall be submitted for all applicable products and materials specified in each individual section of these specifications.
D. Make submittals for the equipment and materials in accordance with the following:
1. Mark the submittals, "SUBMITTED UNDER SECTION_______".
2. Submittals shall be marked to show specification reference including the section and paragraph numbers.
3. The submittals shall include the following:
a. Information that confirms compliance with contract requirements. Include the manufacturer's name, model or catalog numbers, catalog information, technical data sheets, shop drawings, pictures, nameplate data and test reports as required. Provide any additional information specifically requested in the individual specification section or on the drawings.
4. Electronic PDF submittal files shall be named utilizing the specification number followed by a sequential number for the submittal made under the given specification number followed by “r#” if it is a resubmittal, and then followed by a brief description of the submitted item.
a. The description shall indicate the actual item submitted, shall not be general in nature, and does not have to be that of the specification section heading.
b. Using the example, “230519-4r2 Differential Pressure Gauge”; 230519 – Meters and Gauges is the relevant specification, the “4” shows it was the fourth submittal for specification section 230519 02,“r2” shows it was the second resubmittal, and the description indicates what item is submitted.
c. Each specification item shall be submitted in a separate PDF file. PDF files with multiple specification items will be returned without review.
d. Each file shall have sufficient space allowance for the Architects and Engineer’s review stamp(s).
e. Each file shall have the Constructions Manager or Contractor review stamp(s) and indicate information required by specification 260500.1.12.F.
E. Submittals and shop drawings shall be electronic PDF files only. Paper copies will not be accepted.
F. The Construction Manager, General Contractor, or “Contractor” shall certify that all Division 26 shop drawings are in conformance with the plans and specifications.
Deviations from the plans and specifications shall be noted, and the specific area of the deviation clouded and in contrasting color (green) with a complete explanation for the reasons for the deviation.
G. Carefully examine all shop drawings and mark-up as necessary before submitting to the Architect/Engineer for review. The consultant will only consider shop drawings bearing the contractor’s stamp of approval.
H. The engineer’s review shall not relieve the contractor from the responsibility for deviations from drawings and specifications. The engineer’s review shall be construed to apply only to general arrangement and shall not relieve the contractor from the responsibility for the correctness of details and dimensions and provision of the correct equipment.
I. The contractor shall retain copies of all reviewed shop drawings on the job site for reference.
J. In addition to the requirement of SUBMITTALS, the Owner reserves the right to request the manufacturer to arrange for the Owner's representative(s) to see typical active systems in operation, when there has been no prior experience with the manufacturer, or the type of equipment being submitted.
K. Refer to all other technical specification sections for additional product submittal and shop drawing submittal requirements.
L. Operation and Maintenance Manuals:
1. Maintenance manuals shall be complete and shall be furnished in a loose-leaf binder or in the manufacturer's standard binder. Information shall be sufficient to enable a qualified technician to perform normal first line maintenance and repair. A parts list shall be included which shall include those replacement parts recommended by the equipment manufacturer, quantity of parts, current price and availability of each part.
2. Operation manuals shall be clear and concise and shall describe, in detail, the information required to properly operate the equipment specified. The manuals shall include complete catalog cuts and as-built wiring diagrams.
3. Operation and maintenance manuals shall be submitted for approval prior to final close-out.
1.13 CUTTING, PATCHING, EXCAVATION, BACKFILL, AND LAYOUT
A. Provide openings and excavation required for the installation of the electrical work. Patch work and backfill as required. Finished work shall match the existing adjoining work.
B. Verify all conditions affecting the work to be performed under this contract.
C. Carefully verify measurements at the site, determine the exact location of chases and openings required. Provide sleeves, inserts, supports, concrete work, and hangers as required. No columns, beams, joists, building foundations nor any other structural building component shall be cut, drilled or disturbed in any way without prior approval.
Conflicts shall immediately be brought to the attention of the Architect/Engineer.
D. All excavation on sites containing existing buildings and existing services, shall be done with hand shovel to avoid damage to existing services. Where hand shovel is not practical extreme caution shall be taken when performing excavation. The contractor will be responsible for locating any existing utilities and adjusting manhole and handhole locations and conduit routing as necessary. Any damage incurred by the Contractor shall be repaired by the Contractor in a manner approved by the Architect/Engineer at no cost to the Owner and with no extension of time limitation.
1.14 EXPERIENCE
A. The Contractor performing this work shall be a licensed, reputable firm, regularly performing the type of work incorporated in this project and who also maintains, as part of the firm, a service department with qualified personnel who regularly perform this type of work. The Contractor shall, upon request, show evidence of at least five jobs of similar character and size installed within the preceding five years.
B. Contractor shall hold all legally required and contractually required licenses, including electrical contractor commercial license (EC), general contractor license when general contracting work applies (CG or CB), and shall hold all legally required and contractually required business licenses for the State of Florida and Hillsborough County.
1.15 REMOVAL OF RUBBISH
A. Contractor shall keep premises free from accumulations of waste material or rubbish caused by his employees or work. At completion of work, he shall remove all his tools, scaffolding, surplus materials, and rubbish from building and site. He shall leave premises and his work in a clean orderly condition acceptable to the Architect/Engineer.
1.16 CLEANING AND ADJUSTMENTS
A. Upon completion of the work, Contractor shall clean and re-lamp all light fixtures, clean and identify all equipment, adjust and test all equipment and apparatus which he has installed and make certain such apparatus and mechanisms are in proper working order and ready to test.
B. During construction protect all conduit and equipment from damage and dirt. Cap the open ends of all conduit and equipment.
1.17 STORAGE OF MATERIALS
A. All materials stored on site shall be properly protected from injury or deterioration.
Materials shall not be stored in contact with ground or floor.
B. Do not remove manufacturer's packing materials until ready to install. Materials showing signs of corrosion, improper handling or storage shall be replaced at no cost to the Owner.
C. Provide continuous protection for all equipment already installed.
1.18 WATERPROOFING
A. Where any work pierces waterproofing including waterproof concrete, the method of installation shall be as approved by the Owner before the work is done.
B. Provide all necessary sleeves, caulking and flashing required to make openings absolutely watertight. Waterproof flashing materials shall be compatible with base materials.
1.19 TESTS
A. Contractor shall make all tests required to establish the adequacy, quality, safety, completed status and satisfactory operation of all systems to the satisfaction of the Architect/Engineer. Provide all instruments, labor and services necessary to conduct tests.
B. All conductors for major feeders and services (400 amps and up) shall be meg ohm to test insulation and connection integrity prior to permanent energization.
C. Refer to 26 05 26 – Grounding, for the required grounding system testing.
1.20 INSTRUCTIONS
A. Fully instruct Owner's personnel in the care and operation of electrical systems, including all communications systems and furnish a letter to the Architect/Engineer advising the particular person(s) who have received such instruction.
1.21 WARRANTY
A. Equipment shall be started, tested, adjusted, and placed in satisfactory operating condition. Furnish a letter addressed to the Architect/Engineer advising that the completed systems have been installed in accordance with the Plans and Specifications and that they are in proper operating condition. The Owner shall receive a written warranty covering all defects in workmanship and material for a minimum period of one year from date of substantial completion. Any defects appearing within this year period shall be repaired or replaced without additional cost to the Owner. Refer to individual specification sections for additional warranty requirements. Longer, extended warranty periods shall apply where specified in any individual specification section.
1.22 ACCEPTANCE
A. Before requesting final inspection:
1. Complete all work required. If any items are held in abeyance as incomplete for final inspection, list such items together with explanation for delay.
2. Submit statement that equipment is properly installed, adjusted, tested and operation is satisfactory.
3. Submit copy of other data as may be outlined in these specifications.
B. Copies of the above data shall be submitted to the Architect/Engineer prior to requesting final inspection.
1.23 SINGULAR NUMBER
A. Where any device or part of equipment is referred to in these specifications in the singular number (such as "the switch"), such reference shall be deemed to apply to as many such devices as are required to complete the installation as shown on the drawings.
1.24 MULTI-WIRE BRANCH CIRCUITS
A. All multi-wire branch circuits shall comply with Article 210.4 of the 2014 National Electrical Code. Provide all required handle ties where applicable multi-wire branch circuits are indicated on the drawings.
END OF SECTION 26 0500 – ELECTRICAL METHODS AND REQUIREMENTS
SECTION 26 0519 - WIRES AND CABLES
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-01 Specification sections, apply to work of this section.
B. This section is a Division-26 Basic Electrical Materials and Methods section and is part of each Division-26 section making reference to electrical wires and cables specified herein.
1.2 DESCRIPTION OF WORK
A. Extent of electrical wire and cable work is indicated by drawings and schedules.
B. Types of electrical wire, cable, and connectors specified in this section include the following:
1. Copper conductors.
2. Fixture wires.
3. Flexible cords and cables.
4. Wire nut connectors.
C. Applications of electrical wire, cable, and connectors required for project are as follows:
1. For motor-branch circuits.
2. For power distribution circuits
3. For lighting circuits
4. For appliance and equipment circuits
1.3 QUALITY ASSURANCE
A. Manufacturers: Firms regularly engaged in manufacture of electrical wire and cable products of types, sizes, and ratings required, whose products have been in satisfactory use in similar service for not less than 5 years.
B. Installer's Qualifications: Firm with at least 5 years of successful installation experience with projects utilizing electrical wiring and cabling work similar to that required for this project.
C. NEC Compliance: Comply with NEC requirements as applicable to construction, installation and color coding of electrical wires and cables.
D. UL Compliance: Comply with applicable requirements of UL Std 83, "Thermoplastic- Insulated Wires and Cables", and Std 486A, "Wire Connectors and Soldering Lugs for Use with Copper Conductors".
E. UL Compliance: Provide wiring/cabling and connector products which are UL-listed and labeled.
F. NEMA/ICEA Compliance: Comply with NEMA/ICEA Std Pub/ No.'s WC 5, "Thermoplastic-Insulated Wire and Cable for the Transmission and Distribution of Electrical Energy", and WC-30, "Color Coding of Wires and Cables", pertaining to electrical power type wires and cables.
G. IEEE Compliance: Comply with applicable requirements of IEEE Stds 82, "Test Procedures for Impulse Voltage Tests on Insulated Conductors", and Std 241, "IEEE Recommended Practice for Electric Power Systems in Commercial Buildings" pertaining to wiring systems.
H. ASTM Compliance: Comply with applicable requirements of ASTM B1, 2, 3, 8, and D-
753. Provide copper conductors with conductivity of not less than 98% at 20oC (68oF).
PART 2 - PRODUCTS
2.1 AVAILABLE MANUFACTURERS
A. Subject to compliance with requirements, manufacturers offering products which may be incorporated in the work include, but are not limited to, the following:
1. Wire and Cable:
a. American Wire and Cable Co.
b. Anaconda-Ericsson Inc; Wire and Cable Div.
c. Belden Div; Cooper Industries
2. Connectors:
a. AMP, Inc.
b. Appleton Electric Co.
c. Burndy Corporation
d. Thomas and Betts Corp.
2.2 WIRES, CABLES, AND CONNECTORS
A. General: Provide electrical wires, cables, and connectors of manufacturer's standard materials, as indicated by published product information; designed and constructed as recommended by manufacturer, for a complete installation, and for application indicated.
Except as otherwise indicated, provide copper conductors with conductivity of not less than 98% at 20oC (68oF).
B. Building Wires: Provide factory-fabricated wires of sizes, ampacity ratings, and materials for applications and services indicated. Where not indicated, provide proper wire selection as determined by Installer to comply with project's installation requirements, NEC and NEMA standards. Select from the following UL types, those wires with construction features which fulfill project requirements:
1. Type THHN, THWN, THHW, XHHW, THHN/THWN: Unless otherwise indicated, all conductors for dry locations requiring a conductor temperature rating 75oC (167oF) or less. Insulation shall be flame retardant, moisture and heat resistant, thermoplastic. Conductor shall be annealed copper.
2. Type THWN, THHW, XHHW, THHN/THWN: Unless otherwise indicated, all conductors for wet or dry locations requiring a conductor temperature rating of 75oC (167oF) or less. Insulation shall be flame retardant, moisture and heat resistant thermoplastic. Conductor shall be annealed copper.
3. Type THHN, THHW, XHHW: Unless otherwise indicated, all conductors for dry locations requiring a conductor temperature rating of 90oC (194oF) or less.
Insulation shall be flame retardant, moisture and heat resistant thermoplastic.
Conductor shall be annealed copper.
4. Type XHHW-2: Unless otherwise indicated, all conductors for wet locations requiring a conductor temperature rating of 90oC (194oF) or less. Insulation shall be flame retardant, moisture and heat resistant thermoplastic. Conductor shall be annealed copper.
5. Conductors for use at 600 volts or below shall be 600 volts rated. Wire No. 12 and smaller may be solid or stranded and wire No. 10 and larger shall be stranded only.
Stranded conductors shall terminate in crimp type lugs.
6. Motor circuit branch wiring and associated control wiring: Provide type THHN insulation in dry and damp locations. Provide type THHW insulation in wet locations. All motor wiring to be stranded copper.
7. Wiring in fluorescent fixture channels: Provide conductors with a 90C temperature rating, type THHN or TFFN insulation.
C. Cables: Provide UL-type factory-fabricated cables of sizes, ampacity ratings, and materials and jacketing/sheathing as indicated for services indicated. Where not indicated, provide proper selection as determined by Installer to comply with installation requirements, NEC and NEMA standards.
D. Connectors:
1. General: Provide UL-type factory-fabricated, metal connectors of sizes, ampacity ratings, materials, types and classes for applications and for services indicated.
Where not indicated, provide proper selection as determined by Installer to comply with project's installation requirements, NEC and NEMA standards. Select from the following, those types, classes, kinds, and styles of connectors to fulfill project requirements:
a. Type: Pressure.
b. Class: Insulated.
c. Kind: Copper (for Cu to Cu connection).
d. Style: Butt connection.
e. Style: Elbow connection.
f. Style: Combined "T" and straight connection.
g. Style: "T" connection.
h. Style: Split-bolt parallel connection.
I. Style: Tap connection.
j. Style: Pigtail connection.
k. Style: Wire nut connection.
PART 3 - EXECUTION
3.1 INSTALLATION OF WIRES AND CABLES
A. General: Install electrical cables, wires, and wiring connectors as indicated, in compliance with applicable requirements of NEC, NEMA, Ul, and NECA's "Standard of Installation", and in accordance with recognized industry practices.
B. Coordinate wire/cable installation work including electrical raceway and equipment installation work, as necessary to properly interface installation of wires/cables with other work.
C. Pull conductors simultaneously where more than one conductor is being installed in the same raceway.
D. Use pulling compound or lubricant, where necessary; compound used must not deteriorate conductor or insulation.
E. Use pulling means including, fish tape, cable, rope and basket weave or wire/cable grips which will not damage cables or raceway. Any cable damaged during installation shall be completely replaced.
F. Keep conductor splices to minimum. No joints shall be made in conductor except at junction boxes, outlet boxes or splice boxes. Newly installed conductors shall not be spliced unless specifically noted on the drawings. Splices shall not be permitted underground.
G. Install splices and tapes which possess equivalent-or-better mechanical strength and insulation ratings than conductors being spliced.
H. Use splice and tap connectors which are compatible with conductor material.
I. Tighten electrical connectors and terminals, including screws and bolts, in accordance with manufacturer's published torque tightening values. Where manufacturer's torqueing requirements are not indicated, tighten connectors and terminals to comply with tightening torques specified in UL Std 486A and B.
J. At least eight inches (8") of slack wire shall be left in every outlet box whether it be in use or left for future use.
K. Color code wiring as follows:
1. 120/208-volt, 3 phase, 4 wire: phase A-black, phase B-red, phase C-blue, neutral-white; ground conductor-green.
2. 277/480-volt, 3 phase, 4 wire: phase A-brown, phase B-orange, phase C-yellow, neutral-gray; ground conductor-green.
L. Wire and cable boxes and reels shall bear the date of manufacture and must not bear dates by more than one-year preceding contract date.
M. Minimum conductor sizes, except as specifically identified on the drawings, shall be as follows:
1. No. 12 - Branch circuits of any kind, except as specified otherwise below.
2. No. 14 - Signal systems, fire alarm system, unless specifically noted otherwise.
3. No. 10 - Exit light circuits, emergency circuits, security lighting, and exterior light circuits.
3.2 FIELD QUALITY CONTROL
A. Prior to energization, test wires and cables for electrical continuity and for short-circuits.
END OF SECTION 26 0519 – WIRES AND CABLES
SECTION 26 0526 - GROUNDING
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-01 Specification sections, apply to work of this section.
B. Division-26 Basic Electrical Materials and Methods section apply to work of this section.
1.2 DESCRIPTION OF WORK
A. Extent of grounding work is indicated by drawings and schedules.
B. Types of grounding specified in this section include the following:
1. Solid grounding
C. Applications of grounding work in this section including the following:
1. Lighting Poles
2. Services, feeders, and branch circuits
3. Grounding electrodes
4. Grounding rods
5. Service equipment
6. Enclosures
7. Equipment
8. Communications systems
1.3 QUALITY ASSURANCE
A. Manufacturers: Firms regularly engaged in manufacture of electrical connectors, terminals and fittings, of types and ratings required, and ancillary grounding materials, including stranded cable, copper braid and bus, ground rods and plate electrodes, whose products have been in satisfactory use in similar service for not less than 5 years.
B. Installer: Qualified with at least 5 years of successful installation experience on projects with electrical grounding work similar to that required for project.
C. NEC Compliance: Comply with NEC requirements as applicable to materials and installation of electrical grounding systems, associated equipment and wiring. Provide grounding products which are UL-listed and labeled.
D. UL Compliance: Comply with applicable requirements of UL Standards Nos. 467 and 869 pertaining to electrical grounding and bonding.
E. IEEE Compliance: Comply with applicable requirements of IEEE Standard 142 and 241 pertaining to electrical grounding.
1.4 SUBMITTALS
A. Product Data: Submit manufacturer's data on grounding systems and accessories.
B. Shop Drawings: Submit layout drawings of grounding systems and accessories including, but not limited to, ground wiring, copper braid and bus, ground rods, and plate electrodes.
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering grounding products which may be incorporated in the work include, but not limited to, the following:
1. Burndy Corp.
2. Crouse-Hinds Co.
3. Electrical Components Div.; Gould Inc.
4. Thomas and Betts Corp.
2.2 GROUNDING SYSTEMS
A. Materials and Components:
1. General: Except as otherwise indicated, provide electrical grounding systems indicated; with assembly of materials, including, but not limited to, cables/wires, connectors, terminals (solderless lugs), grounding rods/electrodes and plate electrodes, bonding jumper braid, surge arresters, and additional accessories needed for complete installation. Where more than one type unit meets indicated requirements, selection is Installer's option. Where materials or components are not indicated, provide products complying with NEC, UL, IEEE, and established industry standards for applications indicated.
B. Conductors: Unless otherwise indicated, provide electrical grounding conductors for grounding connections matching power supply wiring materials and sized according to
NEC.
C. Ground Rods: Solid copper or copper clad, minimum 3/4" dia. x 10'. Provide longer rods if necessary, for required resistivity.
D. Electrical Grounding Connection Accessories: Provide electrical insulating tape, heat-shrinkable insulating tubing, welding materials, bonding straps, as recommended by accessories manufacturers for type services indicated.
1. All grounding and bonding connections shall be exothermic weld type (CADWELD or equal), except where equipment or devices are provided with a factory supplied terminal connector that is listed for use with that device or equipment.
2. Refer to specification 26 41 13 for lightning protection requirements.
PART 3 - EXECUTION
3.1 INSPECTION
A. Installer must examine areas and conditions under which electrical grounding connections are to be made and notify Contractor in writing of conditions detrimental to proper completion of work. Do not proceed with work until unsatisfactory conditions have been corrected in a manner acceptable to Installer.
3.2 INSTALLATION OF ELECTRICAL GROUNDING
A. General: Install electrical grounding systems where shown, in accordance with applicable portions of NEC, with NECA's "Standard of Installation", and in accordance with recognized industry practices, to ensure that products comply with requirements and serve intended functions.
B. Coordinate with other electrical work as necessary to interface installation of electrical grounding system work with other work.
C. All ground connections to water service entrance shall be installed to be exposed and visible for inspection at all times. Insulation shall not be installed over ground connections.
D. A water pipe, by itself, is not an adequate grounding electrode and must be supplemented by dual 10-foot-long grounding electrodes, a minimum of 10 feet apart, and effectively bonded together.
E. Test the existing service entrance grounding electrode system and implement corrections or improvements as necessary to achieve 5 ohms or less resistance to ground. If required, provide a new service entrance grounding electrode system including bonding to metallic cold-water pipe, structural steel and building re-bar, if available.
F. All ground connections shall be made on surfaces which have been cleaned of all paint, dirt, oil, etc., so that connections are bare metal to bare metal contact. All ground connections shall be exothermic weld type (CADWELD or equal), except where equipment or devices are provided with a factory supplied terminal connector that is listed for use with that device or equipment.
I. In all cases where flexible metallic conduit, nonmetallic rigid conduit or liquid tight flexible conduit is used, a green wire ground conductor shall be used to provide ground continuity between the equipment of device and the conduit raceway system.
J. Provide a separate green wire ground conductor for each branch circuit originating from each panelboard. This ground shall be used to ground the device or load fed, and shall be bonded to components of the raceway system, such as junction boxes, starter or disconnect switch enclosures, equipment cases, etc. The green wire ground conductor shall terminate in the panelboard at the green wire ground bus. Ground conductors for branch circuits shall be of size indicated in NEC, except minimum size ground conductor shall be No. 12 AWG.
K. Each branch feeder originating at the main panel shall have a green wire ground conductor originating at the ground bus in the switchboard and terminating at the green wire ground bus in the panelboard. This green wire ground conductor shall be of size indicated in NEC except in no instance smaller than No. 8 AWG.
L. The green wire ground conductor is in addition to the neutral conductor and in no case shall the neutral conductor serve as the grounding means.
M. Multiple conductors in a single lug not permitted. Each grounding conductor shall terminate in its own terminal lug.
N. Grounding connections shall be tested and certified by the installer. The service entrance ground and each building ground shall have a maximum of 5 ohms resistance to ground.
Supplemental grounding shall be provided if necessary.
1. Grounding Tests: The resistance of electrodes (main service, building feeders, transformers, lighting poles, etc.) shall not exceed 5 ohms and shall be measured by the Contractor before equipment is placed in operation. Testing shall be performed on all grounding electrode installations. Testing shall be 2-point method in accordance with IEEE Standard 81. Submit all ground test readings to the Engineer in tabulated format, indicating each ground test location by main service, panel feeder tag, transformer tag, pole # and location, etc., at substantial completion.
END OF SECTION 26 0526 – GROUNDING
SECTION 26 0529 - SUPPORTING DEVICES
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-01 Specification sections, apply to work of this section.
B. This section is a Division-26 Basic Electrical Materials and Methods section and is a part of each Division-26 section making reference to electrical supporting devices specified herein.
1.2 DESCRIPTION OF WORK
A. Extent of supports, anchors, sleeves, and seals are indicated by drawings and schedules and/or specified in other Division-16 sections.
B. Types of supports, anchors, sleeves, and seals specified in this section include the following:
1. Clevis hangers
2. C-clamps
3. I-beam clamps
4. One-hole conduit straps
5. Round steel rods
6. Lead expansion anchors
7. Toggle bolts
8. Wall and floor seals
C. Supports, anchors, sleeves, and seals furnished as part of factory-fabricated equipment, are specified as part of that equipment assembly in other Division-26 sections.
1.3 QUALITY ASSURANCE
A. Manufacturers: Firms regularly engaged in manufacture of supporting devices, of types, sizes, and ratings required, whose products have been in satisfactory use in similar service for not less than 5 years.
B. NEC Compliance: Comply with NEC requirements as applicable to construction and installation of electrical supporting devices.
PART 2 - PRODUCTS
2.1 MANUFACTURED SUPPORTING DEVICES
A. General: Provide supporting devices which comply with manufacturer's standard materials, design and construction in accordance with published product information, and as required for complete installation; and as herein specified. Where more than one type of supporting device meets indicated requirements, selection is Installer's option.
B. Supports: Provide supporting devices of types, sizes, and materials indicated; and having the following construction features:
1. Clevis Hangers: For supporting 2" rigid metal conduit; galvanized steel; with 1/2" dia. hole for round steel rod; approximately 54 pounds per 100 units.
2. Reducing Couplings: Steel rod reducing coupling, 1/2" x 5/8"; black steel;
approximately 16 pounds per 100 units.
3. C-Clamps: Black malleable iron; 1/2" rod size; approximately 70 pounds per 100 units.
4. I-Beam Clamps: Black steel, 1-1/4" x 3/16" stock; 3/8" cross bolt; flange width 2";
approximately 52 pounds per 100 units.
5. One-Hole Conduit Straps: For supporting 3/4" rigid metal conduit; galvanized steel;
approximately 7 pounds per 100 units.
6. Hexagon Nuts: For 1/2" rod size; galvanized steel; approximately 4 pounds per 100 units.
7. Round Steel Rod: Black steel; 1/2" dia.; approximately 67 pounds per 100 feet.
8. Offset Conduit Clamps: For supporting 2" rigid metal conduit; black steel;
approximately 200 pounds per 100 units.
C. Anchors: Provide anchors of types, sizes, and materials indicated, with the following construction features:
1. Lead Expansion Anchors: 1/2", approximately 38 pounds per 100 units.
2. Toggle Bolts: Springhead; 3/16" x 4", approximately 5 pounds per 100 units.
D. Available Manufacturers: Subject to compliance with requirements, manufacturers offering anchors which may be incorporated in the work include, but are not limited to, the following:
1. Abbeon Cal Inc.
2. Ackerman Johnson Fastening Systems, Inc.
3. Elcen Metal Products Co.
4. Ideal Industries, Inc.
5. Joslyn Mfg. and Supply Co.
6. McGraw Edison Co.
7. Rawlplug Co., Inc.
8. Star Expansion Co.
9. Expansion Bolt Co.
E. Sleeves and Seals: Provide sleeves and seals, of types, sizes, and materials indicated, with the following construction features:
1. Wall and Floor Seals: Provide factory-assembled watertight wall and floor seals, of types and sizes indicated; suitable for sealing around conduit, pipe, or butting passing through concrete floors and walls. Construct seals with steel sleeves, malleable iron body, neoprene sealing grommets and rings, metal pressure rings, pressure clamps, and cap screws.
F. U-Channel Strut Systems: Provide U-channel strut system for supporting electrical equipment, 12-gage hot-dip galvanized steel, of types and sizes indicated; construct with 9/16" dia. holes, 8" o.c. on top surface, with standard finish, and with the following fittings which mate and match U-channel.
1. Fixture hangers
2. Channel hangers
3. Thin wall conduit clamps
4. Rigid conduit clamps
5. Conduit hangers
6. U-bolts
G. Available Manufacturers: Subject to compliance with requirements, manufacturers offering channel systems which may be incorporated in the work include, but are not limited to, the following:
1. Greenfield Mfg. Co.; Inc.
2. Midland-Ross Corp.
3. OZ/Gedney Div.; General Signal Corp.
4. Power-Strut Div.; Van Huffel Tube Corp.
5. Unistrut Div.; GTE Products Corp.
H. Pipe Sleeves: Provide pipe sleeves of one of the following:
1. Sheet Metal: Fabricate from galvanized sheet metal; round tube closed with snap lock joint, welded spiral seams, or welded longitudinal joint. Fabricate sleeves from the following gage metal: 3" and smaller, 20-gage; 4" to 6", 16-gage; over 6", 14-gage.
2. Steel Pipe: Fabricate from Schedule 40 galvanized steel pipe; remove burrs.
3. Iron Pipe: Fabricate from cast-iron or ductile-iron pipe; remove burrs.
4. Plastic Pipe: Fabricate from Schedule 80 PVC plas tic pipe; remove burrs.
I. Sleeve Seals: Provide sleeves for piping which penetrates foundation walls below grade, or exterior walls. Calk between sleeve and pipe with non-toxic, UL-classified calking material to ensure watertight seal.
PART 3 - EXECUTION
3.1 INSTALLATION OF SUPPORTING DEVICES
A. Install hangers, anchors, sleeves, and seals as indicated, in accordance with manufacturer's written instructions and with recognized industry practices to insure supporting devices comply with requirements. Comply with requirements of NECA and NEC for installation of supporting devices.
B. Coordinate with other electrical work, including raceway and wiring work, as necessary to interface installation of supporting devices with other work.