13 05 41 Seismic Restraint Requirements for Non Structural Components.doc

DOC document 41 KB Posted

Attached to
Y1DA--NRM: 640A4-21-905 Remove Bulk Oxygen Storage Bldg. 62
Solicitation number
36C26121Q0188-01
Issued by

View the file

Other files

File Type Posted
01 32 16 15 Project SCHEDULES.docx DOCX document
Wage Determination CA20190018 11.15.19.pdf PDF
02 41 00 Demolition.docx DOCX document
01 45 00 QUALITY CONTROL.docx DOCX document
01 00 00 General Requirements.docx DOCX document
26 05 11 REQUIREMENTS FOR ELECTRICAL INSTALLATION.docx DOCX document
36C26121Q0188.docx DOCX document
NFPA Medical Gas Cylinder Storage.pdf PDF
S02 - RFI FORM.docx DOCX document
NFPA2050.png PNG image
01 35 26 SAFETY REQUIREMENTS.docx DOCX document
01 33 23 SHOP DRAWINGS PRODUCT DATA AND SAMPLES.docx DOCX document
01 42 19 Reference Standards.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01-01-14

SECTION 13 05 41

SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS

PART 1 – GENERAL

1.1 DESCRIPTION:

A.

Provide seismic restraint in accordance with the requirements of this section in order to maintain the integrity of nonstructural components of the building so that they remain safe and functional in case of seismic event.

B.

The design to resist seismic load shall be based on Seismic Design Categories per section 4.0 of the VA Seismic Design Requirements (H-18-8) dated August 2013,http://www.cfm.va.gov/til/etc/seismic.pdf.

C.

Definitions: Non-structural building components are components or systems that are not part of the building’s structural system whether inside or outside, above or below grade. Non-structural components of buildings include:

1.

Architectural Elements: Facades that are not part of the structural system and its shear resistant elements; cornices and other architectural projections and parapets that do not function structurally; glazing; nonbearing partitions; suspended ceilings; stairs isolated from the basic structure; cabinets; bookshelves; medical equipment; and storage racks.

2.

Electrical Elements: Power and lighting systems; substations; switchgear and switchboards; auxiliary engine-generator sets; transfer switches; motor control centers; motor generators; selector and controller panels; fire protection and alarm systems; special life support systems; and telephone and communication systems.

3.

Mechanical Elements: Heating, ventilating, and air-conditioning systems; medical gas systems; plumbing systems; sprinkler systems; pneumatic systems; boiler equipment and components.

4.

Transportation Elements: Mechanical, electrical and structural elements for transport systems, i.e., elevators and dumbwaiters, including hoisting equipment and counterweights.

1.3 QUALITY CONTROL:

A.

Shop-Drawing Preparation:

1.

Have seismic-force-restraint shop drawings and calculations prepared by a professional structural engineer experienced in the area of seismic force restraints. The professional structural engineer shall be registered in the state where the project is located.

2.

Submit design tables and information used for the design-force levels, stamped and signed by a professional structural engineer registered in the State where project is located.

B.

Coordination:

1.

Do not install seismic restraints until seismic restraint submittals are approved by the Resident Engineer.

2.

Coordinate and install trapezes or other multi-pipe hanger systems prior to pipe installation.

C.

Seismic Certification:

In structures assigned to IBC Seismic Design Category C, D, E, or F, permanent equipments and components are to have Special Seismic Certification in accordance with requirements of section 13.2.2 of ASCE 7 except for equipment that are considered rugged as listed in section 2.2 OSHPD code application notice CAN No. 2-1708A.5, and shall comply with section 13.2.6 of ASCE 7.

1.4 SUBMITTALS:

A.

Submit a coordinated set of equipment anchorage drawings prior to installation including:

1.

Description, layout, and location of items to be anchored or braced with anchorage or brace points noted and dimensioned.

2.

Details of anchorage or bracing at large scale with all members, parts brackets shown, together with all connections, bolts, welds etc. clearly identified and specified.

3.

Numerical value of design seismic brace loads.

4.

For expansion bolts, include design load and capacity if different from those specified.

B.

Submit prior to installation, a coordinated set of bracing drawings for seismic protection of piping, with data identifying the various support-to-structure connections and seismic bracing structural connections, include:

1.

Single-line piping diagrams on a floor-by-floor basis. Show all suspended piping for a given floor on the same plain.

2.

Type of pipe (Copper, steel, cast iron, insulated, non-insulated, etc.).

3.

Pipe contents.

4.

Structural framing.

5.

Location of all gravity load pipe supports and spacing requirements.

6.

Numerical value of gravity load reactions.

7.

Location of all seismic bracing.

8.

Numerical value of applied seismic brace loads.

9.

Type of connection (Vertical support, vertical support with seismic brace etc.).

10.

Seismic brace reaction type (tension or compression): Details illustrating all support and bracing components, methods of connections, and specific anchors to be used.

C.

Submit prior to installation, bracing drawings for seismic protection of suspended ductwork and suspended electrical and communication cables, include:

1.

Details illustrating all support and bracing components, methods of connection, and specific anchors to be used.

2.

Numerical value of applied gravity and seismic loads and seismic loads acting on support and bracing components.

3.

Maximum spacing of hangers and bracing.

4.

Seal of registered structural engineer responsible for design.

D.

Submit design calculations prepared and sealed by the registered structural engineer specified above in paragraph 1.3A.

E.

Submit for concrete anchors, the appropriate ICBC evaluation reports, OSHPD pre-approvals, or lab test reports verifying compliance with OSHPD Interpretation of Regulations 28-6.

1.5 APPLICABLE PUBLICATIONS:

A.

The Publications listed below (including amendments, addenda revisions, supplements and errata) form a part of this specification to the extent referenced. The publications are referenced in text by basic designation only.

B.

American Concrete Institute (ACI):

355.2-07 Qualification for Post-Installed Mechanical Anchors in Concrete and Commentary C.

American Institute of Steel Construction (AISC):

Load and Resistance Factor Design, Volume 1, Second Edition D.

American Society for Testing and Materials (ASTM):

A36/A36M-08 Standard Specification for Carbon Structural Steel A53/A53M-10 Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless A307-10 Standard Specification for Carbon Steel Bolts and Studs; 60,000 PSI Tensile Strength.

A325-10 Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength A325M-09 Standard Specification for High-Strength Bolts for Structural Steel Joints [Metric] A490-10 Standard Specification for Heat-Treated Steel Structural Bolts, 150 ksi Minimum Tensile Strength A490M-10 Standard Specification for High-Strength Steel Bolts, Classes 10.9 and 10.9.3, for Structural Steel Joints [Metric] A500/A500M-10 Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes A501-07 Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing A615/A615M-09 Standard Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement A992/A992M-06 Standard Specification for Steel for Structural Shapes for Use in Building Framing A996/A996M-09 Standard Specification for Rail-Steel and Axel-Steel Deformed Bars for Concrete Reinforcement E488-96(R2003) Standard Test Method for Strength of Anchors in Concrete and Masonry Element E.

American Society of Civil Engineers (ASCE 7) Latest Edition.

F.

International Building Code (IBC) Latest Edition G.

VA Seismic Design Requirements, H-18-8, August 2013 H.

National Uniform Seismic Installation Guidelines (NUSIG) I.

Sheet Metal and Air Conditioning Contractors National Association

(SMACNA): Seismic Restraint Manual - Guidelines for Mechanical Systems, 1998 Edition and Addendum

1.6 Regulatory Requirement:

A.

IBC Latest Edition.

1.

Equipment weighing less than 20 pounds, which is suspended from the roof or floor or hung from a wall.

2.

Gas and medical piping less than 2 ½ inches inside diameter.

3.

Piping in boiler plants and equipment rooms less than 1 ¼ inches inside diameter.

4.

All other piping less than 2 ½ inches inside diameter, except for automatic fire suppression systems.

5.

All piping suspended by individual hangers, 12 inches or less in length from the top of pipe to the bottom of the support for the hanger.

6.

All electrical conduits, less than 2 ½ inches inside diameter.

7.

All rectangular air handling ducts less than six square feet in cross sectional area.

8.

All round air handling ducts less than 28 inches in diameter.

9.

All ducts suspended by hangers 12 inches or less in length from the top of the duct to the bottom of support for the hanger.

PART 2 – PRODUCTS

PART 3 – EXECUTION

3.1 CONSTRUCTION, GENERAL:

A.

Provide equipment supports and anchoring devices to withstand the seismic design forces, so that when seismic design forces are applied, the equipment cannot displace, overturn, or become inoperable.

B.

Provide anchorages in conformance with recommendations of the equipment manufacturer and as shown on approved shop drawings and calculations.

C.

Construct seismic restraints and anchorage to allow for thermal expansion.

D.

Testing Before Final Inspection:

1.

Test 10-percent of anchors in masonry and concrete per ASTM E488, and ACI 355.2 to determine that they meet the required load capacity. If any anchor fails to meet the required load, test the next 20 consecutive anchors, which are required to have zero failure, before resuming the 10‑percent testing frequency.

2.

Before scheduling Final Inspection, submit a report on this testing indicating the number and location of testing, and what anchor-loads were obtained.

3.2 EQUIPMENT RESTRAINT AND BRACING:

A.

See drawings for equipment to be restrained or braced.

3.3 MECHANICAL DUCTWORK and piping; boiler plant stacks and breaching; electrical busways, conduits, and cable trays; and telecommunication wires and cable trays

A.

Support and brace mechanical ductwork and piping; electrical busways, conduits and cable trays; and telecommunication wires and cable trays including boiler plant stacks and breeching to resist directional forces (lateral, longitudinal and vertical).

B.

Brace duct and breeching branches with a minimum of 1 brace per branch.

D.

Provide supports and anchoring so that, upon application of seismic forces, piping remains fully connected as operable systems which will not displace sufficiently to damage adjacent or connecting equipment or building members.

E.

Seismic Restraint of Piping:

1.

Design criteria:

a.

Piping resiliently supported: Restrain to support 120 ‑percent of the weight of the systems and components and contents.

b.

Piping not resiliently supported: Restrain to support 60 ‑percent of the weight of the system components and contents.

2.

Provide seismic restraints according to one of the following options:

F.

Piping Connections: Provide flexible connections where pipes connect to equipment. Make the connections capable of accommodating relative differential movements between the pipe and equipment under conditions of earthquake shaking.

13 05 41 - 1